Contribution of re-regulation reservoirs considering pumping capability to environmentally friendly hydropower operation
Author
Abstract
Suggested Citation
DOI: 10.1016/j.energy.2012.06.071
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Pérez-Díaz, Juan I. & Wilhelmi, José R., 2010. "Assessment of the economic impact of environmental constraints on short-term hydropower plant operation," Energy Policy, Elsevier, vol. 38(12), pages 7960-7970, December.
- Matthew J. Kotchen & Michael R. Moore & Frank Lupi & Edward S. Rutherford, 2006. "Environmental Constraints on Hydropower: An Ex Post Benefit-Cost Analysis of Dam Relicensing in Michigan," Land Economics, University of Wisconsin Press, vol. 82(3), pages 384-403.
- Catalão, J.P.S. & Pousinho, H.M.I. & Mendes, V.M.F., 2011. "Hydro energy systems management in Portugal: Profit-based evaluation of a mixed-integer nonlinear approach," Energy, Elsevier, vol. 36(1), pages 500-507.
- David A. Harpman, 1999. "Assessing the Short-Run Economic Cost of Environmental Constraints on Hydropower Operations at Glen Canyon Dam," Land Economics, University of Wisconsin Press, vol. 75(3), pages 390-401.
- Niu, Shilei & Insley, Margaret, 2013.
"On the economics of ramping rate restrictions at hydro power plants: Balancing profitability and environmental costs,"
Energy Economics, Elsevier, vol. 39(C), pages 39-52.
- Shilei Niu & Margaret Insley, 2010. "On the Economics of Ramping Rate Restrictions at Hydro Power Plants: Balancing Profitability and Environmental Costs," Working Papers 1017, University of Waterloo, Department of Economics, revised Dec 2010.
- Nazari, M.E. & Ardehali, M.M. & Jafari, S., 2010. "Pumped-storage unit commitment with considerations for energy demand, economics, and environmental constraints," Energy, Elsevier, vol. 35(10), pages 4092-4101.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hickman, William & Muzhikyan, Aramazd & Farid, Amro M., 2017. "The synergistic role of renewable energy integration into the unit commitment of the energy water nexus," Renewable Energy, Elsevier, vol. 108(C), pages 220-229.
- Zheng, J.H. & Chen, J.J. & Wu, Q.H. & Jing, Z.X., 2015. "Reliability constrained unit commitment with combined hydro and thermal generation embedded using self-learning group search optimizer," Energy, Elsevier, vol. 81(C), pages 245-254.
- Guisández, Ignacio & Pérez-Díaz, Juan I. & Wilhelmi, José R., 2013. "Assessment of the economic impact of environmental constraints on annual hydropower plant operation," Energy Policy, Elsevier, vol. 61(C), pages 1332-1343.
- Santhosh, Apoorva & Farid, Amro M. & Youcef-Toumi, Kamal, 2014. "The impact of storage facility capacity and ramping capabilities on the supply side economic dispatch of the energy–water nexus," Energy, Elsevier, vol. 66(C), pages 363-377.
- Sichilalu, Sam & Wamalwa, Fhazhil & Akinlabi, Esther T., 2019. "Optimal control of wind-hydrokinetic pumpback hydropower plant constrained with ecological water flows," Renewable Energy, Elsevier, vol. 138(C), pages 54-69.
- Cebulla, F. & Fichter, T., 2017. "Merit order or unit-commitment: How does thermal power plant modeling affect storage demand in energy system models?," Renewable Energy, Elsevier, vol. 105(C), pages 117-132.
- Ak, Mümtaz & Kentel, Elcin & Savasaneril, Secil, 2019. "Quantifying the revenue gain of operating a cascade hydropower plant system as a pumped-storage hydropower system," Renewable Energy, Elsevier, vol. 139(C), pages 739-752.
