A new when-to-schedule policy in online scheduling based on cumulative task delays
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Nabil R. Adam & Julius Surkis, 1980. "Priority Update Intervals and Anomalies in Dynamic Ratio Type Job Shop Scheduling Rules," Management Science, INFORMS, vol. 26(12), pages 1227-1237, December.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- B L MacCarthy & T Wasusri, 2001. "Statistical process control for monitoring scheduling performance—addressing the problem of correlated data," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(7), pages 810-820, July.
- Kenneth R. Baker & David W. Peterson, 1979. "An Analytic Framework for Evaluating Rolling Schedules," Management Science, INFORMS, vol. 25(4), pages 341-351, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chuang Wang & Pingyu Jiang, 2018. "Manifold learning based rescheduling decision mechanism for recessive disturbances in RFID-driven job shops," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1485-1500, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Garay-Sianca, Aniela & Nurre Pinkley, Sarah G., 2021. "Interdependent integrated network design and scheduling problems with movement of machines," European Journal of Operational Research, Elsevier, vol. 289(1), pages 297-327.
- Marko Ɖurasević & Domagoj Jakobović, 2019. "Creating dispatching rules by simple ensemble combination," Journal of Heuristics, Springer, vol. 25(6), pages 959-1013, December.
- Byung-Cheon Choi & Myoung-Ju Park, 2015. "A Batch Scheduling Problem with Two Agents," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 32(06), pages 1-19, December.
- Dunstall, Simon & Wirth, Andrew, 2005. "A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines," European Journal of Operational Research, Elsevier, vol. 167(2), pages 283-296, December.
- Salewski, Frank & Nissen, Rüdiger, 1993. "Revidierende hierarchische Planung: Ein Konzept am Beispiel der Personaleinsatzplanung in Wirtschaftsprüfungsgesellschaften," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 335, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Löhndorf, Nils & Riel, Manuel & Minner, Stefan, 2014. "Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 157(C), pages 170-176.
- Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
- Brucker, Peter & Knust, Sigrid & Wang, Guoqing, 2005. "Complexity results for flow-shop problems with a single server," European Journal of Operational Research, Elsevier, vol. 165(2), pages 398-407, September.
- Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.
- Ravindran Vijayalakshmi, Vipin & Schröder, Marc & Tamir, Tami, 2024. "Minimizing total completion time with machine-dependent priority lists," European Journal of Operational Research, Elsevier, vol. 315(3), pages 844-854.
- Monkman, Susan K. & Morrice, Douglas J. & Bard, Jonathan F., 2008. "A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1100-1114, June.
- repec:dgr:rugsom:02a72 is not listed on IDEAS
- S-W Lin & K-C Ying, 2008. "A hybrid approach for single-machine tardiness problems with sequence-dependent setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(8), pages 1109-1119, August.
- Lukac, Zrinka & Soric, Kristina & Rosenzweig, Visnja Vojvodic, 2008. "Production planning problem with sequence dependent setups as a bilevel programming problem," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1504-1512, June.
- Havill, Jessen T. & Mao, Weizhen, 2008. "Competitive online scheduling of perfectly malleable jobs with setup times," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1126-1142, June.
- Dirk Briskorn & Konrad Stephan & Nils Boysen, 2022. "Minimizing the makespan on a single machine subject to modular setups," Journal of Scheduling, Springer, vol. 25(1), pages 125-137, February.
- Morais, Rafael & Bulhões, Teobaldo & Subramanian, Anand, 2024. "Exact and heuristic algorithms for minimizing the makespan on a single machine scheduling problem with sequence-dependent setup times and release dates," European Journal of Operational Research, Elsevier, vol. 315(2), pages 442-453.
- Tony T. Tran & Arthur Araujo & J. Christopher Beck, 2016. "Decomposition Methods for the Parallel Machine Scheduling Problem with Setups," INFORMS Journal on Computing, INFORMS, vol. 28(1), pages 83-95, February.
- Rauchecker, Gerhard & Schryen, Guido, 2019. "An exact branch-and-price algorithm for scheduling rescue units during disaster response," European Journal of Operational Research, Elsevier, vol. 272(1), pages 352-363.
- J N D Gupta & J E Schaller, 2006. "Minimizing flow time in a flow-line manufacturing cell with family setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(2), pages 163-176, February.
- Kriett, Phillip Oliver & Salani, Matteo, 2012. "Optimal control of a residential microgrid," Energy, Elsevier, vol. 42(1), pages 321-330.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:110:y:2007:i:1-2:p:175-186. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.