Assessment of investment efficiency in a power system under performance-based regulation

Author

Listed:
  • Božič, Dušan
  • Pantoš, Miloš

Abstract

The paper presents a new method for reliability investment decisions when a reward/penalty scheme is applied to the regulation of (distribution system operators) DSOs. The method was developed in order to facilitate the transition from (cost-based regulation) CBR to (performance-based regulation) PBR for distribution utilities. New investment planning criteria for distribution utilities subjected to the new regulatory regime are identified and mathematically formulated as a new (investment efficiency index) IEI, which yields the relation between the improvement of system reliability due to the investment in the electric system and total investment costs. To determine the improvement of system reliability due to the investment in the electric network, the method uses the (Monte Carlo) MC simulation technique for the modeling of the stochastic nature of outages in electric networks, along with a (linear program) LP, which enables us to calculate load flow equations under a fault state and provides information about power deficits in the electric system. The method was tested on Slovenian distribution systems, where several investment candidates were compared in order to determine which projects need to be undertaken in order to achieve the highest possible reliability increase.

Suggested Citation

  • Božič, Dušan & Pantoš, Miloš, 2013. "Assessment of investment efficiency in a power system under performance-based regulation," Energy, Elsevier, vol. 51(C), pages 330-338.
  • Handle: RePEc:eee:energy:v:51:y:2013:i:c:p:330-338
    DOI: 10.1016/j.energy.2012.11.038
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0360544212008997
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.energy.2012.11.038?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Wu, F.F & Zheng, F.L. & Wen, F.S., 2006. "Transmission investment and expansion planning in a restructured electricity market," Energy, Elsevier, vol. 31(6), pages 954-966.
    2. Bresesti, Paola & Calisti, Roberto & Cazzol, Maria Vittoria & Gatti, Antonio & Provenzano, Dario & Vaiani, Andrea & Vailati, Riccardo, 2009. "The benefits of transmission expansions in the competitive electricity markets," Energy, Elsevier, vol. 34(3), pages 274-280.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ghasemi, Mostafa & Dashti, Reza, 2017. "A risk-based model for performance-based regulation of electric distribution companies," Utilities Policy, Elsevier, vol. 45(C), pages 36-44.
    2. Sreenithya Sumesh & Vidyasagar Potdar & Aneesh Krishna, 2019. "Cubic reward penalty structure for power distribution companies," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 350-368, June.
    3. Božič, Dušan & Pantoš, Miloš, 2015. "Impact of electric-drive vehicles on power system reliability," Energy, Elsevier, vol. 83(C), pages 511-520.
    4. Janjic, Aleksandar & Velimirovic, Lazar Z. & Vranic, Petar, 2021. "Designing an electricity distribution reward-penalty scheme based on spatial reliability statistics," Utilities Policy, Elsevier, vol. 70(C).
    5. Ghasemi, Mostafa & Dashti, Reza, 2018. "Designing a decision model to assess the reward and penalty scheme of electric distribution companies," Energy, Elsevier, vol. 147(C), pages 329-336.
    6. Davidov, Sreten & Pantoš, Miloš, 2017. "Stochastic assessment of investment efficiency in a power system," Energy, Elsevier, vol. 119(C), pages 1047-1056.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sara Lumbreras & Jesús David Gómez & Erik Francisco Alvarez & Sebastien Huclin, 2022. "The Human Factor in Transmission Network Expansion Planning: The Grid That a Sustainable Energy System Needs," Sustainability, MDPI, vol. 14(11), pages 1-22, May.
    2. Chamorro, José M. & Abadie, Luis M. & de Neufville, Richard & Ilić, Marija, 2012. "Market-based valuation of transmission network expansion. A heuristic application in GB," Energy, Elsevier, vol. 44(1), pages 302-320.
