IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v82y1995i2p339-358.html
   My bibliography  Save this article

Time scale decomposition in production planning for unreliable flexible manufacturing systems

Author

Listed:
  • Haurie, A.

Abstract

No abstract is available for this item.

Suggested Citation

  • Haurie, A., 1995. "Time scale decomposition in production planning for unreliable flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 339-358, April.
  • Handle: RePEc:eee:ejores:v:82:y:1995:i:2:p:339-358
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(94)00268-H
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Haurie, A. & van Delft, Ch., 1995. "Turnpikes in flow control models of unreliable manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 359-372, April.
    2. Haurie, A. & Leizarowitz, A. & van Delft, Ch., 1994. "Boundedly optimal control of piecewise deterministic systems," European Journal of Operational Research, Elsevier, vol. 73(2), pages 237-251, March.
    3. A. Haurie & Christian van Delft, 1991. "Turnpike properties for a class of piecewise deterministic systems arising in manufacturing flow control," Post-Print hal-00482416, HAL.
    4. T. Bielecki & P. R. Kumar, 1988. "Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems," Operations Research, INFORMS, vol. 36(4), pages 532-541, August.
    5. Christian van Delft & A. Haurie, 1995. "Turnpikes in flow control models of unreliable manufacturing systems," Post-Print hal-00471375, HAL.
    6. Tyrrell Rockafellar, R., 1976. "Saddle points of Hamiltonian systems in convex Lagrange problems having a nonzero discount rate," Journal of Economic Theory, Elsevier, vol. 12(1), pages 71-113, February.
    7. J. L. Goffin & A. Haurie & J. P. Vial, 1992. "Decomposition and Nondifferentiable Optimization with the Projective Algorithm," Management Science, INFORMS, vol. 38(2), pages 284-302, February.
    8. Christian van Delft & A. Haurie & Pierre L'Ecuyer, 1994. "Convergence of stochastic approximation coupled with perturbation analysis in a class of manufacturing flow control models," Post-Print hal-00471357, HAL.
    9. Pierre L'Ecuyer, 1990. "A Unified View of the IPA, SF, and LR Gradient Estimation Techniques," Management Science, INFORMS, vol. 36(11), pages 1364-1383, November.
    10. Van der Duyn Schouten, F. A. & Vanneste, S. G., 1995. "Maintenance optimization of a production system with buffer capacity," European Journal of Operational Research, Elsevier, vol. 82(2), pages 323-338, April.
    11. Oded Z. Maimon & Stanley B. Gershwin, 1988. "Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines," Operations Research, INFORMS, vol. 36(2), pages 279-292, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. van Dijkhuizen, Gerhard C. & van Harten, Aart, 1998. "Two-stage generalized age maintenance of a queue-like production system," European Journal of Operational Research, Elsevier, vol. 108(2), pages 363-378, July.
    2. Guo R. & Ascher H. & Love E., 2001. "Towards Practical and Synthetical Modelling of Repairable Systems," Stochastics and Quality Control, De Gruyter, vol. 16(1), pages 147-182, January.
    3. Haurie, A. & van Delft, Ch., 1995. "Turnpikes in flow control models of unreliable manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 359-372, April.
    4. Kogan, Konstantin & Chernonog, Tatyana, 2019. "Competition under industry-stock-driven prevailing market price: Environmental consequences and the effect of uncertainty," European Journal of Operational Research, Elsevier, vol. 276(3), pages 929-946.
    5. Avi Herbon & Konstantin Kogan, 2014. "Time-dependent and independent control rules for coordinated production and pricing under demand uncertainty and finite planning horizons," Annals of Operations Research, Springer, vol. 223(1), pages 195-216, December.
    6. Kogan, Konstantin, 2012. "Ship-to-order supplies: Contract breachability and the impact of a manufacturer-owned direct channel," European Journal of Operational Research, Elsevier, vol. 218(1), pages 113-123.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
    2. Haurie, A. & van Delft, Ch., 1995. "Turnpikes in flow control models of unreliable manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 359-372, April.
    3. Mourani, Iyad & Hennequin, Sophie & Xie, Xiaolan, 2008. "Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay," International Journal of Production Economics, Elsevier, vol. 112(1), pages 26-36, March.
    4. Gürkan, G., 1997. "Simulation Optimization of Buffer Allocations in Production Lines with Unreliable Machines," Other publications TiSEM 015cb8ee-38d7-41b1-b9fc-7, Tilburg University, School of Economics and Management.
    5. Pierre Bernhard & Marc Deschamps, 2017. "On Dynamic Games with Randomly Arriving Players," Dynamic Games and Applications, Springer, vol. 7(3), pages 360-385, September.
    6. Xiang Li, 2017. "Optimal procurement strategies from suppliers with random yield and all-or-nothing risks," Annals of Operations Research, Springer, vol. 257(1), pages 167-181, October.
    7. Guo R. & Ascher H. & Love E., 2001. "Towards Practical and Synthetical Modelling of Repairable Systems," Stochastics and Quality Control, De Gruyter, vol. 16(1), pages 147-182, January.
    8. B. Khoury, 2009. "A discrete approach to designing optimal hedging-point control policies for production-inventory systems with general stochastic behavior," Computational Management Science, Springer, vol. 6(4), pages 399-409, October.
    9. Souheil Ayed & Zied Hajej & Sadok Turki & Nidhal Rezg, 2017. "FPA method for optimal production planning under availability/degradation machine and subcontracting constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2135-2148, April.
    10. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    11. Jingfu Huang & Gaoke Wu & Yiju Wang, 2021. "Retailer’s Emergency Ordering Policy When Facing an Impending Supply Disruption," Sustainability, MDPI, vol. 13(13), pages 1-21, June.
    12. Dimitrakos, T.D. & Kyriakidis, E.G., 2008. "A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 752-762, February.
    13. S. P. Sethi & W. Suo & M. I. Taksar & Q. Zhang, 1997. "Optimal Production Planning in a Stochastic Manufacturing System with Long-Run Average Cost," Journal of Optimization Theory and Applications, Springer, vol. 92(1), pages 161-188, January.
    14. Gharbi, A. & Pellerin, R. & Sadr, J., 2008. "Production rate control for stochastic remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 112(1), pages 37-47, March.
    15. Engelbert Dockner & Gustav Feichtinger, 1991. "On the optimality of limit cycles in dynamic economic systems," Journal of Economics, Springer, vol. 53(1), pages 31-50, February.
    16. Klose, Andreas & Gortz, Simon, 2007. "A branch-and-price algorithm for the capacitated facility location problem," European Journal of Operational Research, Elsevier, vol. 179(3), pages 1109-1125, June.
    17. Samir Elhedhli & Jean-Louis Goffin, 2005. "Efficient Production-Distribution System Design," Management Science, INFORMS, vol. 51(7), pages 1151-1164, July.
    18. Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
    19. Dawid, Herbert & Keoula, Michel Y. & Kopel, Michael & Kort, Peter M., 2015. "Product innovation incentives by an incumbent firm: A dynamic analysis," Journal of Economic Behavior & Organization, Elsevier, vol. 117(C), pages 411-438.
    20. Ribeiro, M.A. & Silveira, J.L. & Qassim, R.Y., 2007. "Joint optimisation of maintenance and buffer size in a manufacturing system," European Journal of Operational Research, Elsevier, vol. 176(1), pages 405-413, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:82:y:1995:i:2:p:339-358. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.