IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v263y2023ics092552732300155x.html
   My bibliography  Save this article

Modeling repair demand in existence of a nonstationary installed base

Author

Listed:
  • Hekimoğlu, Mustafa
  • Karlı, Deniz

Abstract

Life cycles of products consist of 3 phases, namely growth, maturity, and decline phases. Modeling repair demand is particularly difficult in the growth and decline stages due to nonstationarity. In this study, we suggest respective stochastic models that capture the dynamics of repair demand in these two phases. We apply our theory to two different operations management problems. First, using the moments of spare parts demand, we suggest an algorithm that selects a parametric distribution from the hypergeometric family (Ord, 1967) for each period in time. We utilize the algorithm in a single echelon inventory control problem. Second, we focus on investment decisions of Original Equipment Manufacturers (OEMs) to extend economic lifetimes of products with technology upgrades. Our results indicate that the second moment is sufficient for growing customer bases, whereas using the third moment doubles the approximation quality of theoretical distributions for a declining customer base. From a cost minimization perspective, using higher moments of demand leads to savings up to 13.6% compared to the single-moment approach. Also, we characterize the optimal investment policy for lifetime extension decisions from risk-neutral and risk-averse perspectives. We find that there exists a critical level of investment cost and installed base size for profitability of lifetime extension for OEMs. From a managerial point of view, we find that a risk-neutral decision maker finds the lifetime extension problem profitable. In contrast, even a slight risk aversion can make the lifetime extension decision economically undesirable.

