IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v144y2013i1p200-208.html
   My bibliography  Save this article

Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy

Author

Listed:
  • Almehdawe, Eman
  • Jewkes, Elizabeth

Abstract

We consider a stochastic two-stage hybrid manufacturing system for a single product where semi-finished goods are Made-To-Stock (MTS) and then differentiated when demand is realized through a Make-To-Order (MTO) stage. Inventory for semi-finished goods is held between the two stages. We introduce a batch ordering policy to permit economies of scale in ordering due to a cost associated with each order placed. We use the Matrix-analytic method to evaluate system performance under this ordering policy. Afterwards, we develop an optimization model to find the optimal intermediate buffer size and the optimal replenishment order quantity for the system. We show that a base stock policy is sub-optimal in the presence of a replenishment cost for semi-finished goods. The savings from adopting the batch ordering policy can be high while the response time for most customer orders is not affected.

Suggested Citation

  • Almehdawe, Eman & Jewkes, Elizabeth, 2013. "Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy," International Journal of Production Economics, Elsevier, vol. 144(1), pages 200-208.
  • Handle: RePEc:eee:proeco:v:144:y:2013:i:1:p:200-208
    DOI: 10.1016/j.ijpe.2013.02.005
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527313000728
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2013.02.005?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Diwakar Gupta & N. Selvaraju, 2006. "Performance Evaluation and Stock Allocation in Capacitated Serial Supply Systems," Manufacturing & Service Operations Management, INFORMS, vol. 8(2), pages 169-191, July.
    2. Khaled Hadj Youssef & Christian Van Delft & Yves Dallery, 2004. "Efficient Scheduling Rules in a Combined Make-to-Stock and Make-to-Order Manufacturing System," Annals of Operations Research, Springer, vol. 126(1), pages 103-134, February.
    3. Liming Liu & Xiaoming Liu & David D. Yao, 2004. "Analysis and Optimization of a Multistage Inventory-Queue System," Management Science, INFORMS, vol. 50(3), pages 365-380, March.
    4. Li, Hui & Liu, Liming, 2006. "Production control in a two-stage system," European Journal of Operational Research, Elsevier, vol. 174(2), pages 887-904, October.
    5. Christian van Delft & K. Hadj Youssef, 2004. "Efficient Scheduling Rules in a Combined Make-to-Stock and Make-to-Order Manufacturing System," Post-Print hal-00471415, HAL.
    6. Song, Zhe & Kusiak, Andrew, 2010. "Mining Pareto-optimal modules for delayed product differentiation," European Journal of Operational Research, Elsevier, vol. 201(1), pages 123-128, February.
    7. Gupta, Diwakar & Weerawat, Waressara, 2006. "Supplier-manufacturer coordination in capacitated two-stage supply chains," European Journal of Operational Research, Elsevier, vol. 175(1), pages 67-89, November.
    8. Arthur F. Veinott, 1965. "The Optimal Inventory Policy for Batch Ordering," Operations Research, INFORMS, vol. 13(3), pages 424-432, June.
    9. Yong-Joo Lee & Paul Zipkin, 1992. "Tandem Queues with Planned Inventories," Operations Research, INFORMS, vol. 40(5), pages 936-947, October.
    10. Jewkes, Elizabeth M. & Alfa, Attahiru S., 2009. "A queueing model of delayed product differentiation," European Journal of Operational Research, Elsevier, vol. 199(3), pages 734-743, December.
    11. Jayashankar M. Swaminathan & Sridhar R. Tayur, 1998. "Managing Broader Product Lines through Delayed Differentiation Using Vanilla Boxes," Management Science, INFORMS, vol. 44(12-Part-2), pages 161-172, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liu, Weihua & Liu, Xiaoyan & Li, Xiang, 2015. "The two-stage batch ordering strategy of logistics service capacity with demand update," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 83(C), pages 65-89.
    2. Kim, Hyunjung & Kim, Eungab, 2022. "A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1244-1257.
    3. Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Toktas-Palut, Peral & Ülengin, Füsun, 2011. "Coordination in a two-stage capacitated supply chain with multiple suppliers," European Journal of Operational Research, Elsevier, vol. 212(1), pages 43-53, July.
    2. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
    3. Jing-Sheng Song & Yue Zhang, 2020. "Stock or Print? Impact of 3-D Printing on Spare Parts Logistics," Management Science, INFORMS, vol. 66(9), pages 3860-3878, September.
    4. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
    5. Bo Li & Antonio Arreola‐Risa, 2022. "Minimizing conditional value‐at‐risk under a modified basestock policy," Production and Operations Management, Production and Operations Management Society, vol. 31(4), pages 1822-1838, April.
    6. Pereira, Daniel Filipe & Oliveira, José Fernando & Carravilla, Maria Antónia, 2022. "Merging make-to-stock/make-to-order decisions into sales and operations planning: A multi-objective approach," Omega, Elsevier, vol. 107(C).
    7. Liu, Xiaoming & Lian, Zhaotong, 2009. "Cost-effective inventory control in a value-added manufacturing system," European Journal of Operational Research, Elsevier, vol. 196(2), pages 534-543, July.
    8. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
    9. Sanajian, Nima & BalcIog[small tilde]lu, BarIs, 2009. "The impact of production time variability on make-to-stock queue performance," European Journal of Operational Research, Elsevier, vol. 194(3), pages 847-855, May.
    10. Sun, X.Y. & Ji, P. & Sun, L.Y. & Wang, Y.L., 2008. "Positioning multiple decoupling points in a supply network," International Journal of Production Economics, Elsevier, vol. 113(2), pages 943-956, June.
    11. Avṣar, Zeynep Müge & Henk Zijm, W., 2014. "Approximate queueing models for capacitated multi-stage inventory systems under base-stock control," European Journal of Operational Research, Elsevier, vol. 236(1), pages 135-146.
    12. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Reprint of “Integrating make-to-order and make-to-stock in job shop control”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 3-12.
    13. Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
    14. Akkerman, Renzo & van Donk, Dirk Pieter, 2007. "Product prioritization in a two-stage food production system with intermediate storage," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 43-53, July.
    15. N Sanajian & H Abouee-Mehrizi & B Balcıog̃lu, 2010. "Scheduling policies in the M/G/1 make-to-stock queue," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(1), pages 115-123, January.
    16. Işık Biçer & Florian Lücker & Tamer Boyacı, 2022. "Beyond Retail Stores: Managing Product Proliferation along the Supply Chain," Production and Operations Management, Production and Operations Management Society, vol. 31(3), pages 1135-1156, March.
    17. Fay, Scott & Mitra, Deb & Wang, Qiong, 2009. "Ask or infer? Strategic implications of alternative learning approaches in customization," International Journal of Research in Marketing, Elsevier, vol. 26(2), pages 136-152.
    18. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    19. Kai-Lung Hui, 2004. "Product Variety Under Brand Influence: An Empirical Investigation of Personal Computer Demand," Management Science, INFORMS, vol. 50(5), pages 686-700, May.
    20. Wei, Liqun & Zhang, Jianxiong, 2021. "Strategic substitutes or complements? The relationship between capacity sharing and postponement flexibility," European Journal of Operational Research, Elsevier, vol. 294(1), pages 138-148.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:144:y:2013:i:1:p:200-208. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.