Tool allocation and machining conditions optimization for CNC machines
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Kathryn E. Stecke, 1983. "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 29(3), pages 273-288, March.
- Ann E. Gray & Abraham Seidmann & Kathryn E. Stecke, 1993. "A Synthesis of Decision Models for Tool Management in Automated Manufacturing," Management Science, INFORMS, vol. 39(5), pages 549-567, May.
- Kouvelis, Panagiotis, 1991. "An optimal tool selection procedure for the initial design phase of a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 55(2), pages 201-210, November.
- Christopher S. Tang & Eric V. Denardo, 1988. "Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches," Operations Research, INFORMS, vol. 36(5), pages 767-777, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Gurel, Sinan & Akturk, M. Selim, 2007. "Considering manufacturing cost and scheduling performance on a CNC turning machine," European Journal of Operational Research, Elsevier, vol. 177(1), pages 325-343, February.
- Ramli, Rizauddin & Yamamoto, Hidehiko & Qudeiri, Jaber Abu, 2009. "Tool path of lathe machine in flexible transfer lines by using genetic algorithms," International Journal of Production Economics, Elsevier, vol. 121(1), pages 72-80, September.
- Kayan, Rabia K. & Akturk, M. Selim, 2005. "A new bounding mechanism for the CNC machine scheduling problems with controllable processing times," European Journal of Operational Research, Elsevier, vol. 167(3), pages 624-643, December.
- Akturk, M. Selim & Ghosh, Jay B. & Gunes, Evrim D., 2004. "Scheduling with tool changes to minimize total completion time: Basic results and SPT performance," European Journal of Operational Research, Elsevier, vol. 157(3), pages 784-790, September.
- M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
- Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
- Sodhi, Manbir S. & Lamond, Bernard F. & Gautier, Antoine & Noel, Martin, 2001. "Heuristics for determining economic processing rates in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(1), pages 105-115, February.
- Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
- Beezão, Andreza Cristina & Cordeau, Jean-François & Laporte, Gilbert & Yanasse, Horacio Hideki, 2017. "Scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 257(3), pages 834-844.
- Akturk, M. Selim & Ghosh, Jay B. & Gunes, Evrim D., 2004. "Scheduling with tool changes to minimize total completion time: Basic results and SPT performance," European Journal of Operational Research, Elsevier, vol. 157(3), pages 784-790, September.
- Furrer, Martina & Mütze, Torsten, 2017. "An algorithmic framework for tool switching problems with multiple objectives," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1003-1016.
- Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
- Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
- Konak, Abdullah & Kulturel-Konak, Sadan & Azizoglu, Meral, 2008. "Minimizing the number of tool switching instants in Flexible Manufacturing Systems," International Journal of Production Economics, Elsevier, vol. 116(2), pages 298-307, December.
- Mohamed, Zubair M., 1995. "Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 87(2), pages 289-298, December.
- Raduly-Baka, Csaba & Nevalainen, Olli S., 2015. "The modular tool switching problem," European Journal of Operational Research, Elsevier, vol. 242(1), pages 100-106.
- Renato de Matta & Vernon Ning Hsu & Timothy J. Lowe, 1999. "Capacitated selection problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 19-37, February.
- Gaalman, G. J. C. & Nawijn, W. M., 1996. "Tool sharing in parallel part production," International Journal of Production Economics, Elsevier, vol. 46(1), pages 521-533, December.
- Christopher S. Tang, 2017. "OM Forum—Three Simple Approaches for Young Scholars to Identify Relevant and Novel Research Topics in Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 19(3), pages 338-346, July.
- Nagraj Balakrishnan & Amiya K. Chakravarty, 2001. "Opportunistic retooling of a flexible machine subject to failure," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(1), pages 79-97, February.
- Chakravarty, Amiya K. & Balakrishnan, Nagraj, 1995. "Impact of job-sequence on the down-time of a deteriorating flexible machine," European Journal of Operational Research, Elsevier, vol. 87(2), pages 299-315, December.
- Crama, Yves & Moonen, Linda S. & Spieksma, Frits C.R. & Talloen, Ellen, 2007. "The tool switching problem revisited," European Journal of Operational Research, Elsevier, vol. 182(2), pages 952-957, October.
- Mohamed, Zubair M. & Bernardo, John J., 1997. "Tool planning models for flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 103(3), pages 497-514, December.
- Yves Crama & Joris van de Klundert, 1999. "Worst‐case performance of approximation algorithms for tool management problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 445-462, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:94:y:1996:i:2:p:335-348. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.