Implementation lag and the investment decision
Author
Abstract
Suggested Citation
DOI: 10.1016/j.econlet.2013.02.018
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Alvarez, Luis H. R. & Keppo, Jussi, 2002. "The impact of delivery lags on irreversible investment under uncertainty," European Journal of Operational Research, Elsevier, vol. 136(1), pages 173-180, January.
- Majd, Saman & Pindyck, Robert S., 1987.
"Time to build, option value, and investment decisions,"
Journal of Financial Economics, Elsevier, vol. 18(1), pages 7-27, March.
- Saman Majd & Robert S. Pindyck, 1985. "Time to Build, Option Value, and Investment Decisions," NBER Working Papers 1654, National Bureau of Economic Research, Inc.
- Bar-Ilan, Avner & Strange, William C, 1996. "Investment Lags," American Economic Review, American Economic Association, vol. 86(3), pages 610-622, June.
- Felipe L. Aguerrevere, 2003. "Equilibrium Investment Strategies and Output Price Behavior: A Real-Options Approach," The Review of Financial Studies, Society for Financial Studies, vol. 16(4), pages 1239-1272.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Sarkar, Sudipto & Zhang, Chuanqian, 2015. "Investment policy with time-to-build," Journal of Banking & Finance, Elsevier, vol. 55(C), pages 142-156.
- Wacker, Konstantin M., 2013. "On the measurement of foreign direct investment and its relationship to activities of multinational corporations," Working Paper Series 1614, European Central Bank.
- Armerin, Fredrik & Song, Han-Suck, 2020. "A framework for modelling cash flow lags," Working Paper Series 20/17, Royal Institute of Technology, Department of Real Estate and Construction Management & Banking and Finance.
- Thijssen, Jacco J.J., 2022. "Optimal investment and abandonment decisions for projects with construction uncertainty," European Journal of Operational Research, Elsevier, vol. 298(1), pages 368-379.
- Leon A. Petrosyan & David W.K. Yeung, 2020. "Cooperative Dynamic Games with Durable Controls: Theory and Application," Dynamic Games and Applications, Springer, vol. 10(4), pages 872-896, December.
- Thijssen, Jacco J.J., 2015. "A model for irreversible investment with construction and revenue uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 57(C), pages 250-266.
- Fredrik Armerin & Han-Suck Song, 2021. "A framework for modelling cash flow lags," SN Business & Economics, Springer, vol. 1(10), pages 1-13, October.
- Delaney, Laura, 2022. "The impact of operational delay on irreversible investment under Knightian uncertainty," Economics Letters, Elsevier, vol. 215(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Fredrik Armerin & Han-Suck Song, 2021. "A framework for modelling cash flow lags," SN Business & Economics, Springer, vol. 1(10), pages 1-13, October.
- Luis M. Abadie & José M. Chamorro, 2009.
"Monte Carlo valuation of natural gas investments,"
Review of Financial Economics, John Wiley & Sons, vol. 18(1), pages 10-22, January.
- Abadie, Luis M. & Chamorro, José M., 2009. "Monte Carlo valuation of natural gas investments," Review of Financial Economics, Elsevier, vol. 18(1), pages 10-22, January.
- Abadie, Luis María & Chamorro Gómez, José Manuel, 2006. "Monte Carlo Valuation of natural gas investments," IKERLANAK 6484, Universidad del País Vasco - Departamento de Fundamentos del Análisis Económico I.
- Madlener, Reinhard & Kumbaroglu, Gurkan & Ediger, Volkan S., 2005.
"Modeling technology adoption as an irreversible investment under uncertainty: the case of the Turkish electricity supply industry,"
Energy Economics, Elsevier, vol. 27(1), pages 139-163, January.
- Reinhard Madlener & Gürkan Kumbaroglu & Volkan S. Ediger, 2004. "Modeling Technology Adoption as an Irreversible Investment Under Uncertainty: The Case of the Turkish Electricity Supply Industry," CEPE Working paper series 04-30, CEPE Center for Energy Policy and Economics, ETH Zurich.
- Lei Zhu & ZhongXiang Zhang & Ying Fan, 2011.
"An evaluation of overseas oil investment projects under uncertainty using a real options based simulation model,"
Economics Study Area Working Papers
121, East-West Center, Economics Study Area.
