IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v122y2009i1p508-516.html
   My bibliography  Save this article

Best-matching protocols for assembly in e-work networks

Author

Listed:
  • Velásquez, J.D.
  • Nof, S.Y.

Abstract

Assembly networks pose many challenges to the comprising businesses due to their ever-growing distributed nature. This article explores the benefits of incorporating best-matching protocols (BMP) into the principles of design for assembly (DFA) to make better use of already existing information on equipment, parts and suppliers. Best-matching protocols for cooperation requirement planning (BMP-CRP), for part matching (BMP-part) and supplier selection were developed. A case study for the matching of parts and suppliers is provided. The results of the case study corroborate the benefits in quality and costs that the best-matching protocols can yield for businesses in an assembly e-work network.

Suggested Citation

  • Velásquez, J.D. & Nof, S.Y., 2009. "Best-matching protocols for assembly in e-work networks," International Journal of Production Economics, Elsevier, vol. 122(1), pages 508-516, November.
  • Handle: RePEc:eee:proeco:v:122:y:2009:i:1:p:508-516
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(09)00215-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wu, Chien-Wei & Pearn, W.L. & Kotz, Samuel, 2009. "An overview of theory and practice on process capability indices for quality assurance," International Journal of Production Economics, Elsevier, vol. 117(2), pages 338-359, February.
    2. Anussornnitisarn, Pornthep & Nof, Shimon Y. & Etzion, Opher, 2005. "Decentralized control of cooperative and autonomous agents for solving the distributed resource allocation problem," International Journal of Production Economics, Elsevier, vol. 98(2), pages 114-128, November.
    3. Ceroni, Jose A. & Matsui, Masayuki & Y. Nof, Shimon, 1999. "Communication-based coordination modeling in distributed manufacturing systems," International Journal of Production Economics, Elsevier, vol. 60(1), pages 281-287, April.
    4. Thammakoranonta, Nithinant & Radhakrishnan, Abirami & Davis, Steve & Peck, John C. & Miller, Janis L., 2008. "A protocol for the order commitment decision in a supply network," International Journal of Production Economics, Elsevier, vol. 115(2), pages 515-527, October.
    5. Velasquez, Juan D. & Lara, Marco A. & Nof, Shimon Y., 2008. "Systematic resolution of conflict situations in collaborative facility design," International Journal of Production Economics, Elsevier, vol. 116(1), pages 139-153, November.
    6. Balakrishnan, Nagraj (Raju) & Chakravarty, Amiya K., 2008. "Product design with multiple suppliers for component variants," International Journal of Production Economics, Elsevier, vol. 112(2), pages 723-741, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jahanpour, Ehsan & Ko, Hoo Sang & Nof, Shimon Y., 2016. "Collaboration protocols for sustainable wind energy distribution networks," International Journal of Production Economics, Elsevier, vol. 182(C), pages 496-507.
    2. Scavarda, Manuel & Seok, Hyesung & Puranik, Anurag S. & Nof, Shimon Y., 2015. "Adaptive direct/indirect delivery decision protocol by collaborative negotiation among manufacturers, distributors, and retailers," International Journal of Production Economics, Elsevier, vol. 167(C), pages 232-245.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wu, Chien-Wei, 2012. "An efficient inspection scheme for variables based on Taguchi capability index," European Journal of Operational Research, Elsevier, vol. 223(1), pages 116-122.
    2. Chien-Wei Wu & Zih-Huei Wang, 2017. "Developing a variables multiple dependent state sampling plan with simultaneous consideration of process yield and quality loss," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2351-2364, April.
    3. Chien-Wei Wu & Ming-Hung Shu & Pei-An Wang & Bi-Min Hsu, 2021. "Variables skip-lot sampling plans on the basis of process capability index for products with a low fraction of defectives," Computational Statistics, Springer, vol. 36(2), pages 1391-1413, June.
