Optimal flow control of flexible manufacturing systems: Setup localization by an iterative procedure
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Oded Z. Maimon & Stanley B. Gershwin, 1988. "Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines," Operations Research, INFORMS, vol. 36(2), pages 279-292, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jodlbauer, Herbert, 2006. "An approach for integrated scheduling and lot-sizing," European Journal of Operational Research, Elsevier, vol. 172(2), pages 386-400, July.
- Weidenhiller, Andreas & Jodlbauer, Herbert, 2009. "Equivalence classes of problem instances for a continuous-time lot sizing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 199(1), pages 139-149, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Haurie, A., 1995. "Time scale decomposition in production planning for unreliable flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 339-358, April.
- ChingāChin Chern & Ping Yang, 1999. "Determining a threshold control policy for an imperfect production system with rework jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(3), pages 273-301, April.
- Haurie, A. & van Delft, Ch., 1995. "Turnpikes in flow control models of unreliable manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 359-372, April.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
- Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:51:y:1997:i:1-2:p:37-46. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.