Optimal ordering policy under order-size dependent trade credit and complete backlogging derived algebraically
Author
Abstract
Suggested Citation
DOI: 10.1007/s12597-022-00614-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Goyal, Suresh Kumar & Teng, Jinn-Tsair & Chang, Chun-Tao, 2007. "Optimal ordering policies when the supplier provides a progressive interest scheme," European Journal of Operational Research, Elsevier, vol. 179(2), pages 404-413, June.
- Chandan Mahato & Gour Chandra Mahata, 2022. "Decaying items inventory models with partial linked-to-order upstream trade credit and downstream full trade credit," Journal of Management Analytics, Taylor & Francis Journals, vol. 9(1), pages 137-168, January.
- Gour Chandra Mahata, 2015. "An integrated production-inventory model with backorder and lot for lot policy in fuzzy sense," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 7(1), pages 69-102.
- Teng, Jinn-Tsair & Chang, Chun-Tao, 2009. "Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy," European Journal of Operational Research, Elsevier, vol. 195(2), pages 358-363, June.
- Yang, Hui-Ling & Teng, Jinn-Tsair & Chern, Maw-Sheng, 2010. "An inventory model under inflation for deteriorating items with stock-dependent consumption rate and partial backlogging shortages," International Journal of Production Economics, Elsevier, vol. 123(1), pages 8-19, January.
- Teng, Jinn-Tsair & Chang, Chun-Tao & Goyal, Suresh Kumar, 2005. "Optimal pricing and ordering policy under permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 97(2), pages 121-129, August.
- Chen, Sheng-Chih & Cárdenas-Barrón, Leopoldo Eduardo & Teng, Jinn-Tsair, 2014. "Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity," International Journal of Production Economics, Elsevier, vol. 155(C), pages 284-291.
- Ata Allah Taleizadeh & Nadia Pourmohammad-Zia & Ioannis Konstantaras, 2021. "Partial linked-to-order delayed payment and life time effects on decaying items ordering," Operational Research, Springer, vol. 21(3), pages 2077-2099, September.
- Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
- Abad, Prakash L., 2008. "Optimal price and order size under partial backordering incorporating shortage, backorder and lost sale costs," International Journal of Production Economics, Elsevier, vol. 114(1), pages 179-186, July.
- Robert A. Davis & Norman Gaither, 1985. "Optimal Ordering Policies Under Conditions of Extended Payment Privileges," Management Science, INFORMS, vol. 31(4), pages 499-509, April.
- Teng, Jinn-Tsair, 2009. "Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers," International Journal of Production Economics, Elsevier, vol. 119(2), pages 415-423, June.
- Wee, Hui-Ming, 1995. "Joint pricing and replenishment policy for deteriorating inventory with declining market," International Journal of Production Economics, Elsevier, vol. 40(2-3), pages 163-171, August.
- Padmanabhan, G. & Vrat, Prem, 1995. "EOQ models for perishable items under stock dependent selling rate," European Journal of Operational Research, Elsevier, vol. 86(2), pages 281-292, October.
- Mohsen Lashgari & Ata Allah Taleizadeh & Seyed Jafar Sadjadi, 2018. "Ordering policies for non-instantaneous deteriorating items under hybrid partial prepayment, partial trade credit and partial backordering," Journal of the Operational Research Society, Taylor & Francis Journals, vol. 69(8), pages 1167-1196, August.
- Jie Min & Yong-Wu Zhou & Gui-Qing Liu & Sheng-Dong Wang, 2012. "An EPQ model for deteriorating items with inventory-level-dependent demand and permissible delay in payments," International Journal of Systems Science, Taylor & Francis Journals, vol. 43(6), pages 1039-1053.
- Chang, Chun-Tao, 2004. "An EOQ model with deteriorating items under inflation when supplier credits linked to order quantity," International Journal of Production Economics, Elsevier, vol. 88(3), pages 307-316, April.
- Charles W. Haley & Robert C. Higgins, 1973. "Inventory Policy and Trade Credit Financing," Management Science, INFORMS, vol. 20(4-Part-I), pages 464-471, December.
- Jaggi, Chandra K. & Yadavalli, V.S.S. & Verma, Mona & Sharma, Anuj, 2015. "An EOQ model with allowable shortage under trade credit in different scenario," Applied Mathematics and Computation, Elsevier, vol. 252(C), pages 541-551.
- Huang, Yung-Fu, 2007. "Economic order quantity under conditionally permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 176(2), pages 911-924, January.
- Ajanta Roy & G.P. Samanta, 2011. "Inventory model with two rates of production for deteriorating items with permissible delay in payments," International Journal of Systems Science, Taylor & Francis Journals, vol. 42(8), pages 1375-1386.
- Wu, Jiang & Chan, Ya-Lan, 2014. "Lot-sizing policies for deteriorating items with expiration dates and partial trade credit to credit-risk customers," International Journal of Production Economics, Elsevier, vol. 155(C), pages 292-301.
- Bhunia, A.K. & Jaggi, Chandra K. & Sharma, Anuj & Sharma, Ritu, 2014. "A two-warehouse inventory model for deteriorating items under permissible delay in payment with partial backlogging," Applied Mathematics and Computation, Elsevier, vol. 232(C), pages 1125-1137.