- Haas, J. & Cebulla, F. & Cao, K. & Nowak, W. & Palma-Behnke, R. & Rahmann, C. & Mancarella, P., 2017. "Challenges and trends of energy storage expansion planning for flexibility provision in low-carbon power systems – a review," Renewable and Sustainable Energy Reviews, Elsevier, vol. 80(C), pages 603-619.
- Soroudi, Alireza, 2013. "Robust optimization based self scheduling of hydro-thermal Genco in smart grids," Energy, Elsevier, vol. 61(C), pages 262-271.
- Feng, Zhong-kai & Niu, Wen-jing & Cheng, Chun-tian & Liao, Sheng-li, 2017. "Hydropower system operation optimization by discrete differential dynamic programming based on orthogonal experiment design," Energy, Elsevier, vol. 126(C), pages 720-732.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sichilalu, Sam & Wamalwa, Fhazhil & Akinlabi, Esther T., 2019. "Optimal control of wind-hydrokinetic pumpback hydropower plant constrained with ecological water flows," Renewable Energy, Elsevier, vol. 138(C), pages 54-69.
- Guisández, Ignacio & Pérez-Díaz, Juan I. & Wilhelmi, José R., 2013. "Assessment of the economic impact of environmental constraints on annual hydropower plant operation," Energy Policy, Elsevier, vol. 61(C), pages 1332-1343.
- Rayamajhee, Veeshan & Joshi, Aakrit, 2018. "Economic trade-offs between hydroelectricity production and environmental externalities: A case for local externality mitigation fund," Renewable Energy, Elsevier, vol. 129(PA), pages 237-244.
- Kern, Jordan D. & Characklis, Gregory W., 2017. "Low natural gas prices and the financial cost of ramp rate restrictions at hydroelectric dams," Energy Economics, Elsevier, vol. 61(C), pages 340-350.
- Glotić, Arnel & Glotić, Adnan & Kitak, Peter & Pihler, Jože & Tičar, Igor, 2014. "Optimization of hydro energy storage plants by using differential evolution algorithm," Energy, Elsevier, vol. 77(C), pages 97-107.
- Santhosh, Apoorva & Farid, Amro M. & Youcef-Toumi, Kamal, 2014. "The impact of storage facility capacity and ramping capabilities on the supply side economic dispatch of the energy–water nexus," Energy, Elsevier, vol. 66(C), pages 363-377.
- Hickman, William & Muzhikyan, Aramazd & Farid, Amro M., 2017. "The synergistic role of renewable energy integration into the unit commitment of the energy water nexus," Renewable Energy, Elsevier, vol. 108(C), pages 220-229.
- Wang, Yongqiang & Zhou, Jianzhong & Mo, Li & Zhang, Rui & Zhang, Yongchuan, 2012. "Short-term hydrothermal generation scheduling using differential real-coded quantum-inspired evolutionary algorithm," Energy, Elsevier, vol. 44(1), pages 657-671.
- Petras Punys & Antanas Dumbrauskas & Egidijus Kasiulis & Gitana Vyčienė & Linas Šilinis, 2015. "Flow Regime Changes: From Impounding a Temperate Lowland River to Small Hydropower Operations," Energies, MDPI, vol. 8(7), pages 1-24, July.
- Catalão, J.P.S. & Pousinho, H.M.I. & Contreras, J., 2012. "Optimal hydro scheduling and offering strategies considering price uncertainty and risk management," Energy, Elsevier, vol. 37(1), pages 237-244.
- Guisández, Ignacio & Pérez-Díaz, Juan I. & Wilhelmi, José R., 2016. "Approximate formulae for the assessment of the long-term economic impact of environmental constraints on hydropeaking," Energy, Elsevier, vol. 112(C), pages 629-641.
- Niu, Shilei & Insley, Margaret, 2013.
"On the economics of ramping rate restrictions at hydro power plants: Balancing profitability and environmental costs,"
Energy Economics, Elsevier, vol. 39(C), pages 39-52.
