Production and Subcontracting Strategies for Manufacturers with Limited Capacity and Volatile Demand
Author
Abstract
Suggested Citation
DOI: 10.1023/B:ANOR.0000011192.23903.7f
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Nasuh Buyukkaramikli & Henny Ooijen & J. Bertrand, 2015. "Integrating inventory control and capacity management at a maintenance service provider," Annals of Operations Research, Springer, vol. 231(1), pages 185-206, August.
- Eugene Khmelnitsky & Gonen Singer, 2015. "An optimal inventory management problem with reputation-dependent demand," Annals of Operations Research, Springer, vol. 231(1), pages 305-316, August.
- Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
- Mayorga, Maria E. & Ahn, Hyun-Soo, 2011. "Joint management of capacity and inventory in make-to-stock production systems with multi-class demand," European Journal of Operational Research, Elsevier, vol. 212(2), pages 312-324, July.
- Nasuh Buyukkaramikli & J. Bertrand & Henny Ooijen, 2013. "Flexible hiring in a make to order system with parallel processing units," Annals of Operations Research, Springer, vol. 209(1), pages 159-178, October.
- Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean-Pierre & Montaño-Arango, Oscar & Hernandez-Gress, Eva Selene, 2016. "Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 134-150.
- Reimann, Marc, 2011. "Speculative production and anticipative reservation of reactive capacity by a multi-product newsvendor," European Journal of Operational Research, Elsevier, vol. 211(1), pages 35-46, May.
- Annie Francie, Kouedeu & Jean-Pierre, Kenne & Pierre, Dejax & Victor, Songmene & Vladimir, Polotski, 2014. "Stochastic optimal control of manufacturing systems under production-dependent failure rates," International Journal of Production Economics, Elsevier, vol. 150(C), pages 174-187.
- Frederick H Abernathy & Anthony Volpe & David Weil, 2006. "The Future of the Apparel and Textile Industries: Prospects and Choices for Public and Private Actors," Environment and Planning A, , vol. 38(12), pages 2207-2232, December.
More about this item
Keywords
subcontracting; optimal flow control; hedging policy; production systems;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:125:y:2004:i:1:p:205-232:10.1023/b:anor.0000011192.23903.7f. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.