IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v82y1995i2p359-372.html
   My bibliography  Save this article

Turnpikes in flow control models of unreliable manufacturing systems

Author

Listed:
  • Haurie, A.
  • van Delft, Ch.

Abstract

No abstract is available for this item.

Suggested Citation

  • Haurie, A. & van Delft, Ch., 1995. "Turnpikes in flow control models of unreliable manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 359-372, April.
  • Handle: RePEc:eee:ejores:v:82:y:1995:i:2:p:359-372
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(94)00269-I
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Haurie, A., 1995. "Time scale decomposition in production planning for unreliable flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 339-358, April.
    2. A. Haurie & Christian van Delft, 1991. "Turnpike properties for a class of piecewise deterministic systems arising in manufacturing flow control," Post-Print hal-00482416, HAL.
    3. Oded Z. Maimon & Stanley B. Gershwin, 1988. "Dynamic Scheduling and Routing for Flexible Manufacturing Systems that Have Unreliable Machines," Operations Research, INFORMS, vol. 36(2), pages 279-292, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Haurie, A., 1995. "Time scale decomposition in production planning for unreliable flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 339-358, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Haurie, A., 1995. "Time scale decomposition in production planning for unreliable flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 82(2), pages 339-358, April.
    2. Guo R. & Ascher H. & Love E., 2001. "Towards Practical and Synthetical Modelling of Repairable Systems," Stochastics and Quality Control, De Gruyter, vol. 16(1), pages 147-182, January.
    3. Dawid, Herbert & Keoula, Michel Y. & Kopel, Michael & Kort, Peter M., 2015. "Product innovation incentives by an incumbent firm: A dynamic analysis," Journal of Economic Behavior & Organization, Elsevier, vol. 117(C), pages 411-438.
    4. Kogan, Konstantin & Khmelnitsky, Eugene & Shtub, Avraham & Maimon, Oded, 1997. "Optimal flow control of flexible manufacturing systems: Setup localization by an iterative procedure," International Journal of Production Economics, Elsevier, vol. 51(1-2), pages 37-46, August.
    5. Kogan, Konstantin & Chernonog, Tatyana, 2019. "Competition under industry-stock-driven prevailing market price: Environmental consequences and the effect of uncertainty," European Journal of Operational Research, Elsevier, vol. 276(3), pages 929-946.
    6. van Dijkhuizen, Gerhard C. & van Harten, Aart, 1998. "Two-stage generalized age maintenance of a queue-like production system," European Journal of Operational Research, Elsevier, vol. 108(2), pages 363-378, July.
    7. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    8. Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
    9. Kogan, Konstantin, 2012. "Ship-to-order supplies: Contract breachability and the impact of a manufacturer-owned direct channel," European Journal of Operational Research, Elsevier, vol. 218(1), pages 113-123.
    10. Avi Herbon & Konstantin Kogan, 2014. "Time-dependent and independent control rules for coordinated production and pricing under demand uncertainty and finite planning horizons," Annals of Operations Research, Springer, vol. 223(1), pages 195-216, December.
    11. Chingā€Chin Chern & Ping Yang, 1999. "Determining a threshold control policy for an imperfect production system with rework jobs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(3), pages 273-301, April.
    12. Vassili Kolokoltsov & Wei Yang, 2012. "Turnpike Theorems for Markov Games," Dynamic Games and Applications, Springer, vol. 2(3), pages 294-312, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:82:y:1995:i:2:p:359-372. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.