A project scheduling problem with labour constraints and time-dependent activities requirements

Author

Listed:
  • Drezet, L.-E.
  • Billaut, J.-C.

Abstract

We consider in this paper a project scheduling problem where resources are employees and activity requirements are time-dependent. Furthermore, employees have different skills and legal constraints dictated by the French workforce legislation have to be respected. The project has to be scheduled and employees have to be assigned to activities, so that most of the constraints are respected and the maximal lateness is minimized. We first give a linear programming formulation of the problem. Then, greedy algorithms are proposed to give an approximate solution to the problem. These methods give an initial solution to a Tabu search algorithm. Finally, computational experiments are conducted and results are discussed.

Suggested Citation

  • Drezet, L.-E. & Billaut, J.-C., 2008. "A project scheduling problem with labour constraints and time-dependent activities requirements," International Journal of Production Economics, Elsevier, vol. 112(1), pages 217-225, March.
  • Handle: RePEc:eee:proeco:v:112:y:2008:i:1:p:217-225
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00140-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Haase, Knut & Latteier, Jorg & Schirmer, Andreas, 1998. "The course scheduling problem at Lufthansa Technical Training," European Journal of Operational Research, Elsevier, vol. 110(3), pages 441-456, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Layin Wang & Dong Zhao & Yanqi Zhong, 2021. "Sustainable Allocation Model of Construction Workforce for Work Resumption during COVID-19," Sustainability, MDPI, vol. 13(11), pages 1-22, June.
    2. Banaszak, Z.A. & Zaremba, M.B. & Muszynski, W., 2009. "Constraint programming for project-driven manufacturing," International Journal of Production Economics, Elsevier, vol. 120(2), pages 463-475, August.
    3. Park, Jongyoon & Han, Jinil & Lee, Kyungsik, 2022. "Integer Optimization Model and Algorithm for the Stem Cell Culturing Problem," Omega, Elsevier, vol. 108(C).
    4. Russell, Arya & Taghipour, Sharareh, 2019. "Multi-objective optimization of complex scheduling problems in low-volume low-variety production systems," International Journal of Production Economics, Elsevier, vol. 208(C), pages 1-16.
    5. Ramírez Palencia, Alberto E. & Mejía Delgadillo, Gonzalo E., 2012. "A computer application for a bus body assembly line using Genetic Algorithms," International Journal of Production Economics, Elsevier, vol. 140(1), pages 431-438.
    6. Volland, Jonas & Fügener, Andreas & Brunner, Jens O., 2017. "A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals," European Journal of Operational Research, Elsevier, vol. 260(1), pages 316-334.
    7. Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
    8. Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
    9. Snauwaert, Jakob & Vanhoucke, Mario, 2023. "A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 307(1), pages 1-19.
    10. Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
    11. Meya Haroune & Cheikh Dhib & Emmanuel Neron & Ameur Soukhal & Hafed Mohamed Babou & Mohamedade Farouk Nanne, 2023. "Multi-project scheduling problem under shared multi-skill resource constraints," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 31(1), pages 194-235, April.
    12. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    13. Chen, Chung-Yang & Liu, Heng-An & Song, Je-Yi, 2013. "Integrated projects planning in IS departments: A multi-period multi-project selection and assignment approach with a computerized implementation," European Journal of Operational Research, Elsevier, vol. 229(3), pages 683-694.
    14. Park, Jongyoon & Han, Jinil & Lee, Kyungsik, 2024. "Integer optimization models and algorithms for the multi-period non-shareable resource allocation problem," European Journal of Operational Research, Elsevier, vol. 317(1), pages 43-59.
    15. Broos Maenhout & Mario Vanhoucke, 2017. "A resource type analysis of the integrated project scheduling and personnel staffing problem," Annals of Operations Research, Springer, vol. 252(2), pages 407-433, May.
    16. Shaukat, Syed & Katscher, Mathias & Wu, Cheng-Lung & Delgado, Felipe & Larrain, Homero, 2020. "Aircraft line maintenance scheduling and optimisation," Journal of Air Transport Management, Elsevier, vol. 89(C).
    17. Adrian Zimmermann & Norbert Trautmann, 2018. "A list-scheduling heuristic for the short-term planning of assessment centers," Journal of Scheduling, Springer, vol. 21(2), pages 131-142, April.
    18. Rong Chen & Changyong Liang & Dongxiao Gu & Joseph Y-T. Leung, 2017. "A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution," International Journal of Production Research, Taylor & Francis Journals, vol. 55(21), pages 6207-6234, November.
    19. Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
    20. Lin, B.M.T. & Liu, S.T., 2008. "Maximizing the reward in the relocation problem with generalized due dates," International Journal of Production Economics, Elsevier, vol. 115(1), pages 55-63, September.
    21. Ripon K. Chakrabortty & Ruhul A. Sarker & Daryl L. Essam, 2020. "Single mode resource constrained project scheduling with unreliable resources," Operational Research, Springer, vol. 20(3), pages 1369-1403, September.
    22. Hartmann, Sönke, 2011. "Project scheduling with resource capacities and requests varying with time," Working Paper Series 01/2011, Hamburg School of Business Administration (HSBA).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Schirmer, Andreas & Potzhar, Kathrin, 2001. "Professional course scheduling in airline transport pilot training: A case from Lufthansa flight training," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 539, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    2. Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
    3. Schirmer, Armin, 1998. "Adaptive control schemes for parameterized heuristic scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 488, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    4. Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
    5. Schirmer, Andreas, 1999. "Fast iterative improvement methods for project scheduling under partially renewable resources," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 501, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    6. Schirmer, Andreas & Potzahr, Kathrin, 2001. "Lehrgangsplanung für die Ausbildung von Verkehrsflugzeugführern: Ergebnisse einer Studie bei Lufthansa Flight Training," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 538, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    7. Schirmer, Andreas, 1999. "Adaptive control schemes applied to project scheduling with partially renewable resources," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 520, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    8. Kozanidis, George, 2017. "Optimal assignment of aircrew trainees to simulator and classroom training sessions subject to seniority and preference restrictions," Journal of Air Transport Management, Elsevier, vol. 59(C), pages 143-154.
    9. Xiangtong Qi & Jonathan F. Bard & Gang Yu, 2004. "Class Scheduling for Pilot Training," Operations Research, INFORMS, vol. 52(1), pages 148-162, February.
    10. M Bazargan-Lari, 2004. "Flexible versus fixed timetabling: a case study," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(2), pages 123-131, February.
    11. Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre (Ed.), 1999. "Jahresbericht 1998," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 495, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:112:y:2008:i:1:p:217-225. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.