IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v81y1995i1p105-114.html
   My bibliography  Save this article

A two-phase model for planning the production of aluminum ingot

Author

Listed:
  • Bowers, M.R.
  • Kaplan, L.A.
  • Hooker, T.L.

Abstract

No abstract is available for this item.

Suggested Citation

  • Bowers, M.R. & Kaplan, L.A. & Hooker, T.L., 1995. "A two-phase model for planning the production of aluminum ingot," European Journal of Operational Research, Elsevier, vol. 81(1), pages 105-114, February.
  • Handle: RePEc:eee:ejores:v:81:y:1995:i:1:p:105-114
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(93)E0233-N
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. F. J. Vasko & F. E. Wolf & K. L. Stott, 1987. "Optimal Selection of Ingot Sizes Via Set Covering," Operations Research, INFORMS, vol. 35(3), pages 346-353, June.
    2. Gordon L. Baker & William A. Clark & Jonathan J. Frund & Richard E. Wendell, 1987. "Production Planning and Cost Analysis on a Microcomputer," Interfaces, INFORMS, vol. 17(4), pages 53-60, August.
    3. Narchal, R. M., 1988. "A simulation model for corporate planning in a steel plant," European Journal of Operational Research, Elsevier, vol. 34(3), pages 282-296, March.
    4. Friedrich Wilhelm Bielefeld & Klaus-Dieter Walter & Rolf Wartmann, 1986. "A Computer-Based Strategic Planning System for Steel Production," Interfaces, INFORMS, vol. 16(4), pages 41-46, August.
    5. J. P. Hernandez & J. M. Proth, 1982. "A Good Solution Instead of an Optimal One," Interfaces, INFORMS, vol. 12(2), pages 37-42, April.
    6. Mark A. Vonderembse & Robert W. Haessler, 1982. "A Mathematical Programming Approach to Schedule Master Slab Casters in the Steel Industry," Management Science, INFORMS, vol. 28(12), pages 1450-1461, December.
    7. Richard E. Box & Donald G. Herbe, 1988. "A Scheduling Model for LTV Steel's Cleveland Works' Twin Strand Continuous Slab Caster," Interfaces, INFORMS, vol. 18(1), pages 42-56, February.
    8. P. Hansen & J. Hugé, 1989. "Implicit Treatment of "Zero or Range" Constraints in a Model for Minimum Cost Foundry Alloys," Management Science, INFORMS, vol. 35(3), pages 367-371, March.
    9. Francis J. Vasko & Floyd E. Wolf & Kenneth L. Stott & James W. Scheirer, 1989. "Selecting Optimal Ingot Sizes for Bethlehem Steel," Interfaces, INFORMS, vol. 19(1), pages 68-84, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Goutam Dutta & Payal Apujani & Narain Gupta, 2016. "An Introduction to the Aluminium Industry and Survey of OR Applications in an Integrated Aluminium Plant," Working Papers id:11097, eSocialSciences.
    2. Apujani, Payal & Dutta, Goutam & Gupta, Narain, 2016. "An Introduction to the Aluminum Industry and Survey of OR Applications in an Integrated Aluminum Plant," IIMA Working Papers WP2016-03-50, Indian Institute of Management Ahmedabad, Research and Publication Department.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Goutam Dutta & Robert Fourer, 2001. "A Survey of Mathematical Programming Applications in Integrated Steel Plants," Manufacturing & Service Operations Management, INFORMS, vol. 3(4), pages 387-400.
    2. Brian Denton & Diwakar Gupta & Keith Jawahir, 2003. "Managing Increasing Product Variety at Integrated Steel Mills," Interfaces, INFORMS, vol. 33(2), pages 41-53, April.
    3. