Evaluating replacement project of nuclear power plants under uncertainty

Author

Listed:
  • Naito, Yuta
  • Takashima, Ryuta
  • Kimura, Hiroshi
  • Madarame, Haruki

Abstract

This paper investigates the valuation of a replacement project of nuclear power plants under the deregulated electricity market. The replacement project consists of two components: the decision to decommission an existing plant and the decision to construct a new plant. In the replacement project, the decommissioning decision should be made considering not only the profitability of the existing plant but also the profitability and costs of the construction of the new plant. Real options theory is used to determine the optimal timing of the decommissioning and construction. In order to examine the effect of decommissioning time and decision making one, we consider a time-lag for these decision making times. We show the dependence of the replacement project value on uncertainty and time-lag.

Suggested Citation

  • Naito, Yuta & Takashima, Ryuta & Kimura, Hiroshi & Madarame, Haruki, 2010. "Evaluating replacement project of nuclear power plants under uncertainty," Energy Policy, Elsevier, vol. 38(3), pages 1321-1329, March.
  • Handle: RePEc:eee:enepol:v:38:y:2010:i:3:p:1321-1329
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0301-4215(09)00838-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Siddiqui, Afzal S. & Maribu, Karl, 2009. "Investment and upgrade in distributed generation under uncertainty," Energy Economics, Elsevier, vol. 31(1), pages 25-37, January.
    2. Markus Burger & Bernhard Klar & Alfred Muller & Gero Schindlmayr, 2004. "A spot market model for pricing derivatives in electricity markets," Quantitative Finance, Taylor & Francis Journals, vol. 4(1), pages 109-122.
    3. Pindyck, Robert S., 1993. "Investments of uncertain cost," Journal of Financial Economics, Elsevier, vol. 34(1), pages 53-76, August.
    4. Bar-Ilan, Avner & Strange, William C, 1996. "Investment Lags," American Economic Review, American Economic Association, vol. 86(3), pages 610-622, June.
    5. Eduardo S. Schwartz, 1998. "Valuing Long-Term Commodity Assets," Financial Management, Financial Management Association, vol. 27(1), Spring.
    6. Matt Thompson & Matt Davison & Henning Rasmussen, 2004. "Valuation and Optimal Operation of Electric Power Plants in Competitive Markets," Operations Research, INFORMS, vol. 52(4), pages 546-562, August.
    7. Schwartz, Eduardo, 1998. "Valuing long-term commodity assets," Journal of Energy Finance & Development, Elsevier, vol. 3(2), pages 85-99.
    8. Gollier, Christian & Proult, David & Thais, Francoise & Walgenwitz, Gilles, 2005. "Choice of nuclear power investments under price uncertainty: Valuing modularity," Energy Economics, Elsevier, vol. 27(4), pages 667-685, July.
    9. Erkka Näsäkkälä & Stein‐Erik Fleten, 2005. "Flexibility and technology choice in gas fired power plant investments," Review of Financial Economics, John Wiley & Sons, vol. 14(3-4), pages 371-393.
    10. Felipe L. Aguerrevere, 2003. "Equilibrium Investment Strategies and Output Price Behavior: A Real-Options Approach," The Review of Financial Studies, Society for Financial Studies, vol. 16(4), pages 1239-1272.
    11. Weron, Rafal, 2000. "Energy price risk management," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 285(1), pages 127-134.
    12. Chung-Li Tseng & Graydon Barz, 2002. "Short-Term Generation Asset Valuation: A Real Options Approach," Operations Research, INFORMS, vol. 50(2), pages 297-310, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tian, Lixin & Pan, Jianglai & Du, Ruijin & Li, Wenchao & Zhen, Zaili & Qibing, Gao, 2017. "The valuation of photovoltaic power generation under carbon market linkage based on real options," Applied Energy, Elsevier, vol. 201(C), pages 354-362.
    2. Guo, Jian-Xin & Zhu, Kaiwei, 2021. "Implications for enterprise to adopt cleaner technology: From the perspective of energy market and commodity market," Research in International Business and Finance, Elsevier, vol. 57(C).
    3. Jain, Shashi & Roelofs, Ferry & Oosterlee, Cornelis W., 2014. "Decision-support tool for assessing future nuclear reactor generation portfolios," Energy Economics, Elsevier, vol. 44(C), pages 99-112.
    4. Felipe Isaza Cuervo & Sergio Botero Boterob, 2014. "Aplicación de las opciones reales en la toma de decisiones en los mercados de electricidad," Estudios Gerenciales, Universidad Icesi, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Joachim Gahungu and Yves Smeers, 2012. "A Real Options Model for Electricity Capacity Expansion," RSCAS Working Papers 2012/08, European University Institute.