    3. Kristiansen, T. & Rosellón, J., 2010. "Merchant electricity transmission expansion: A European case study," Energy, Elsevier, vol. 35(10), pages 4107-4115.
    4. Banez-Chicharro, Fernando & Olmos, Luis & Ramos, Andres & Latorre, Jesus M., 2017. "Beneficiaries of transmission expansion projects of an expansion plan: An Aumann-Shapley approach," Applied Energy, Elsevier, vol. 195(C), pages 382-401.
    5. Pineau, P.-O. & Dupuis, D.J. & Cenesizoglu, T., 2015. "Assessing the value of power interconnections under climate and natural gas price risks," Energy, Elsevier, vol. 82(C), pages 128-137.
    6. Hinker, Jonas & Hemkendreis, Christian & Drewing, Emily & März, Steven & Hidalgo Rodríguez, Diego I. & Myrzik, Johanna M.A., 2017. "A novel conceptual model facilitating the derivation of agent-based models for analyzing socio-technical optimality gaps in the energy domain," Energy, Elsevier, vol. 137(C), pages 1219-1230.
    7. Li, Yanfei & Chang, Youngho, 2015. "Infrastructure investments for power trade and transmission in ASEAN+2: Costs, benefits, long-term contracts and prioritized developments," Energy Economics, Elsevier, vol. 51(C), pages 484-492.
    8. Savelli, Iacopo & De Paola, Antonio & Li, Furong, 2020. "Ex-ante dynamic network tariffs for transmission cost recovery," Applied Energy, Elsevier, vol. 258(C).
    9. Pringles, Rolando & Olsina, Fernando & Garcés, Francisco, 2014. "Designing regulatory frameworks for merchant transmission investments by real options analysis," Energy Policy, Elsevier, vol. 67(C), pages 272-280.
    10. Juan Rosellón, Ingo Vogelsang, and Hannes Weigt, 2012. "Long-run Cost Functions for Electricity Transmission," The Energy Journal, International Association for Energy Economics, vol. 0(Number 1).
    11. Atkinson, Travis R. & Preckel, Paul V. & Gotham, Douglas, 2021. "Long-term investment planning for the electricity sector in Small Island Developing States: Case study for Jamaica," Energy, Elsevier, vol. 228(C).
    12. Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
    13. Zhang, Wei-qi & Zhang, Xin-yan & Huang, Shao-wei & Xia, Yu-kai & Fan, Xiao-chao & Mei, Sheng-wei, 2017. "Evolution of a transmission network with high proportion of renewable energy in the future," Renewable Energy, Elsevier, vol. 102(PB), pages 372-379.
    14. Catherine De La Robertie & Semyon Danilov, 2015. "Methods of Investment Management in the Russian Electricity Transmission Industry," International Journal of Economics & Business Administration (IJEBA), International Journal of Economics & Business Administration (IJEBA), vol. 0(1), pages 21-37.
    15. Yuwono, Bintang & Yowargana, Ping & Kranzl, Lukas & Haas, Reinhard & Dewi, Retno Gumilang & Siagian, Ucok Welo Risma & Kraxner, Florian, 2023. "Incorporating grid expansion in an energy system optimisation model - A case study for Indonesia," OSF Preprints aw4bd, Center for Open Science.
    16. Odeh, Rodrigo Pérez & Watts, David, 2019. "Impacts of wind and solar spatial diversification on its market value: A case study of the Chilean electricity market," Renewable and Sustainable Energy Reviews, Elsevier, vol. 111(C), pages 442-461.
    17. Wook-Won Kim & Jong-Keun Park & Yong-Tae Yoon & Mun-Kyeom Kim, 2018. "Transmission Expansion Planning under Uncertainty for Investment Options with Various Lead-Times," Energies, MDPI, vol. 11(9), pages 1-19, September.
    18. Chao, Hung-po & Wilson, Robert, 2020. "Coordination of electricity transmission and generation investments," Energy Economics, Elsevier, vol. 86(C).
    19. Ali Dalabeeh & Eng.Hani Hasan Al-Hajbi, 2014. "Reliability Worth Assessment in Composite Power System Planning and Operation," Modern Applied Science, Canadian Center of Science and Education, vol. 8(5), pages 1-45, October.
    20. Krupa, Joel, 2013. "Realizing truly sustainable development: A proposal to expand Aboriginal ‘price adders’ beyond Ontario electricity generation projects," Utilities Policy, Elsevier, vol. 26(C), pages 85-87.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:energy:v:51:y:2013:i:c:p:330-338. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/energy .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.