IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v142y2002i3p523-538.html
   My bibliography  Save this article

Commonality and postponement in multistage assembly systems

Author

Listed:
  • Ma, Shihua
  • Wang, Wei
  • Liu, Liming

Abstract

No abstract is available for this item.

Suggested Citation

  • Ma, Shihua & Wang, Wei & Liu, Liming, 2002. "Commonality and postponement in multistage assembly systems," European Journal of Operational Research, Elsevier, vol. 142(3), pages 523-538, November.
  • Handle: RePEc:eee:ejores:v:142:y:2002:i:3:p:523-538
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(01)00314-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hau L. Lee, 1996. "Effective Inventory and Service Management Through Product and Process Redesign," Operations Research, INFORMS, vol. 44(1), pages 151-159, February.
    2. Jonsson, Henrik & Silver, Edward A., 1989. "Optimal and heuristic solutions for a simple common component inventory problem," Engineering Costs and Production Economics, Elsevier, vol. 16(4), pages 257-267, July.
    3. Markus Ettl & Gerald E. Feigin & Grace Y. Lin & David D. Yao, 2000. "A Supply Network Model with Base-Stock Control and Service Requirements," Operations Research, INFORMS, vol. 48(2), pages 216-232, April.
    4. Jonsson, Henrik & Jornsten, Kurt & Silver, Edward A., 1993. "Application of the scenario aggregation approach to a two-stage, stochastic, common component, inventory problem with a budget constraint," European Journal of Operational Research, Elsevier, vol. 68(2), pages 196-211, July.
    5. Kenneth R. Baker & Michael J. Magazine & Henry L. W. Nuttle, 1986. "The Effect of Commonality on Safety Stock in a Simple Inventory Model," Management Science, INFORMS, vol. 32(8), pages 982-988, August.
    6. David A. Collier, 1982. "Aggregate Safety Stock Levels and Component Part Commonality," Management Science, INFORMS, vol. 28(11), pages 1296-1303, November.
    7. Hau L. Lee & Christopher S. Tang, 1997. "Modelling the Costs and Benefits of Delayed Product Differentiation," Management Science, INFORMS, vol. 43(1), pages 40-53, January.
    8. Yigal Gerchak & Michael J. Magazine & A. Bruce Gamble, 1988. "Component Commonality with Service Level Requirements," Management Science, INFORMS, vol. 34(6), pages 753-760, June.
    9. Unknown, 1986. "Letters," Choices: The Magazine of Food, Farm, and Resource Issues, Agricultural and Applied Economics Association, vol. 1(4), pages 1-9.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dellaert, Nico & de Kok, Ton, 2004. "Integrating resource and production decisions in a simple multi-stage assembly system," International Journal of Production Economics, Elsevier, vol. 90(3), pages 281-294, August.
    2. Mohebbi, E. & Choobineh, F., 2005. "The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty," Omega, Elsevier, vol. 33(6), pages 472-482, December.
    3. Zhang, Xinyan & Huang, George Q., 2010. "Game-theoretic approach to simultaneous configuration of platform products and supply chains with one manufacturing firm and multiple cooperative suppliers," International Journal of Production Economics, Elsevier, vol. 124(1), pages 121-136, March.
    4. Li, Jian & Edwin Cheng, T.C. & Wang, Shouyang, 2007. "Analysis of postponement strategy for perishable items by EOQ-based models," International Journal of Production Economics, Elsevier, vol. 107(1), pages 31-38, May.
    5. Patrick Afflerbach & Manuel Bolsinger & Maximilian Röglinger, 2016. "An economic decision model for determining the appropriate level of business process standardization," Business Research, Springer;German Academic Association for Business Research, vol. 9(2), pages 335-375, August.
    6. Fogliatto, Flavio S. & da Silveira, Giovani J.C. & Borenstein, Denis, 2012. "The mass customization decade: An updated review of the literature," International Journal of Production Economics, Elsevier, vol. 138(1), pages 14-25.
    7. Yao, Jianming & Liu, Liwen, 2009. "Optimization analysis of supply chain scheduling in mass customization," International Journal of Production Economics, Elsevier, vol. 117(1), pages 197-211, January.
    8. Ngniatedema, Thomas & Shanker, Murali & Hu, Michael Y. & Guiffrida, Alfred L. & Eddy Patuwo, B., 2015. "Late customization strategy with service levels requirements," International Journal of Production Economics, Elsevier, vol. 166(C), pages 72-84.
    9. Jans, Raf & Degraeve, Zeger & Schepens, Luc, 2008. "Analysis of an industrial component commonality problem," European Journal of Operational Research, Elsevier, vol. 186(2), pages 801-811, April.
    10. Xiong, Yixuan & Du, Gang & Jiao, Roger J., 2018. "Modular product platforming with supply chain postponement decisions by leader-follower interactive optimization," International Journal of Production Economics, Elsevier, vol. 205(C), pages 272-286.
    11. Ngniatedema, Thomas & Fono, Louis Aimé & Mbondo, Georges Dieudonné, 2015. "A delayed product customization cost model with supplier delivery performance," European Journal of Operational Research, Elsevier, vol. 243(1), pages 109-119.
