An inventory model under linked-to-order hybrid partial advance payment, partial credit policy, all-units discount and partial backlogging with capacity constraint
Author
Abstract
Suggested Citation
DOI: 10.1016/j.omega.2021.102418
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Tiwari, Sunil & Cárdenas-Barrón, Leopoldo Eduardo & Goh, Mark & Shaikh, Ali Akbar, 2018. "Joint pricing and inventory model for deteriorating items with expiration dates and partial backlogging under two-level partial trade credits in supply chain," International Journal of Production Economics, Elsevier, vol. 200(C), pages 16-36.
- Taleizadeh, Ata Allah & Pentico, David W., 2014. "An Economic Order Quantity model with partial backordering and all-units discount," International Journal of Production Economics, Elsevier, vol. 155(C), pages 172-184.
- Ries, Jörg M. & Glock, Christoph H. & Schwindl, Kurt, 2017. "The influence of financial conditions on optimal ordering and payment policies under progressive interest schemes," Omega, Elsevier, vol. 70(C), pages 15-30.
- Deng, Sijing & Fu, Ke & Xu, Jiayan & Zhu, Kaijie, 2021. "The supply chain effects of trade credit under uncertain demands," Omega, Elsevier, vol. 98(C).
- Seifert, Daniel & Seifert, Ralf W. & Protopappa-Sieke, Margarita, 2013. "A review of trade credit literature: Opportunities for research in operations," European Journal of Operational Research, Elsevier, vol. 231(2), pages 245-256.
- Md. Al-Amin Khan & Ali Akbar Shaikh & Gobinda Chandra Panda & Asoke Kumar Bhunia & Ioannis Konstantaras, 2020. "Non-instantaneous deterioration effect in ordering decisions for a two-warehouse inventory system under advance payment and backlogging," Annals of Operations Research, Springer, vol. 289(2), pages 243-275, June.
- Ouyang, Liang-Yuh & Teng, Jinn-Tsair & Goyal, Suresh Kumar & Yang, Chih-Te, 2009. "An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity," European Journal of Operational Research, Elsevier, vol. 194(2), pages 418-431, April.
- Zhou, Yong-Wu & Yang, Shan-Lin, 2005. "A two-warehouse inventory model for items with stock-level-dependent demand rate," International Journal of Production Economics, Elsevier, vol. 95(2), pages 215-228, February.
- Chen, Sheng-Chih & Cárdenas-Barrón, Leopoldo Eduardo & Teng, Jinn-Tsair, 2014. "Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity," International Journal of Production Economics, Elsevier, vol. 155(C), pages 284-291.
- Vandana, & Kaur, Arshinder, 2019. "Two-level trade credit with default risk in the supply chain under stochastic demand," Omega, Elsevier, vol. 88(C), pages 4-23.
- Zhang, Qinhong & Zhang, Dali & Tsao, Yu-Chung & Luo, Jianwen, 2016. "Optimal ordering policy in a two-stage supply chain with advance payment for stable supply capacity," International Journal of Production Economics, Elsevier, vol. 177(C), pages 34-43.
- Huang, Yung-Fu, 2007. "Economic order quantity under conditionally permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 176(2), pages 911-924, January.
- Taleizadeh, Ata Allah & Pentico, David W. & Saeed Jabalameli, Mohammad & Aryanezhad, Mirbahador, 2013. "An EOQ model with partial delayed payment and partial backordering," Omega, Elsevier, vol. 41(2), pages 354-368.
- Liao, Jui-Jung & Huang, Kuo-Nan & Chung, Kun-Jen, 2012. "Lot-sizing decisions for deteriorating items with two warehouses under an order-size-dependent trade credit," International Journal of Production Economics, Elsevier, vol. 137(1), pages 102-115.
- Wutthisirisart, Phichet & Sir, Mustafa Y. & Noble, James S., 2015. "The two-warehouse material location selection problem," International Journal of Production Economics, Elsevier, vol. 170(PC), pages 780-789.
- Sarma, K. V. S., 1987. "A deterministic order level inventory model for deteriorating items with two storage facilities," European Journal of Operational Research, Elsevier, vol. 29(1), pages 70-73, April.
