Deskilling and reskilling within the labour process: The case of computer integrated manufacturing
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- אסתר טולידנו, 1988. "מקבלי דמי אבטלה בשנת 1987," Working Papers 374, National Insurance Institute of Israel.
- Rowlinson, Michael & Procter, Stephen & Hassard, John, 1994. "CIM and the process of innovation: Integrating the organization of production," International Journal of Production Economics, Elsevier, vol. 34(3), pages 359-369, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Waldeck, Nancy E. & Leffakis, Zachary M., 2007. "HR perceptions and the provision of workforce training in an AMT environment: An empirical study," Omega, Elsevier, vol. 35(2), pages 161-172, April.
- Bonnin Roca, Jaime & O'Sullivan, Eoin, 2020. "Seeking coherence between barriers to manufacturing technology adoption and innovation policy," International Journal of Production Economics, Elsevier, vol. 230(C).
- Rimler, Judit, 2003. "Ecset vagy egér. Mesterségbeli tudás és magas szintű technika [Brush or mouse. Occupational capabilities and high technology]," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(12), pages 1095-1114.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Portnov, B. A. & Etzion, Y., 2000. "Investigating the effects of public policy on the interregional patterns of population growth: the case of Israel," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 239-269, December.
- Antunes, Antonio & Peeters, Dominique, 2000.
"A dynamic optimization model for school network planning,"
Socio-Economic Planning Sciences, Elsevier, vol. 34(2), pages 101-120, June.
- ANTUNES, Antonio & PEETERS, Dominique, 2000. "A dynamic optimization model for school network planning," LIDAM Reprints CORE 1440, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Osterrieder, Philipp & Budde, Lukas & Friedli, Thomas, 2020. "The smart factory as a key construct of industry 4.0: A systematic literature review," International Journal of Production Economics, Elsevier, vol. 221(C).
- Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
- Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
- Malczewski, Jacek & Jackson, Marlene, 2000. "Multicriteria spatial allocation of educational resources: an overview," Socio-Economic Planning Sciences, Elsevier, vol. 34(3), pages 219-235, September.
- Berden, Thijs P. J. & Brombacher, Aarnout C. & Sander, Peter C., 2000. "The building bricks of product quality: An overview of some basic concepts and principles," International Journal of Production Economics, Elsevier, vol. 67(1), pages 3-15, August.
- Albino, Vito & Izzo, Carmen & Kuhtz, Silvana, 2002. "Input-output models for the analysis of a local/global supply chain," International Journal of Production Economics, Elsevier, vol. 78(2), pages 119-131, July.
- Jensen, Hector A. & Maturana, Sergio, 2002. "A possibilistic decision support system for imprecise mathematical programming problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 145-158, May.
- Tayles, Mike & Walley, Paul, 1997. "Integrating manufacturing and management accounting strategy: case study insights," International Journal of Production Economics, Elsevier, vol. 53(1), pages 43-55, November.
- Vastag, Gyula & Montabon, Frank, 2001. "Linkages among manufacturing concepts, inventories, delivery service and competitiveness," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 195-204, May.
- Palocsay, Susan W. & Wang, Ping & Brookshire, Robert G., 2000. "Predicting criminal recidivism using neural networks," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 271-284, December.
- Ertugrul Karsak, E. & Tolga, Ethem, 2001. "Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments," International Journal of Production Economics, Elsevier, vol. 69(1), pages 49-64, January.
- Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
- Schippers, Werner A. J., 2001. "An integrated approach to process control," International Journal of Production Economics, Elsevier, vol. 69(1), pages 93-105, January.
- A.M. Lima, Marcos & Resende, Marcelo & Hasenclever, Lia, 2000. "Quality certification and performance of Brazilian firms: An empirical study," International Journal of Production Economics, Elsevier, vol. 66(2), pages 143-147, June.
- Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
- Silver, Edward A. & A. Willoughby, Keith, 1999. "Disposal of excess stock at the end of a project when facing on-going operational usage," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 189-194, March.
- Rohleder, Thomas R. & Scudder, Gary D., 1995. "Information inaccuracy: Implications for economic production scheduling," International Journal of Production Economics, Elsevier, vol. 42(1), pages 51-66, November.
- Panizzolo, Roberto, 1998. "Applying the lessons learned from 27 lean manufacturers.: The relevance of relationships management," International Journal of Production Economics, Elsevier, vol. 55(3), pages 223-240, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:52:y:1997:i:3:p:317-324. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.