IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v163y2005i2p569-571.html
   My bibliography  Save this article

Open shops with jobs overlap--revisited

Author

Listed:
  • Leung, Joseph Y-T.
  • Li, Haibing
  • Pinedo, Michael
  • Sriskandarajah, Chelliah

Abstract

No abstract is available for this item.

Suggested Citation

  • Leung, Joseph Y-T. & Li, Haibing & Pinedo, Michael & Sriskandarajah, Chelliah, 2005. "Open shops with jobs overlap--revisited," European Journal of Operational Research, Elsevier, vol. 163(2), pages 569-571, June.
  • Handle: RePEc:eee:ejores:v:163:y:2005:i:2:p:569-571
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(03)00921-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chang Sup Sung & Sang Hum Yoon, 1998. "Minimizing total weighted completion time at a pre-assembly stage composed of two feeding machines," International Journal of Production Economics, Elsevier, vol. 54(3), pages 247-255, May.
    2. Wagneur, E. & Sriskandarajah, C., 1993. "Openshops with jobs overlap," European Journal of Operational Research, Elsevier, vol. 71(3), pages 366-378, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Leung, Joseph Y.-T. & Lee, C.Y. & Ng, C.W. & Young, G.H., 2008. "Preemptive multiprocessor order scheduling to minimize total weighted flowtime," European Journal of Operational Research, Elsevier, vol. 190(1), pages 40-51, October.
    2. Wang, Guoqing & Cheng, T.C. Edwin, 2007. "Customer order scheduling to minimize total weighted completion time," Omega, Elsevier, vol. 35(5), pages 623-626, October.
    3. Lung-Yu Li & Jian-You Xu & Shuenn-Ren Cheng & Xingong Zhang & Win-Chin Lin & Jia-Cheng Lin & Zong-Lin Wu & Chin-Chia Wu, 2022. "A Genetic Hyper-Heuristic for an Order Scheduling Problem with Two Scenario-Dependent Parameters in a Parallel-Machine Environment," Mathematics, MDPI, vol. 10(21), pages 1-22, November.
    4. B. M. T. Lin & T. C. E. Cheng, 2011. "Scheduling with centralized and decentralized batching policies in concurrent open shops," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(1), pages 17-27, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. T.C. Edwin Cheng & Qingqin Nong & Chi To Ng, 2011. "Polynomial‐time approximation scheme for concurrent open shop scheduling with a fixed number of machines to minimize the total weighted completion time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(8), pages 763-770, December.
    2. Ren-Xia Chen & Shi-Sheng Li, 2020. "Minimizing maximum delivery completion time for order scheduling with rejection," Journal of Combinatorial Optimization, Springer, vol. 40(4), pages 1044-1064, November.
    3. Wang, Guoqing & Cheng, T.C. Edwin, 2007. "Customer order scheduling to minimize total weighted completion time," Omega, Elsevier, vol. 35(5), pages 623-626, October.
    4. Framinan, Jose M. & Perez-Gonzalez, Paz & Fernandez-Viagas, Victor, 2019. "Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures," European Journal of Operational Research, Elsevier, vol. 273(2), pages 401-417.
    5. Leung, Joseph Y.-T. & Li, Haibing & Pinedo, Michael, 2006. "Scheduling orders for multiple product types with due date related objectives," European Journal of Operational Research, Elsevier, vol. 168(2), pages 370-389, January.
    6. Leung, Joseph Y.-T. & Lee, C.Y. & Ng, C.W. & Young, G.H., 2008. "Preemptive multiprocessor order scheduling to minimize total weighted flowtime," European Journal of Operational Research, Elsevier, vol. 190(1), pages 40-51, October.
    7. Joseph Leung & Haibing Li & Michael Pinedo, 2008. "Scheduling orders on either dedicated or flexible machines in parallel to minimize total weighted completion time," Annals of Operations Research, Springer, vol. 159(1), pages 107-123, March.
    8. Framinan, Jose M. & Perez-Gonzalez, Paz, 2018. "Order scheduling with tardiness objective: Improved approximate solutions," European Journal of Operational Research, Elsevier, vol. 266(3), pages 840-850.
    9. Kai Wang & Vincent Chau & Minming Li, 2018. "Scheduling fully parallel jobs," Journal of Scheduling, Springer, vol. 21(6), pages 619-631, December.
    10. Lung-Yu Li & Jian-You Xu & Shuenn-Ren Cheng & Xingong Zhang & Win-Chin Lin & Jia-Cheng Lin & Zong-Lin Wu & Chin-Chia Wu, 2022. "A Genetic Hyper-Heuristic for an Order Scheduling Problem with Two Scenario-Dependent Parameters in a Parallel-Machine Environment," Mathematics, MDPI, vol. 10(21), pages 1-22, November.
    11. Fernandez-Viagas, Victor & Talens, Carla & Framinan, Jose M., 2022. "Assembly flowshop scheduling problem: Speed-up procedure and computational evaluation," European Journal of Operational Research, Elsevier, vol. 299(3), pages 869-882.
    12. Tal Grinshpoun & Hagai Ilani & Elad Shufan, 2017. "The representation of partially-concurrent open shop problems," Annals of Operations Research, Springer, vol. 252(2), pages 455-469, May.
    13. Lin, B.M.T. & Kononov, A.V., 2007. "Customer order scheduling to minimize the number of late jobs," European Journal of Operational Research, Elsevier, vol. 183(2), pages 944-948, December.
    14. Joseph Y‐T. Leung & Haibing Li & Michael Pinedo, 2006. "Approximation algorithms for minimizing total weighted completion time of orders on identical machines in parallel," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(4), pages 243-260, June.
    15. Husam Dauod & Nieqing Cao & Debiao Li & Jaehee Kim & Sang Won Yoon & Daehan Won, 2023. "An Order Scheduling Heuristic to Minimize the Total Collation Delays and the Makespan in High-Throughput Make-to-Order Manufacturing Systems," SN Operations Research Forum, Springer, vol. 4(2), pages 1-23, June.
    16. Hagai Ilani & Elad Shufan & Tal Grinshpoun, 2017. "Partially concurrent open shop scheduling with integral preemptions," Annals of Operations Research, Springer, vol. 259(1), pages 157-171, December.
    17. B. M. T. Lin & T. C. E. Cheng, 2011. "Scheduling with centralized and decentralized batching policies in concurrent open shops," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(1), pages 17-27, February.
    18. Lee, Ik Sun, 2013. "Minimizing total tardiness for the order scheduling problem," International Journal of Production Economics, Elsevier, vol. 144(1), pages 128-134.
    19. Yoon, Sang Hum & Sung, Chang Sup, 2005. "Fixed pre-assembly scheduling on multiple fabrication machines," International Journal of Production Economics, Elsevier, vol. 96(1), pages 109-118, April.
    20. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:163:y:2005:i:2:p:569-571. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.