IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v126y2004i1p103-13410.1023-banor.0000012277.97069.a6.html
   My bibliography  Save this article

Efficient Scheduling Rules in a Combined Make-to-Stock and Make-to-Order Manufacturing System

Author

Listed:
  • Khaled Hadj Youssef
  • Christian Van Delft
  • Yves Dallery

Abstract

In this paper, we consider a mixed MTS/MTO policy to manage a single manufacturing facility producing two classes of end-products. A few end-products have high volume demands, whereas a fairly large number of end-products have low volume demands. In this situation, it is appealing to try to produce the high volume products according to an MTS policy and the low volume products according to an MTO policy. The purpose of this paper is to analyze and compare the impact of the choice of the scheduling policy on the overall performance of the system. We consider two policies: the classical FIFO policy and a priority policy (PR). The PR policy gives priority to production orders corresponding to low volume products over production orders corresponding to high volume products. Under some simple stochastic modeling assumptions, we develop analytical/numerical solutions to optimise each system. We then provide insights regarding this issue with the help of numerical examples. It appears that for some range of parameters, the PR rule can outperform the FIFO rule in the sense that, to achieve the same service level constraint, the corresponding cost under the PR rule is much lower. This situation is encountered when the low volume products can be managed with an MTO policy under the PR scheduling rule, while they have to be managed according to an MTS policy under the FIFO scheduling rule. We also derive some theoretical properties that support our empirical findings. Copyright Kluwer Academic Publishers 2004

Suggested Citation

  • Khaled Hadj Youssef & Christian Van Delft & Yves Dallery, 2004. "Efficient Scheduling Rules in a Combined Make-to-Stock and Make-to-Order Manufacturing System," Annals of Operations Research, Springer, vol. 126(1), pages 103-134, February.
  • Handle: RePEc:spr:annopr:v:126:y:2004:i:1:p:103-134:10.1023/b:anor.0000012277.97069.a6
    DOI: 10.1023/B:ANOR.0000012277.97069.a6
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1023/B:ANOR.0000012277.97069.a6
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1023/B:ANOR.0000012277.97069.a6?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
    2. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Integrating make-to-order and make-to-stock in job shop control," International Journal of Production Economics, Elsevier, vol. 185(C), pages 1-10.
    3. Almehdawe, Eman & Jewkes, Elizabeth, 2013. "Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy," International Journal of Production Economics, Elsevier, vol. 144(1), pages 200-208.
    4. Pereira, Daniel Filipe & Oliveira, José Fernando & Carravilla, Maria Antónia, 2022. "Merging make-to-stock/make-to-order decisions into sales and operations planning: A multi-objective approach," Omega, Elsevier, vol. 107(C).
    5. Sun, X.Y. & Ji, P. & Sun, L.Y. & Wang, Y.L., 2008. "Positioning multiple decoupling points in a supply network," International Journal of Production Economics, Elsevier, vol. 113(2), pages 943-956, June.
    6. Beemsterboer, Bart & Land, Martin & Teunter, Ruud & Bokhorst, Jos, 2017. "Reprint of “Integrating make-to-order and make-to-stock in job shop control”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 3-12.
    7. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
    8. Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
    9. Akkerman, Renzo & van Donk, Dirk Pieter, 2007. "Product prioritization in a two-stage food production system with intermediate storage," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 43-53, July.
    10. N Sanajian & H Abouee-Mehrizi & B Balcıog̃lu, 2010. "Scheduling policies in the M/G/1 make-to-stock queue," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(1), pages 115-123, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:126:y:2004:i:1:p:103-134:10.1023/b:anor.0000012277.97069.a6. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.