- Puspita Mahata & Arindam Gupta & Gour Chandra Mahata, 2014. "Optimal pricing and ordering policy for an EPQ inventory system with perishable items under partial trade credit financing," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 21(2), pages 221-251.
- Dye, Chung-Yuan & Ouyang, Liang-Yuh & Hsieh, Tsu-Pang, 2007. "Deterministic inventory model for deteriorating items with capacity constraint and time-proportional backlogging rate," European Journal of Operational Research, Elsevier, vol. 178(3), pages 789-807, May.
- Chang, Chun-Tao & Teng, Jinn-Tsair & Chern, Maw-Sheng, 2010. "Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits," International Journal of Production Economics, Elsevier, vol. 127(1), pages 197-202, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Xu, Xinhan & Chen, Xiangfeng & Jia, Fu & Brown, Steve & Gong, Yu & Xu, Yifan, 2018. "Supply chain finance: A systematic literature review and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 204(C), pages 160-173.
- Bakker, Monique & Riezebos, Jan & Teunter, Ruud H., 2012. "Review of inventory systems with deterioration since 2001," European Journal of Operational Research, Elsevier, vol. 221(2), pages 275-284.
- A. Thangam, 2017. "Retailer’s optimal replenishment policy in a two-echelon supply chain under two-part delay in payments and disruption in delivery," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 26-46, January.
- Feng, Lin & Chan, Ya-Lan, 2019. "Joint pricing and production decisions for new products with learning curve effects under upstream and downstream trade credits," European Journal of Operational Research, Elsevier, vol. 272(3), pages 905-913.
- Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
- Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
- Pentico, David W. & Drake, Matthew J., 2011. "A survey of deterministic models for the EOQ and EPQ with partial backordering," European Journal of Operational Research, Elsevier, vol. 214(2), pages 179-198, October.
- Chern, Maw-Sheng & Pan, Qinhua & Teng, Jinn-Tsair & Chan, Ya-Lan & Chen, Sheng-Chih, 2013. "Stackelberg solution in a vendor–buyer supply chain model with permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 144(1), pages 397-404.
- Li, Ruihai & Skouri, Konstantina & Teng, Jinn-Tsair & Yang, Wen-Goang, 2018. "Seller's optimal replenishment policy and payment term among advance, cash, and credit payments," International Journal of Production Economics, Elsevier, vol. 197(C), pages 35-42.
- Pourmohammad Zia, Nadia & Taleizadeh, Ata Allah, 2015. "A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 82(C), pages 19-37.
- Teng, Jinn-Tsair & Min, Jie & Pan, Qinhua, 2012. "Economic order quantity model with trade credit financing for non-decreasing demand," Omega, Elsevier, vol. 40(3), pages 328-335.
- Yu-Chung Tsao, 2015. "A piecewise nonlinear optimization for a production-inventory model under maintenance, variable setup costs, and trade credits," Annals of Operations Research, Springer, vol. 233(1), pages 465-481, October.
- Soni, Hardik & Shah, Nita H., 2008. "Optimal ordering policy for stock-dependent demand under progressive payment scheme," European Journal of Operational Research, Elsevier, vol. 184(1), pages 91-100, January.
- Mohsen Lashgari & Ata Allah Taleizadeh & Abbas Ahmadi, 2016. "Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain," Annals of Operations Research, Springer, vol. 238(1), pages 329-354, March.
- Aditi Khanna & Aakanksha Kishore & Biswajit Sarkar & Chandra K. Jaggi, 2018. "Supply Chain with Customer-Based Two-Level Credit Policies under an Imperfect Quality Environment," Mathematics, MDPI, vol. 6(12), pages 1-35, December.
- Teng, Jinn-Tsair & Lou, Kuo-Ren & Wang, Lu, 2014. "Optimal trade credit and lot size policies in economic production quantity models with learning curve production costs," International Journal of Production Economics, Elsevier, vol. 155(C), pages 318-323.
- Seifert, Daniel & Seifert, Ralf W. & Protopappa-Sieke, Margarita, 2013. "A review of trade credit literature: Opportunities for research in operations," European Journal of Operational Research, Elsevier, vol. 231(2), pages 245-256.
- Chandan Mahato & Gour Chandra Mahata, 2023. "Sustainable partial backordering inventory model under linked-to-order credit policy and all-units discount with capacity constraint and carbon emissions," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 896-944, September.
- Chen, Sheng-Chih & Cárdenas-Barrón, Leopoldo Eduardo & Teng, Jinn-Tsair, 2014. "Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity," International Journal of Production Economics, Elsevier, vol. 155(C), pages 284-291.
- Khan, Md. Al-Amin & Shaikh, Ali Akbar & Cárdenas-Barrón, Leopoldo Eduardo, 2021. "An inventory model under linked-to-order hybrid partial advance payment, partial credit policy, all-units discount and partial backlogging with capacity constraint," Omega, Elsevier, vol. 103(C).
More about this item
Keywords
Inventory; Economic order quantity; Trade credit; Arithmetic–geometric mean inequality;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:60:y:2023:i:1:d:10.1007_s12597-022-00614-z. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.