    2. Takashima, Ryuta & Goto, Makoto & Kimura, Hiroshi & Madarame, Haruki, 2008. "Entry into the electricity market: Uncertainty, competition, and mothballing options," Energy Economics, Elsevier, vol. 30(4), pages 1809-1830, July.
    3. Nemat Safarov & Colin Atkinson, 2017. "Natural Gas-Fired Power Plants Valuation And Optimization Under Lévy Copulas And Regime Switching," International Journal of Theoretical and Applied Finance (IJTAF), World Scientific Publishing Co. Pte. Ltd., vol. 20(01), pages 1-38, February.
    4. Nemat Safarov & Colin Atkinson, 2016. "Natural gas-fired power plants valuation and optimisation under Levy copulas and regime-switching," Papers 1607.01207, arXiv.org, revised Jul 2016.
    5. GAHUNGU, Joachim & SMEERS, Yves, 2011. "A real options model for electricity capacity expansion," LIDAM Discussion Papers CORE 2011044, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    6. Siddiqui, Afzal & Fleten, Stein-Erik, 2010. "How to proceed with competing alternative energy technologies: A real options analysis," Energy Economics, Elsevier, vol. 32(4), pages 817-830, July.
    7. Zhu, Lei & Fan, Ying, 2011. "A real options–based CCS investment evaluation model: Case study of China’s power generation sector," Applied Energy, Elsevier, vol. 88(12), pages 4320-4333.
    8. Fabien A. Roques & William J. Nuttall & David M. Newbery & Richard de Neufville & Stephen Connors, 2006. "Nuclear Power: A Hedge against Uncertain Gas and Carbon Prices?," The Energy Journal, , vol. 27(4), pages 1-24, October.
    9. Ernstsen, Rune Ramsdal & Boomsma, Trine Krogh, 2018. "Valuation of power plants," European Journal of Operational Research, Elsevier, vol. 266(3), pages 1153-1174.
    10. Schachter, J.A. & Mancarella, P., 2016. "A critical review of Real Options thinking for valuing investment flexibility in Smart Grids and low carbon energy systems," Renewable and Sustainable Energy Reviews, Elsevier, vol. 56(C), pages 261-271.
    11. Siddiqui, Afzal & Takashima, Ryuta, 2012. "Capacity switching options under rivalry and uncertainty," European Journal of Operational Research, Elsevier, vol. 222(3), pages 583-595.
    12. Won, Chaehwan, 2009. "Valuation of investments in natural resources using contingent-claim framework with application to bituminous coal developments in Korea," Energy, Elsevier, vol. 34(9), pages 1215-1224.
    13. Westner, Günther & Madlener, Reinhard, 2012. "Investment in new power generation under uncertainty: Benefits of CHP vs. condensing plants in a copula-based analysis," Energy Economics, Elsevier, vol. 34(1), pages 31-44.
    14. Jyh-Bang Jou & Tan (Charlene) Lee, 2011. "Mutually exclusive investment with technical uncertainty," Applied Economics, Taylor & Francis Journals, vol. 43(30), pages 4723-4728.
    15. Aïd, René & Federico, Salvatore & Pham, Huyên & Villeneuve, Bertrand, 2015. "Explicit investment rules with time-to-build and uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 51(C), pages 240-256.
    16. Sarkar, Sudipto & Zhang, Chuanqian, 2013. "Implementation lag and the investment decision," Economics Letters, Elsevier, vol. 119(2), pages 136-140.
    17. Luis M. Abadie & José M. Chamorro, 2009. "Monte Carlo valuation of natural gas investments," Review of Financial Economics, John Wiley & Sons, vol. 18(1), pages 10-22, January.
    18. Bøckman, Thor & Fleten, Stein-Erik & Juliussen, Erik & Langhammer, Håvard J. & Revdal, Ingemar, 2008. "Investment timing and optimal capacity choice for small hydropower projects," European Journal of Operational Research, Elsevier, vol. 190(1), pages 255-267, October.
    19. Lee, Shun-Chung & Shih, Li-Hsing, 2010. "Renewable energy policy evaluation using real option model -- The case of Taiwan," Energy Economics, Elsevier, vol. 32(Supplemen), pages 67-78, September.
    20. Insley, M.C. & Wirjanto, T.S., 2010. "Contrasting two approaches in real options valuation: Contingent claims versus dynamic programming," Journal of Forest Economics, Elsevier, vol. 16(2), pages 157-176, April.

    More about this item

    Keywords

    Replacement Time lag Real options;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:enepol:v:38:y:2010:i:3:p:1321-1329. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/enpol .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.