Time scale decomposition in production planning for unreliable flexible manufacturing systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Haurie, A. & van Delft, Ch., 1995. "Turnpikes in flow control models of unreliable manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 359-372, April.
- Haurie, A. & Leizarowitz, A. & van Delft, Ch., 1994. "Boundedly optimal control of piecewise deterministic systems," European Journal of Operational Research, Elsevier, vol. 73(2), pages 237-251, March.
- A. Haurie & Christian van Delft, 1991. "Turnpike properties for a class of piecewise deterministic systems arising in manufacturing flow control," Post-Print hal-00482416, HAL.
- T. Bielecki & P. R. Kumar, 1988. "Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems," Operations Research, INFORMS, vol. 36(4), pages 532-541, August.
- Christian van Delft & A. Haurie, 1995. "Turnpikes in flow control models of unreliable manufacturing systems," Post-Print hal-00471375, HAL.
- Tyrrell Rockafellar, R., 1976. "Saddle points of Hamiltonian systems in convex Lagrange problems having a nonzero discount rate," Journal of Economic Theory, Elsevier, vol. 12(1), pages 71-113, February.
- J. L. Goffin & A. Haurie & J. P. Vial, 1992. "Decomposition and Nondifferentiable Optimization with the Projective Algorithm," Management Science, INFORMS, vol. 38(2), pages 284-302, February.
- Christian van Delft & A. Haurie & Pierre L'Ecuyer, 1994. "Convergence of stochastic approximation coupled with perturbation analysis in a class of manufacturing flow control models," Post-Print hal-00471357, HAL.
- Pierre L'Ecuyer, 1990. "A Unified View of the IPA, SF, and LR Gradient Estimation Techniques," Management Science, INFORMS, vol. 36(11), pages 1364-1383, November.
- Van der Duyn Schouten, F. A. & Vanneste, S. G., 1995. "Maintenance optimization of a production system with buffer capacity," European Journal of Operational Research, Elsevier, vol. 82(2), pages 323-338, April.
- Oded Z. Maimon & Stanley B. Gershwin, 1988. "Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines," Operations Research, INFORMS, vol. 36(2), pages 279-292, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- van Dijkhuizen, Gerhard C. & van Harten, Aart, 1998. "Two-stage generalized age maintenance of a queue-like production system," European Journal of Operational Research, Elsevier, vol. 108(2), pages 363-378, July.
- Guo R. & Ascher H. & Love E., 2001. "Towards Practical and Synthetical Modelling of Repairable Systems," Stochastics and Quality Control, De Gruyter, vol. 16(1), pages 147-182, January.
- Haurie, A. & van Delft, Ch., 1995. "Turnpikes in flow control models of unreliable manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 359-372, April.
- Kogan, Konstantin & Chernonog, Tatyana, 2019. "Competition under industry-stock-driven prevailing market price: Environmental consequences and the effect of uncertainty," European Journal of Operational Research, Elsevier, vol. 276(3), pages 929-946.
- Avi Herbon & Konstantin Kogan, 2014. "Time-dependent and independent control rules for coordinated production and pricing under demand uncertainty and finite planning horizons," Annals of Operations Research, Springer, vol. 223(1), pages 195-216, December.
- Kogan, Konstantin, 2012. "Ship-to-order supplies: Contract breachability and the impact of a manufacturer-owned direct channel," European Journal of Operational Research, Elsevier, vol. 218(1), pages 113-123.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Haurie, A. & van Delft, Ch., 1995. "Turnpikes in flow control models of unreliable manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 359-372, April.
- Mourani, Iyad & Hennequin, Sophie & Xie, Xiaolan, 2008. "Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay," International Journal of Production Economics, Elsevier, vol. 112(1), pages 26-36, March.
- Gürkan, G., 1997. "Simulation Optimization of Buffer Allocations in Production Lines with Unreliable Machines," Other publications TiSEM 015cb8ee-38d7-41b1-b9fc-7, Tilburg University, School of Economics and Management.
- Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
- Pierre Bernhard & Marc Deschamps, 2017.
"On Dynamic Games with Randomly Arriving Players,"
Dynamic Games and Applications, Springer, vol. 7(3), pages 360-385, September.
- Pierre Bernhard & Marc Deschamps, 2015. "On dynamic games with randomly arriving players," Working Papers 2015-13, CRESE.
- Xiang Li, 2017. "Optimal procurement strategies from suppliers with random yield and all-or-nothing risks," Annals of Operations Research, Springer, vol. 257(1), pages 167-181, October.
- Júlíus Atlason & Marina A. Epelman & Shane G. Henderson, 2008. "Optimizing Call Center Staffing Using Simulation and Analytic Center Cutting-Plane Methods," Management Science, INFORMS, vol. 54(2), pages 295-309, February.
- Guo R. & Ascher H. & Love E., 2001. "Towards Practical and Synthetical Modelling of Repairable Systems," Stochastics and Quality Control, De Gruyter, vol. 16(1), pages 147-182, January.
- B. Khoury, 2009. "A discrete approach to designing optimal hedging-point control policies for production-inventory systems with general stochastic behavior," Computational Management Science, Springer, vol. 6(4), pages 399-409, October.
- Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
- Bisin, Alberto & Horst, Ulrich & Ozgur, Onur, 2006. "Rational expectations equilibria of economies with local interactions," Journal of Economic Theory, Elsevier, vol. 127(1), pages 74-116, March.
- Salari, Nooshin & Makis, Viliam, 2017. "Comparison of two maintenance policies for a multi-unit system considering production and demand rates," International Journal of Production Economics, Elsevier, vol. 193(C), pages 381-391.
- Souheil Ayed & Zied Hajej & Sadok Turki & Nidhal Rezg, 2017. "FPA method for optimal production planning under availability/degradation machine and subcontracting constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2135-2148, April.
- G. Y. Zhao, 1999. "Interior-Point Methods with Decomposition for Solving Large-Scale Linear Programs," Journal of Optimization Theory and Applications, Springer, vol. 102(1), pages 169-192, July.
- B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
- Venditti Alain, 2019.
"Competitive equilibrium cycles for small discounting in discrete-time two-sector optimal growth models,"
Studies in Nonlinear Dynamics & Econometrics, De Gruyter, vol. 23(4), pages 1-14, September.
- Alain Venditti, 2018. "Competitive Equilibrium Cycles for Small Discounting in Discrete-Time Two-Sector Optimal Growth Models," AMSE Working Papers 1830, Aix-Marseille School of Economics, France.
- Alain Venditti, 2019. "Competitive equilibrium cycles for small discounting in discrete-time two-sector optimal growth models," Post-Print hal-02352979, HAL.
- Alain Venditti, 2018. "Competitive Equilibrium Cycles for Small Discounting in Discrete-Time Two-Sector Optimal Growth Models," Working Papers halshs-01934842, HAL.
- Jingfu Huang & Gaoke Wu & Yiju Wang, 2021. "Retailer’s Emergency Ordering Policy When Facing an Impending Supply Disruption," Sustainability, MDPI, vol. 13(13), pages 1-21, June.
- Dimitrakos, T.D. & Kyriakidis, E.G., 2008. "A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 752-762, February.
- S. P. Sethi & W. Suo & M. I. Taksar & Q. Zhang, 1997. "Optimal Production Planning in a Stochastic Manufacturing System with Long-Run Average Cost," Journal of Optimization Theory and Applications, Springer, vol. 92(1), pages 161-188, January.
- Gharbi, A. & Pellerin, R. & Sadr, J., 2008. "Production rate control for stochastic remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 112(1), pages 37-47, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:82:y:1995:i:2:p:339-358. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.