- Tiwari, Sunil & Cárdenas-Barrón, Leopoldo Eduardo & Khanna, Aditi & Jaggi, Chandra K., 2016. "Impact of trade credit and inflation on retailer's ordering policies for non-instantaneous deteriorating items in a two-warehouse environment," International Journal of Production Economics, Elsevier, vol. 176(C), pages 154-169.
- Pourmohammad Zia, Nadia & Taleizadeh, Ata Allah, 2015. "A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 82(C), pages 19-37.
- Huang, Yung-Fu & Hsu, Kuang-Hua, 2008. "An EOQ model under retailer partial trade credit policy in supply chain," International Journal of Production Economics, Elsevier, vol. 112(2), pages 655-664, April.
- Mohsen Lashgari & Ata Allah Taleizadeh & Seyed Jafar Sadjadi, 2018. "Ordering policies for non-instantaneous deteriorating items under hybrid partial prepayment, partial trade credit and partial backordering," Journal of the Operational Research Society, Taylor & Francis Journals, vol. 69(8), pages 1167-1196, August.
- Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
- Taleizadeh, Ata Allah, 2014. "An EOQ model with partial backordering and advance payments for an evaporating item," International Journal of Production Economics, Elsevier, vol. 155(C), pages 185-193.
- San-José, L.A. & Sicilia, J. & García-Laguna, J., 2015. "Analysis of an EOQ inventory model with partial backordering and non-linear unit holding cost," Omega, Elsevier, vol. 54(C), pages 147-157.
- Zhang, Alex X., 1996. "Optimal advance payment scheme involving fixed per-payment costs," Omega, Elsevier, vol. 24(5), pages 577-582, October.
- Chang, Chun-Tao & Teng, Jinn-Tsair & Chern, Maw-Sheng, 2010. "Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits," International Journal of Production Economics, Elsevier, vol. 127(1), pages 197-202, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Md. Abdul Hakim & Ibrahim M. Hezam & Adel Fahad Alrasheedi & Jeonghwan Gwak, 2022. "Pricing Policy in an Inventory Model with Green Level Dependent Demand for a Deteriorating Item," Sustainability, MDPI, vol. 14(8), pages 1-16, April.
- Majed G. Alharbi, 2022. "Carbon Reduction Technology Based on Imperfect Production System for Deteriorating Items with Warranty Periods and Greenness Dependent Demand," Sustainability, MDPI, vol. 14(22), pages 1-16, November.
- Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.
- Ghiami, Yousef, 2023. "An analysis on production and inventory models with discounted cash-flows," Omega, Elsevier, vol. 117(C).
- Khan, Md. Al-Amin & Cárdenas-Barrón, Leopoldo Eduardo & Treviño-Garza, Gerardo & Céspedes-Mota, Armando, 2023. "Installment for advance payment and pricing decisions for an inventory system under power demand pattern and all-units discount," International Journal of Production Economics, Elsevier, vol. 265(C).
- Cao, Yunzhi & Zhu, Xiaoyan & Yan, Houmin, 2022. "Data-driven Wasserstein distributionally robust mitigation and recovery against random supply chain disruption," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 163(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Chandan Mahato & Gour Chandra Mahata, 2023. "Sustainable partial backordering inventory model under linked-to-order credit policy and all-units discount with capacity constraint and carbon emissions," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 896-944, September.
- Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
- Pourmohammad Zia, Nadia & Taleizadeh, Ata Allah, 2015. "A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 82(C), pages 19-37.
- Li, Ruihai & Skouri, Konstantina & Teng, Jinn-Tsair & Yang, Wen-Goang, 2018. "Seller's optimal replenishment policy and payment term among advance, cash, and credit payments," International Journal of Production Economics, Elsevier, vol. 197(C), pages 35-42.
- Mamta Gupta & Sunil Tiwari & Chandra K. Jaggi, 2020. "Retailer’s ordering policies for time-varying deteriorating items with partial backlogging and permissible delay in payments in a two-warehouse environment," Annals of Operations Research, Springer, vol. 295(1), pages 139-161, December.
- Xu, Xinhan & Chen, Xiangfeng & Jia, Fu & Brown, Steve & Gong, Yu & Xu, Yifan, 2018. "Supply chain finance: A systematic literature review and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 204(C), pages 160-173.