    12. Li, Jian & Wang, Shouyang & Cheng, T.C. Edwin, 2008. "Analysis of postponement strategy by EPQ-based models with planned backorders," Omega, Elsevier, vol. 36(5), pages 777-788, October.
    13. Song, Zhe & Kusiak, Andrew, 2010. "Mining Pareto-optimal modules for delayed product differentiation," European Journal of Operational Research, Elsevier, vol. 201(1), pages 123-128, February.
    14. Weskamp, Christoph & Koberstein, Achim & Schwartz, Frank & Suhl, Leena & Voß, Stefan, 2019. "A two-stage stochastic programming approach for identifying optimal postponement strategies in supply chains with uncertain demand," Omega, Elsevier, vol. 83(C), pages 123-138.
    15. Graman, Gregory A., 2010. "A partial-postponement decision cost model," European Journal of Operational Research, Elsevier, vol. 201(1), pages 34-44, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hillier, Mark S., 2002. "Using commonality as backup safety stock," European Journal of Operational Research, Elsevier, vol. 136(2), pages 353-365, January.
    2. Nonås, Sigrid Lise, 2009. "Finding and identifying optimal inventory levels for systems with common components," European Journal of Operational Research, Elsevier, vol. 193(1), pages 98-119, February.
    3. Droge, Cornelia & Vickery, Shawnee K. & Jacobs, Mark A., 2012. "Does supply chain integration mediate the relationships between product/process strategy and service performance? An empirical study," International Journal of Production Economics, Elsevier, vol. 137(2), pages 250-262.
    4. Jiri Chod & David Pyke & Nils Rudi, 2010. "The Value of Flexibility in Make-to-Order Systems: The Effect of Demand Correlation," Operations Research, INFORMS, vol. 58(4-part-1), pages 834-848, August.
    5. Zhang, Juliang & Shou, Biying & Chen, Jian, 2013. "Postponed product differentiation with demand information update," International Journal of Production Economics, Elsevier, vol. 141(2), pages 529-540.
    6. Albert Y. Ha, 2000. "Stock Rationing in an M/E k /1 Make-to-Stock Queue," Management Science, INFORMS, vol. 46(1), pages 77-87, January.
    7. Kyle Cattani & Geraldo Ferrer & Wendell Gilland, 2003. "Simultaneous production of market‐specific and global products: A two‐stage stochastic program with additional demand after recourse," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(5), pages 438-461, August.
    8. Lee, Loo Hay & Chew, Ek Peng & Manikam, Puvaneswari, 2006. "A general framework on the simulation-based optimization under fixed computing budget," European Journal of Operational Research, Elsevier, vol. 174(3), pages 1828-1841, November.
    9. Alfaro, José A. & Corbett, Charles J., 2000. "The value of SKU rationalization: the pooling effect under suboptimal inventory policies," DEE - Working Papers. Business Economics. WB 9917, Universidad Carlos III de Madrid. Departamento de Economía de la Empresa.
    10. Jeet, Vishv & Kutanoglu, Erhan, 2018. "Part commonality effects on integrated network design and inventory models for low-demand service parts logistics systems," International Journal of Production Economics, Elsevier, vol. 206(C), pages 46-58.
    11. Antoine Deza & Kai Huang & Hongfeng Liang & Xiao Jiao Wang, 2018. "On component commonality for periodic review assemble-to-order systems," Annals of Operations Research, Springer, vol. 265(1), pages 29-46, June.
    12. Eva Labro, 2004. "The Cost Effects of Component Commonality: A Literature Review Through a Management-Accounting Lens," Manufacturing & Service Operations Management, INFORMS, vol. 6(4), pages 358-367, June.
    13. Narendra Agrawal & Morris A. Cohen, 2001. "Optimal material control in an assembly system with component commonality," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 409-429, August.
    14. Ulrich W. Thonemann & Margaret L. Brandeau, 2000. "Optimal Commonality in Component Design," Operations Research, INFORMS, vol. 48(1), pages 1-19, February.
    15. Mohebbi, E. & Choobineh, F., 2005. "The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty," Omega, Elsevier, vol. 33(6), pages 472-482, December.
    16. Hong, Yoo Suk & Huh, Woonghee Tim & Kang, Changmuk, 2017. "Sourcing assemble-to-order inventories under supplier risk uncertainty," Omega, Elsevier, vol. 66(PA), pages 1-14.
    17. Yalçin Akçay & Susan H. Xu, 2004. "Joint Inventory Replenishment and Component Allocation Optimization in an Assemble-to-Order System," Management Science, INFORMS, vol. 50(1), pages 99-116, January.
    18. Anand Paul & Asoo J. Vakharia, 2006. "Requirements planning for modular products," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(5), pages 418-431, August.
    19. Nagarur, Nagen & Azeem, Abdullahil, 1999. "Impact of commonality and flexibility on manufacturing performance: A simulation study," International Journal of Production Economics, Elsevier, vol. 60(1), pages 125-134, April.
    20. Mark S. Hillier, 1999. "Product commonality in multiple‐period, make‐to‐stock systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(6), pages 737-751, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:142:y:2002:i:3:p:523-538. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.