Suggested Citation

  • Hekimoğlu, Mustafa & Karlı, Deniz, 2023. "Modeling repair demand in existence of a nonstationary installed base," International Journal of Production Economics, Elsevier, vol. 263(C).
  • Handle: RePEc:eee:proeco:v:263:y:2023:i:c:s092552732300155x
    DOI: 10.1016/j.ijpe.2023.108923
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552732300155X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2023.108923?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Vishal V. Agrawal & Mark Ferguson & L. Beril Toktay & Valerie M. Thomas, 2012. "Is Leasing Greener Than Selling?," Management Science, INFORMS, vol. 58(3), pages 523-533, March.
    2. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Estimating obsolescence risk from demand data to enhance inventory control--A case study," International Journal of Production Economics, Elsevier, vol. 133(1), pages 423-431, September.
    3. Dekker, Rommert & Pinçe, Çerağ & Zuidwijk, Rob & Jalil, Muhammad Naiman, 2013. "On the use of installed base information for spare parts logistics: A review of ideas and industry practice," International Journal of Production Economics, Elsevier, vol. 143(2), pages 536-545.
    4. Brian Tomlin, 2006. "On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks," Management Science, INFORMS, vol. 52(5), pages 639-657, May.
    5. Syntetos, Aris A. & Boylan, John E., 2005. "The accuracy of intermittent demand estimates," International Journal of Forecasting, Elsevier, vol. 21(2), pages 303-314.
    6. Ray, Pritee & Jenamani, Mamata, 2016. "Mean-variance analysis of sourcing decision under disruption risk," European Journal of Operational Research, Elsevier, vol. 250(2), pages 679-689.
    7. Vishal V. Agrawal & Sezer Ülkü, 2013. "The Role of Modular Upgradability as a Green Design Strategy," Manufacturing & Service Operations Management, INFORMS, vol. 15(4), pages 640-648, October.
    8. John E. Boylan & Aris A. Syntetos, 2008. "Forecasting for Inventory Management of Service Parts," Springer Series in Reliability Engineering, in: Complex System Maintenance Handbook, chapter 20, pages 479-506, Springer.
    9. Ximin (Natalie) Huang & Atalay Atasu & L. Beril Toktay, 2019. "Design Implications of Extended Producer Responsibility for Durable Products," Management Science, INFORMS, vol. 67(6), pages 2573-2590, June.
    10. M N Jalil & R A Zuidwijk & M Fleischmann & Jo A E E van Nunen, 2011. "Spare parts logistics and installed base information," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 442-457, March.
    11. Dolgui, Alexandre & Pashkevich, Maksim, 2008. "Demand forecasting for multiple slow-moving items with short requests history and unequal demand variance," International Journal of Production Economics, Elsevier, vol. 112(2), pages 885-894, April.
    12. Ram Tripathi & Ramesh Gupta & John Gurland, 1994. "Estimation of parameters in the beta binomial model," Annals of the Institute of Statistical Mathematics, Springer;The Institute of Statistical Mathematics, vol. 46(2), pages 317-331, June.
    13. J E Boylan & A A Syntetos & G C Karakostas, 2008. "Classification for forecasting and stock control: a case study," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(4), pages 473-481, April.
    14. Christopher M. Durugbo, 2020. "After-sales services and aftermarket support: a systematic review, theory and future research directions," International Journal of Production Research, Taylor & Francis Journals, vol. 58(6), pages 1857-1892, March.
    15. Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
    16. Adem Örsdemir & Vinayak Deshpande & Ali K. Parlaktürk, 2019. "Is Servicization a Win-Win Strategy? Profitability and Environmental Implications of Servicization," Manufacturing & Service Operations Management, INFORMS, vol. 21(3), pages 674-691, July.
    17. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    18. Zhu, Sha & Dekker, Rommert & van Jaarsveld, Willem & Renjie, Rex Wang & Koning, Alex J., 2017. "An improved method for forecasting spare parts demand using extreme value theory," European Journal of Operational Research, Elsevier, vol. 261(1), pages 169-181.
    19. Gökçe Esenduran & Atalay Atasu & Luk N. Van Wassenhove, 2019. "Valuable e-waste: Implications for extended producer responsibility," IISE Transactions, Taylor & Francis Journals, vol. 51(4), pages 382-396, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Van der Auweraer, Sarah & Boute, Robert N. & Syntetos, Aris A., 2019. "Forecasting spare part demand with installed base information: A review," International Journal of Forecasting, Elsevier, vol. 35(1), pages 181-196.
    2. Pinçe, Çerağ & Turrini, Laura & Meissner, Joern, 2021. "Intermittent demand forecasting for spare parts: A Critical review," Omega, Elsevier, vol. 105(C).
    3. Van der Auweraer, Sarah & Zhu, Sha & Boute, Robert N., 2021. "The value of installed base information for spare part inventory control," International Journal of Production Economics, Elsevier, vol. 239(C).
    4. Van der Auweraer, Sarah & Boute, Robert, 2019. "Forecasting spare part demand using service maintenance information," International Journal of Production Economics, Elsevier, vol. 213(C), pages 138-149.
    5. Dombi, József & Jónás, Tamás & Tóth, Zsuzsanna Eszter, 2018. "Modeling and long-term forecasting demand in spare parts logistics businesses," International Journal of Production Economics, Elsevier, vol. 201(C), pages 1-17.
    6. Yen-Ting Lin & Haoying Sun & Shouqiang Wang, 2020. "Designing Sustainable Products Under Coproduction Technology," Manufacturing & Service Operations Management, INFORMS, vol. 22(6), pages 1181-1198, November.
    7. Moon, Seongmin & Hicks, Christian & Simpson, Andrew, 2012. "The development of a hierarchical forecasting method for predicting spare parts demand in the South Korean Navy—A case study," International Journal of Production Economics, Elsevier, vol. 140(2), pages 794-802.
    8. Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020. "Spare parts inventory control based on maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    9. Zhu, Sha & Dekker, Rommert & van Jaarsveld, Willem & Renjie, Rex Wang & Koning, Alex J., 2017. "An improved method for forecasting spare parts demand using extreme value theory," European Journal of Operational Research, Elsevier, vol. 261(1), pages 169-181.
    10. Chowdhury, Sayan & Verma, Nishant K., 2024. "Walking a tightrope: Impact of adopting voluntary right-to-repair policy on firm profit and consumer welfare," International Journal of Production Economics, Elsevier, vol. 272(C).
    11. Emine Sarigöllü & Chenxuan Hou & Myriam Ertz, 2021. "Sustainable product disposal: Consumer redistributing behaviors versus hoarding and throwing away," Business Strategy and the Environment, Wiley Blackwell, vol. 30(1), pages 340-356, January.
    12. Kanatlı, Mehmet Ali & Karaer, Özgen, 2022. "Servitization as an alternative business model and its implications on product durability, profitability & environmental impact," European Journal of Operational Research, Elsevier, vol. 301(2), pages 546-560.
    13. Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
    14. Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022. "Forecasting: theory and practice," International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
      • Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
    15. Stip, J. & Van Houtum, G.J., 2020. "On a method to improve your service BOMs within spare parts management," International Journal of Production Economics, Elsevier, vol. 221(C).
    16. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    17. Amniattalab, Ayda & Frenk, J.B.G. & Hekimoğlu, Mustafa, 2023. "On spare parts demand and the installed base concept: A theoretical approach," International Journal of Production Economics, Elsevier, vol. 266(C).
    18. Spiliotis, Evangelos & Makridakis, Spyros & Kaltsounis, Anastasios & Assimakopoulos, Vassilios, 2021. "Product sales probabilistic forecasting: An empirical evaluation using the M5 competition data," International Journal of Production Economics, Elsevier, vol. 240(C).
    19. Ye, Yuan & Lu, Yonggang & Robinson, Powell & Narayanan, Arunachalam, 2022. "An empirical Bayes approach to incorporating demand intermittency and irregularity into inventory control," European Journal of Operational Research, Elsevier, vol. 303(1), pages 255-272.
    20. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:263:y:2023:i:c:s092552732300155x. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.