Tool planning models for flexible manufacturing systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Sawik, Tadeusz, 1990. "Modelling and scheduling of a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 45(2-3), pages 177-190, April.
- Kathryn E. Stecke, 1983. "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 29(3), pages 273-288, March.
- Ann E. Gray & Abraham Seidmann & Kathryn E. Stecke, 1993. "A Synthesis of Decision Models for Tool Management in Automated Manufacturing," Management Science, INFORMS, vol. 39(5), pages 549-567, May.
- Panagiotis Kouvelis & Hau L. Lee, 1991. "Block Angular Structures and the Loading Problem in Flexible Manufacturing Systems," Operations Research, INFORMS, vol. 39(4), pages 666-676, August.
- Bernardo, John J. & Mohamed, Zubair, 1992. "The measurement and use of operational flexibility in the loading of Flexible Manufacturing Systems," European Journal of Operational Research, Elsevier, vol. 60(2), pages 144-155, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Beezão, Andreza Cristina & Cordeau, Jean-François & Laporte, Gilbert & Yanasse, Horacio Hideki, 2017. "Scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 257(3), pages 834-844.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Mohamed, Zubair M., 1995. "Ramifications of tool magazine size on the makespan and routing flexibility of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 87(2), pages 289-298, December.
- Mohamed, Zubair M., 1996. "A flexible approach to (re)configure Flexible Manufacturing Cells," European Journal of Operational Research, Elsevier, vol. 95(3), pages 566-576, December.
- Mohamed, Zubair M. & Kumar, Ashok & Motwani, Jaideep, 1999. "An improved part grouping model for minimizing makespan in FMS," European Journal of Operational Research, Elsevier, vol. 116(1), pages 171-182, July.
- Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
- Kumar, Akhilesh & Prakash & Tiwari, M.K. & Shankar, Ravi & Baveja, Alok, 2006. "Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1043-1069, December.
- M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
- Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
- Sodhi, Manbir S. & Lamond, Bernard F. & Gautier, Antoine & Noel, Martin, 2001. "Heuristics for determining economic processing rates in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(1), pages 105-115, February.
- Liu, Jiyin & MacCarthy, B. L., 1997. "A global MILP model for FMS scheduling," European Journal of Operational Research, Elsevier, vol. 100(3), pages 441-453, August.
- Akturk, M. Selim & Avci, Selcuk, 1996. "Tool allocation and machining conditions optimization for CNC machines," European Journal of Operational Research, Elsevier, vol. 94(2), pages 335-348, October.
- Gaalman, G. J. C. & Nawijn, W. M., 1996. "Tool sharing in parallel part production," International Journal of Production Economics, Elsevier, vol. 46(1), pages 521-533, December.
- Beezão, Andreza Cristina & Cordeau, Jean-François & Laporte, Gilbert & Yanasse, Horacio Hideki, 2017. "Scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 257(3), pages 834-844.
- Meltem Denizel & S. Selcuk Erenguc & Hanif D. Sherali, 1996. "Convex envelope results and strong formulations for a class of mixed‐integer programs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(4), pages 503-518, June.
- Srivastava, Bharatendu & Chen, Wun-Hwa, 1996. "Batching in production planning for flexible manufacturing systems," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 127-137, June.
- Furrer, Martina & Mütze, Torsten, 2017. "An algorithmic framework for tool switching problems with multiple objectives," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1003-1016.
- Enrico Teich & Thorsten Claus, 2017. "Measurement of Load and Capacity Flexibility in Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 18(4), pages 291-302, December.
- Ghosh, Diptesh, 2016. "Exploring Lin Kernighan neighborhoods for the indexing problem," IIMA Working Papers WP2016-02-13, Indian Institute of Management Ahmedabad, Research and Publication Department.
- Patrick H. Liu, 2000. "A comparative study of three tool replacement/operation sequencing strategies in a flexible manufacturing system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(6), pages 479-499, September.
- Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
- Potts, C. N. & Whitehead, J. D., 2001. "Workload balancing and loop layout in the design of a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(2), pages 326-336, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:103:y:1997:i:3:p:497-514. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.