IDEAS home Printed from https://ideas.repec.org/a/eee/jrpoli/v33y2008i4p222-229.html
   My bibliography  Save this article

Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits

Author

Listed:
  • Osanloo, M.
  • Rashidinejad, F.
  • Rezai, B.

Abstract

Cut-off grade is defined as the grade which discriminates between ore and waste within a given orebody. Determination of a complete optimum cut-off grade policy is a very important function during mine life. Using the modified optimum cut-off grade model presented in this paper not only the net present value of a porphyry copper mining project is maximized, but also the adverse environmental impacts of the project are minimized simultaneously. This methodology is more effective in long-range planning. For showing the effectiveness of the model, two scenarios are considered in a hypothetical deposit and the results show that incorporating the modified optimum cut-off grade policy, the net present value will be increased by 3.6% in comparison with the Base Case.

Suggested Citation

  • Osanloo, M. & Rashidinejad, F. & Rezai, B., 2008. "Incorporating environmental issues into optimum cut-off grades modeling at porphyry copper deposits," Resources Policy, Elsevier, vol. 33(4), pages 222-229, December.
  • Handle: RePEc:eee:jrpoli:v:33:y:2008:i:4:p:222-229
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0301-4207(08)00042-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Asad, Mohammad Waqar Ali & Dimitrakopoulos, Roussos, 2013. "A heuristic approach to stochastic cutoff grade optimization for open pit mining complexes with multiple processing streams," Resources Policy, Elsevier, vol. 38(4), pages 591-597.
    2. Ahmadi, Mohammad Reza & Bazzazi, Abbas Aghajani, 2019. "Cutoff grades optimization in open pit mines using meta-heuristic algorithms," Resources Policy, Elsevier, vol. 60(C), pages 72-82.
    3. Ahmadi, Mohammad Reza & Shahabi, Reza Shakoor, 2018. "Cutoff grade optimization in open pit mines using genetic algorithm," Resources Policy, Elsevier, vol. 55(C), pages 184-191.
    4. Khan, Asif & Asad, Mohammad Waqar Ali, 2019. "A method for optimal cut-off grade policy in open pit mining operations under uncertain supply," Resources Policy, Elsevier, vol. 60(C), pages 178-184.
    5. Biswas, Pritam & Sinha, Rabindra Kumar & Sen, Phalguni, 2023. "A review of state-of-the-art techniques for the determination of the optimum cut-off grade of a metalliferous deposit with a bibliometric mapping in a surface mine planning context," Resources Policy, Elsevier, vol. 83(C).
    6. Azimi, Yousuf & Osanloo, Morteza & Esfahanipour, Akbar, 2013. "An uncertainty based multi-criteria ranking system for open pit mining cut-off grade strategy selection," Resources Policy, Elsevier, vol. 38(2), pages 212-223.
    7. Khan, Asif & Asad, Mohammad Waqar Ali, 2021. "A mixed integer programming based cut-off grade model for open-pit mining of complex poly-metallic resources," Resources Policy, Elsevier, vol. 72(C).
    8. Zhang, Kuangyuan & Kleit, Andrew N., 2016. "Mining rate optimization considering the stockpiling: A theoretical economics and real option model," Resources Policy, Elsevier, vol. 47(C), pages 87-94.
    9. Asad, Mohammad Waqar Ali & Qureshi, Muhammad Asim & Jang, Hyongdoo, 2016. "A review of cut-off grade policy models for open pit mining operations," Resources Policy, Elsevier, vol. 49(C), pages 142-152.
    10. Rahimi, Esmaeil & Ghasemzadeh, Hasan, 2015. "A new algorithm to determine optimum cut-off grades considering technical, economical, environmental and social aspects," Resources Policy, Elsevier, vol. 46(P1), pages 51-63.
    11. Rahimi, Esmaeil & Akbari, Afshin, 2016. "Application of KKT in determining the final destination of mined material in multi-processing mines," Resources Policy, Elsevier, vol. 50(C), pages 10-18.
    12. Waqar Ali Asad, Mohammad & Dimitrakopoulos, Roussos, 2012. "Optimal production scale of open pit mining operations with uncertain metal supply and long-term stockpiles," Resources Policy, Elsevier, vol. 37(1), pages 81-89.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jrpoli:v:33:y:2008:i:4:p:222-229. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/30467 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.