- Shilei Niu & Margaret Insley, 2010. "On the Economics of Ramping Rate Restrictions at Hydro Power Plants: Balancing Profitability and Environmental Costs," Working Papers 1017, University of Waterloo, Department of Economics, revised Dec 2010.
- Pérez-Díaz, Juan I. & Wilhelmi, José R., 2010. "Assessment of the economic impact of environmental constraints on short-term hydropower plant operation," Energy Policy, Elsevier, vol. 38(12), pages 7960-7970, December.
- Ardizzon, G. & Cavazzini, G. & Pavesi, G., 2014. "A new generation of small hydro and pumped-hydro power plants: Advances and future challenges," Renewable and Sustainable Energy Reviews, Elsevier, vol. 31(C), pages 746-761.
- Ak, Mumtaz & Kentel, Elcin & Savasaneril, Secil, 2017. "Operating policies for energy generation and revenue management in single-reservoir hydropower systems," Renewable and Sustainable Energy Reviews, Elsevier, vol. 78(C), pages 1253-1261.
- Guilfoos, Todd & Walsh, Jason, 2023. "A hedonic study of New England dam removals," Ecological Economics, Elsevier, vol. 203(C).
- Graff Zivin, Joshua S. & Kotchen, Matthew J. & Mansur, Erin T., 2014.
"Spatial and temporal heterogeneity of marginal emissions: Implications for electric cars and other electricity-shifting policies,"
Journal of Economic Behavior & Organization, Elsevier, vol. 107(PA), pages 248-268.
- Joshua S. Graff Zivin & Matthew Kotchen & Erin T. Mansur, 2012. "Spatial and Temporal Heterogeneity of Marginal Emissions: Implications for Electric Cars and Other Electricity-Shifting Policies," NBER Working Papers 18462, National Bureau of Economic Research, Inc.
- Yu, Bing & Xu, Linyu, 2016. "Review of ecological compensation in hydropower development," Renewable and Sustainable Energy Reviews, Elsevier, vol. 55(C), pages 729-738.
- Sheila M. Olmstead & Hilary Sigman, 2015.
"Damming the Commons: An Empirical Analysis of International Cooperation and Conflict in Dam Location,"
Journal of the Association of Environmental and Resource Economists, University of Chicago Press, vol. 2(4), pages 497-526.
- Olmstead, Sheila M. & Sigman, Hilary, 2014. "Damming the Commons: An Empirical Analysis of International Cooperation and Conflict in Dam Location," RFF Working Paper Series dp-14-23-rev, Resources for the Future.
- Olmstead, Sheila M. & Sigman, Hilary, 2014. "Damming the Commons: An Empirical Analysis of International Cooperation and Conflict in Dam Location," RFF Working Paper Series dp-14-23, Resources for the Future.
- Sheila M. Olmstead & Hilary Sigman, 2014. "Damming the Commons: An Empirical Analysis of International Cooperation and Conflict in Dam Location," NBER Working Papers 20389, National Bureau of Economic Research, Inc.
- Olmstead, Sheila M. & Sigman, Hilary, 2014. "Damming the commons : an empirical analysis of international cooperation and conflict in dam location," Policy Research Working Paper Series 6992, The World Bank.
- Pejman Bahramian, 2021.
"Integration of wind power into an electricity system using pumped-storage: Economic challenges and stakeholder impacts,"
Working Paper
1480, Economics Department, Queen's University.
- Pejman Bahramian & Glenn P. Jenkins & Frank Milne, 2023. "Integration Of Wind Power into An Electricity System Using Pumped Storage: Economic Challenges and Stakeholder Impacts," Development Discussion Papers 2023-07, JDI Executive Programs.
- Pejman Bahramian, 2021. "Integration of wind power into an electricity system using pumped-storage: Economic challenges and stakeholder impacts," Working Paper 1478, Economics Department, Queen's University.
More about this item
Keywords
Hydropower operation; Environmental constraints; Re-regulation reservoir; Pumped storage; Optimization; Assessment methodology;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:energy:v:48:y:2012:i:1:p:144-152. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/energy .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.