- Zhu, Lei & Zhang, ZhongXiang & Fan, Ying, 2011. "An Evaluation of Overseas Oil Investment Projects under Uncertainty Using a Real Options Based Simulation Model," Climate Change and Sustainable Development 119106, Fondazione Eni Enrico Mattei (FEEM).
- Lei Zhu & ZhongXiang Zhang & Ying Fan, 2011. "An Evaluation of Overseas Oil Investment Projects under Uncertainty Using a Real Options Based Simulation Model," Working Papers 2011.83, Fondazione Eni Enrico Mattei.
- Jeon, Haejun, 2021. "Investment and financing decisions in the presence of time-to-build," European Journal of Operational Research, Elsevier, vol. 288(3), pages 1068-1084.
- Marc Fréchet & Hassen Raîs, 2015. "Les managers raisonnent-ils par options réelles ? Une étude exploratoire des déterminants," Post-Print hal-01764120, HAL.
- Thijssen, Jacco J.J., 2015. "A model for irreversible investment with construction and revenue uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 57(C), pages 250-266.
- Thijssen, Jacco J.J., 2022. "Optimal investment and abandonment decisions for projects with construction uncertainty," European Journal of Operational Research, Elsevier, vol. 298(1), pages 368-379.
- Jeon, Haejun, 2021. "Investment timing and capacity decisions with time-to-build in a duopoly market," Journal of Economic Dynamics and Control, Elsevier, vol. 122(C).
- Kim, Ki Hong & Hwang, Seong Tae & Oh, Hyung Sik & Lee, Deok Joo, 2008. "The impact of investment lags on investment decision," European Journal of Operational Research, Elsevier, vol. 190(3), pages 696-707, November.
- MacDougall, Shelley L. & Pike, Richard H., 2003. "Consider your options: changes to strategic value during implementation of advanced manufacturing technology," Omega, Elsevier, vol. 31(1), pages 1-15, February.
- Jukka Lempa, 2020. "Some results on optimal stopping under phase-type distributed implementation delay," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 91(3), pages 559-583, June.
- Zhu, Lei & Fan, Ying, 2011. "A real options–based CCS investment evaluation model: Case study of China’s power generation sector," Applied Energy, Elsevier, vol. 88(12), pages 4320-4333.
- Agliardi, Elettra & Koussis, Nicos, 2013. "Optimal capital structure and the impact of time-to-build," Finance Research Letters, Elsevier, vol. 10(3), pages 124-130.
- Bar-Ilan, Avner & Strange, William C., 1998. "A model of sequential investment," Journal of Economic Dynamics and Control, Elsevier, vol. 22(3), pages 437-463, March.
- Jyh-Bang Jou & Tan (Charlene) Lee, 2011. "Mutually exclusive investment with technical uncertainty," Applied Economics, Taylor & Francis Journals, vol. 43(30), pages 4723-4728.
- Aïd, René & Federico, Salvatore & Pham, Huyên & Villeneuve, Bertrand, 2015.
"Explicit investment rules with time-to-build and uncertainty,"
Journal of Economic Dynamics and Control, Elsevier, vol. 51(C), pages 240-256.
- René Aïd & Salvatore Federico & Huyen Pham & Bertrand Villeneuve, 2014. "Explicit investment rules with time-to-build and uncertainty," Working Papers hal-00997994, HAL.
- Ren'e Aid & Salvatore Federico & Huy^en Pham & Bertrand Villeneuve, 2014. "Explicit investment rules with time-to-build and uncertainty," Papers 1406.0055, arXiv.org.
- Lim, Terence & Lo, Andrew W. & Merton, Robert C. & Scholes, Myron S., 2006. "The Derivatives Sourcebook," Foundations and Trends(R) in Finance, now publishers, vol. 1(5–6), pages 365-572, April.
- Haehl, Christian & Spinler, Stefan, 2018. "Capacity expansion under regulatory uncertainty:A real options-based study in international container shipping," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 113(C), pages 75-93.
- Rena Sivitanidou, 1999. "Does the Theory of Irreversible Investments Help Explain Movements in Office-Commerical Construction?," Working Paper 8659, USC Lusk Center for Real Estate.
More about this item
Keywords
Investment trigger; Real option; Investment lag; Reversibility;All these keywords.
JEL classification:
- G3 - Financial Economics - - Corporate Finance and Governance
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ecolet:v:119:y:2013:i:2:p:136-140. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ecolet .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.