- Ata Allah Taleizadeh & Shayan Tavakoli & Luis Augusto San-José, 2018. "A lot sizing model with advance payment and planned backordering," Annals of Operations Research, Springer, vol. 271(2), pages 1001-1022, December.
- Lin Feng & Konstantina Skouri & Wan-Chih Wang & Jinn-Tsair Teng, 2022. "Optimal selling price, replenishment cycle and payment time among advance, cash, and credit payments from the seller’s perspective," Annals of Operations Research, Springer, vol. 315(2), pages 791-812, August.
- Ata Allah Taleizadeh & Nadia Pourmohammad-Zia & Ioannis Konstantaras, 2021. "Partial linked-to-order delayed payment and life time effects on decaying items ordering," Operational Research, Springer, vol. 21(3), pages 2077-2099, September.
- Yan Shi & Zhiyong Zhang & Sunil Tiwari & Zhiwen Tao, 2022. "Retailer's optimal strategy for a perishable product with increasing demand under various payment schemes," Annals of Operations Research, Springer, vol. 315(2), pages 899-929, August.
- A. Thangam, 2017. "Retailer’s optimal replenishment policy in a two-echelon supply chain under two-part delay in payments and disruption in delivery," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 26-46, January.
- Zhou, Yong-Wu & Zhong, Yuanguang & Li, Jicai, 2012. "An uncooperative order model for items with trade credit, inventory-dependent demand and limited displayed-shelf space," European Journal of Operational Research, Elsevier, vol. 223(1), pages 76-85.
- Feng, Lin & Wang, Wan-Chih & Teng, Jinn-Tsair & Cárdenas-Barrón, Leopoldo Eduardo, 2022. "Pricing and lot-sizing decision for fresh goods when demand depends on unit price, displaying stocks and product age under generalized payments," European Journal of Operational Research, Elsevier, vol. 296(3), pages 940-952.
- Johari, Maryam & Hosseini-Motlagh, Seyyed-Mahdi & Nematollahi, Mohammadreza & Goh, Mark & Ignatius, Joshua, 2018. "Bi-level credit period coordination for periodic review inventory system with price-credit dependent demand under time value of money," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 270-291.
- Khan, Md. Al-Amin & Cárdenas-Barrón, Leopoldo Eduardo & Treviño-Garza, Gerardo & Céspedes-Mota, Armando, 2023. "Installment for advance payment and pricing decisions for an inventory system under power demand pattern and all-units discount," International Journal of Production Economics, Elsevier, vol. 265(C).
- Chung, Kun-Jen & Eduardo Cárdenas-Barrón, Leopoldo & Ting, Pin-Shou, 2014. "An inventory model with non-instantaneous receipt and exponentially deteriorating items for an integrated three layer supply chain system under two levels of trade credit," International Journal of Production Economics, Elsevier, vol. 155(C), pages 310-317.
- Mohsen Lashgari & Ata Allah Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
- Hui-Ling Yang & Chun-Tao Chang & Yao-Ting Tseng, 2024. "Optimal Replenishment Strategy for a High-Tech Product Demand with Non-Instantaneous Deterioration under an Advance-Cash-Credit Payment Scheme by a Discounted Cash-Flow Analysis," Mathematics, MDPI, vol. 12(19), pages 1-25, October.
- Li, Ruihai & Liu, YuPing & Teng, Jinn-Tsair & Tsao, Yu-Chung, 2019. "Optimal pricing, lot-sizing and backordering decisions when a seller demands an advance-cash-credit payment scheme," European Journal of Operational Research, Elsevier, vol. 278(1), pages 283-295.
- Chandan Mahato & Gour Chandra Mahata, 2023. "Optimal ordering policy under order-size dependent trade credit and complete backlogging derived algebraically," OPSEARCH, Springer;Operational Research Society of India, vol. 60(1), pages 420-444, March.
More about this item
Keywords
Economic order quantity; Capacity constraint; Prepayment; Delay payment; Linked-to-order hybrid payment scheme; Partial backordering;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:103:y:2021:i:c:s030504832100027x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.