IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v46y1999i3p273-301.html
   My bibliography  Save this article

Determining a threshold control policy for an imperfect production system with rework jobs

Author

Listed:
  • Ching‐Chin Chern
  • Ping Yang

Abstract

Consider a threshold control policy for an imperfect production system with only a work center handling both regular and rework jobs. An imperfect production system studied here, generates defect jobs by factors other than machine failures. A threshold control or (ω, s) policy sets the guideline for a work center to switch between regular and rework jobs. A production cycle begins with loading and processing of several batches of regular jobs with a lot size equal to s. The outcome of each completed regular job is an independent Bernoulli trial with three possibilities: good, rework, or scrap. Once the work center accumulates more than a threshold ω of rework jobs, it finishes the last batch of regular jobs and switches to rework jobs. The objective of this research is to find a threshold ω and a lot size s that maximize the average long‐term profit. The ultimate goal is to construct a simple algorithm to search for ω and s that can be implemented directly in production management systems, as a result of this work. © 1999 John Wiley & Sons, Inc. Naval Research Logistics 46: 273–301, 1999

Suggested Citation

  • Ching‐Chin Chern & Ping Yang, 1999. "Determining a threshold control policy for an imperfect production system with rework jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(3), pages 273-301, April.
  • Handle: RePEc:wly:navres:v:46:y:1999:i:3:p:273-301
    DOI: 10.1002/(SICI)1520-6750(199904)46:33.0.CO;2-3
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/(SICI)1520-6750(199904)46:33.0.CO;2-3
    Download Restriction: no

    File URL: https://libkey.io/10.1002/(SICI)1520-6750(199904)46:33.0.CO;2-3?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Leon S. White, 1967. "Bayes Markovian Decision Models for a Multiperiod Reject Allowance Problem," Operations Research, INFORMS, vol. 15(5), pages 857-865, October.
    2. Charles H. Fine, 1986. "Quality Improvement and Learning in Productive Systems," Management Science, INFORMS, vol. 32(10), pages 1301-1315, October.
    3. Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
    4. Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
    5. Hau L. Lee & Candace Arai Yano, 1988. "Production Control in Multistage Systems with Variable Yield Losses," Operations Research, INFORMS, vol. 36(2), pages 269-278, April.
    6. Oded Z. Maimon & Stanley B. Gershwin, 1988. "Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines," Operations Research, INFORMS, vol. 36(2), pages 279-292, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
    2. Jaber, Mohamad Y. & Bonney, Maurice, 2003. "Lot sizing with learning and forgetting in set-ups and in product quality," International Journal of Production Economics, Elsevier, vol. 83(1), pages 95-111, January.
    3. Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
    4. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    5. Liao, Gwo-Liang, 2007. "Optimal production correction and maintenance policy for imperfect process," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1140-1149, November.
    6. Paulson Gjerde, Kathy A. & Slotnick, Susan A., 2004. "Quality and reputation: The effects of external and internal factors over time," International Journal of Production Economics, Elsevier, vol. 89(1), pages 1-20, May.
    7. S. Andrew Starbird, 1997. "Acceptance sampling, imperfect production, and the optimality of zero defects," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 515-530, September.
    8. Jaber, Mohamad Y. & Guiffrida, Alfred L., 2004. "Learning curves for processes generating defects requiring reworks," European Journal of Operational Research, Elsevier, vol. 159(3), pages 663-672, December.
    9. Voros, Jozsef, 2002. "Product balancing under conditions of quality inflation, cost pressures and growth strategies," European Journal of Operational Research, Elsevier, vol. 141(1), pages 153-166, August.
    10. Vörös, József, 2003. "A minőség figyelembevételének szükségessége az egyensúlyi állapot meghatározásában [The need to consider quality when determining a state of equilibrium]," Közgazdasági Szemle (Economic Review - monthly of the Hungarian Academy of Sciences), Közgazdasági Szemle Alapítvány (Economic Review Foundation), vol. 0(1), pages 6-21.
    11. Yimin Wang & Wendell Gilland & Brian Tomlin, 2010. "Mitigating Supply Risk: Dual Sourcing or Process Improvement?," Manufacturing & Service Operations Management, INFORMS, vol. 12(3), pages 489-510, September.
    12. Jaber, Mohamad Y. & Guiffrida, Alfred L., 2008. "Learning curves for imperfect production processes with reworks and process restoration interruptions," European Journal of Operational Research, Elsevier, vol. 189(1), pages 93-104, August.
    13. R. Udayakumar & S. Priyan & Mandeep Mittal & Anuwat Jirawattanapanit & Grienggrai Rajchakit & Pramet Kaewmesri, 2022. "A Sustainable Production Scheduling with Backorders under Different Forms of Rework Process and Green Investment," Sustainability, MDPI, vol. 14(24), pages 1-38, December.
    14. George Li & S. Rajagopalan, 1998. "Process Improvement, Quality, and Learning Effects," Management Science, INFORMS, vol. 44(11-Part-1), pages 1517-1532, November.
    15. Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
    16. Ying-Ju Chen & Brian Tomlin & Yimin Wang, 2013. "Coproduct Technologies: Product Line Design and Process Innovation," Management Science, INFORMS, vol. 59(12), pages 2772-2789, December.
    17. Lonnie Turpin & Barron Brown, 2021. "On Reworks in a Serial Process with Flexible Windows of Time," SN Operations Research Forum, Springer, vol. 2(2), pages 1-13, June.
    18. T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.
    19. Linguo Gong & James Pruett & Kwei Tang, 1997. "A Markovian model for process setup and improvement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(4), pages 383-400, June.
    20. Juhwen Hwang & Medini R. Singh, 1998. "Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities," Management Science, INFORMS, vol. 44(9), pages 1279-1294, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:46:y:1999:i:3:p:273-301. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.