    4. Anussornnitisarn, Pornthep & Nof, Shimon Y. & Etzion, Opher, 2005. "Decentralized control of cooperative and autonomous agents for solving the distributed resource allocation problem," International Journal of Production Economics, Elsevier, vol. 98(2), pages 114-128, November.
    5. Peruchi, Rogério Santana & Balestrassi, Pedro Paulo & de Paiva, Anderson Paulo & Ferreira, João Roberto & de Santana Carmelossi, Michele, 2013. "A new multivariate gage R&R method for correlated characteristics," International Journal of Production Economics, Elsevier, vol. 144(1), pages 301-315.
    6. Wu, Chien-Wei & Aslam, Muhammad & Jun, Chi-Hyuck, 2012. "Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk," European Journal of Operational Research, Elsevier, vol. 217(3), pages 560-566.
    7. Li, Der-Chiang & Lin, Liang-Sian, 2013. "A new approach to assess product lifetime performance for small data sets," European Journal of Operational Research, Elsevier, vol. 230(2), pages 290-298.
    8. Michele Scagliarini, 2011. "Multivariate process capability using principal component analysis in the presence of measurement errors," AStA Advances in Statistical Analysis, Springer;German Statistical Society, vol. 95(2), pages 113-128, June.
    9. Marta Benková & Dagmar Bednárová & Gabriela Bogdanovská, 2024. "Process Capability Evaluation Using Capability Indices as a Part of Statistical Process Control," Mathematics, MDPI, vol. 12(11), pages 1-29, May.
    10. Pedro Veiga & Luis Mendes & Luis Lourenço, 2016. "A retrospective view of statistical quality control research and identification of emerging trends: a bibliometric analysis," Quality & Quantity: International Journal of Methodology, Springer, vol. 50(2), pages 673-692, March.
    11. George Sebastian & Sasi Ajitha, 2017. "Bootstrap Lower Confidence Limits of Superstructure Process Capability Indices for Esscher-Transformed Laplace Distribution," Stochastics and Quality Control, De Gruyter, vol. 32(2), pages 87-98, December.
    12. L. X. Cui, 2016. "Joint optimization of production planning and supplier selection incorporating customer flexibility: an improved genetic approach," Journal of Intelligent Manufacturing, Springer, vol. 27(5), pages 1017-1035, October.
    13. Xu, Henry & Koh, Lenny & Parker, David, 2009. "Business processes inter-operation for supply network co-ordination," International Journal of Production Economics, Elsevier, vol. 122(1), pages 188-199, November.
    14. Patalas-Maliszewska Justyna, 2013. "A Model of Knowledge Sharing in Polish Manufacturing Enterprises," Foundations of Management, Sciendo, vol. 5(2), pages 39-48, December.
    15. Muhammad Aslam & Mohammed Albassam, 2019. "Inspection Plan Based on the Process Capability Index Using the Neutrosophic Statistical Method," Mathematics, MDPI, vol. 7(7), pages 1-10, July.
    16. Kuen-Suan Chen & Tsang-Chuan Chang & Chien-Che Huang, 2020. "Supplier Selection by Fuzzy Assessment and Testing for Process Quality under Consideration with Data Imprecision," Mathematics, MDPI, vol. 8(9), pages 1-14, August.
    17. Amy H. I. Lee & Chien-Wei Wu & Yen-Wen Chen, 2016. "A modified variables repetitive group sampling plan with the consideration of preceding lots information," Annals of Operations Research, Springer, vol. 238(1), pages 355-373, March.
    18. Linda Zhang & Carman Lee & Shuzhu Zhang, 2016. "An integrated model for strategic supply chain design: Formulation and ABC-based solution approach," Post-Print hal-01744868, HAL.
    19. Wang, Ching-Hsin & Chen, Kuen-Suan, 2020. "New process yield index of asymmetric tolerances for bootstrap method and six sigma approach," International Journal of Production Economics, Elsevier, vol. 219(C), pages 216-223.
    20. Sang Ko, Hoo & Nof, Shimon Y., 2012. "Design and application of task administration protocols for collaborative production and service systems," International Journal of Production Economics, Elsevier, vol. 135(1), pages 177-189.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:122:y:2009:i:1:p:508-516. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.