IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v60-61y1999i1p125-134.html
   My bibliography  Save this article

Impact of commonality and flexibility on manufacturing performance: A simulation study

Author

Listed:
  • Nagarur, Nagen
  • Azeem, Abdullahil

Abstract

No abstract is available for this item.

Suggested Citation

  • Nagarur, Nagen & Azeem, Abdullahil, 1999. "Impact of commonality and flexibility on manufacturing performance: A simulation study," International Journal of Production Economics, Elsevier, vol. 60(1), pages 125-134, April.
  • Handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:125-134
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00198-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Unknown, 1986. "Letters," Choices: The Magazine of Food, Farm, and Resource Issues, Agricultural and Applied Economics Association, vol. 1(4), pages 1-9.
    2. Kenneth R. Baker & Michael J. Magazine & Henry L. W. Nuttle, 1986. "The Effect of Commonality on Safety Stock in a Simple Inventory Model," Management Science, INFORMS, vol. 32(8), pages 982-988, August.
    3. Yigal Gerchak & Michael J. Magazine & A. Bruce Gamble, 1988. "Component Commonality with Service Level Requirements," Management Science, INFORMS, vol. 34(6), pages 753-760, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Louise Bildsten, 2014. "Buyer-supplier relationships in industrialized building," Construction Management and Economics, Taylor & Francis Journals, vol. 32(1-2), pages 146-159, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lee, Loo Hay & Chew, Ek Peng & Manikam, Puvaneswari, 2006. "A general framework on the simulation-based optimization under fixed computing budget," European Journal of Operational Research, Elsevier, vol. 174(3), pages 1828-1841, November.
    2. Albert Y. Ha, 2000. "Stock Rationing in an M/E k /1 Make-to-Stock Queue," Management Science, INFORMS, vol. 46(1), pages 77-87, January.
    3. Ma, Shihua & Wang, Wei & Liu, Liming, 2002. "Commonality and postponement in multistage assembly systems," European Journal of Operational Research, Elsevier, vol. 142(3), pages 523-538, November.
    4. Hong, Yoo Suk & Huh, Woonghee Tim & Kang, Changmuk, 2017. "Sourcing assemble-to-order inventories under supplier risk uncertainty," Omega, Elsevier, vol. 66(PA), pages 1-14.
    5. Nonås, Sigrid Lise, 2009. "Finding and identifying optimal inventory levels for systems with common components," European Journal of Operational Research, Elsevier, vol. 193(1), pages 98-119, February.
    6. Zhang, Xiaohong & Ou, Jihong & Gilbert, Stephen M., 2008. "Coordination of stocking decisions in an assemble-to-order environment," European Journal of Operational Research, Elsevier, vol. 189(2), pages 540-558, September.
    7. Hausman, Warren H. & Lee, Hau L. & Zhang, Alex X., 1998. "Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies," European Journal of Operational Research, Elsevier, vol. 109(3), pages 646-659, September.
    8. Kim, Kilsun & Chhajed, Dilip, 2000. "Commonality in product design: Cost saving, valuation change and cannibalization," European Journal of Operational Research, Elsevier, vol. 125(3), pages 602-621, September.
    9. Amit Eynan & Meir J. Rosenblatt, 2007. "The impact of component commonality on composite assembly policies," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(6), pages 615-622, September.
    10. Hsieh, Ying-Jiun, 2011. "Demand switching criteria for multiple products: An inventory cost analysis," Omega, Elsevier, vol. 39(2), pages 130-137, April.
    11. Anantaram Balakrishnan & Joseph Geunes, 2000. "Requirements Planning with Substitutions: Exploiting Bill-of-Materials Flexibility in Production Planning," Manufacturing & Service Operations Management, INFORMS, vol. 2(2), pages 166-185, January.
    12. Hillier, Mark S., 2002. "Using commonality as backup safety stock," European Journal of Operational Research, Elsevier, vol. 136(2), pages 353-365, January.
    13. Yalçın Akçay & Yunke Li & Harihara Prasad Natarajan, 2020. "Category Inventory Planning With Service Level Requirements and Dynamic Substitutions," Production and Operations Management, Production and Operations Management Society, vol. 29(11), pages 2553-2578, November.
    14. Wong, Hartanto & Lesmono, Dharma & Chhajed, Dilip & Kim, Kilsun, 2019. "On the evaluation of commonality strategy in product line design: The effect of valuation change and distribution channel structure," Omega, Elsevier, vol. 83(C), pages 14-25.
    15. Jeet, Vishv & Kutanoglu, Erhan, 2018. "Part commonality effects on integrated network design and inventory models for low-demand service parts logistics systems," International Journal of Production Economics, Elsevier, vol. 206(C), pages 46-58.
    16. Stephen A. Smith & Narendra Agrawal, 2000. "Management of Multi-Item Retail Inventory Systems with Demand Substitution," Operations Research, INFORMS, vol. 48(1), pages 50-64, February.
    17. Antoine Deza & Kai Huang & Hongfeng Liang & Xiao Jiao Wang, 2018. "On component commonality for periodic review assemble-to-order systems," Annals of Operations Research, Springer, vol. 265(1), pages 29-46, June.
    18. Amit Eynan & Thierry Fouque, 2003. "Capturing the Risk-Pooling Effect Through Demand Reshape," Management Science, INFORMS, vol. 49(6), pages 704-717, June.
    19. Fernando Bernstein & Gregory A. DeCroix & Yulan Wang, 2007. "Incentives and Commonality in a Decentralized Multiproduct Assembly System," Operations Research, INFORMS, vol. 55(4), pages 630-646, August.
    20. de Kok, Ton G. & Visschers, Jeremy W. C. H., 1999. "Analysis of assembly systems with service level constraints," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 313-326, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:60-61:y:1999:i:1:p:125-134. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.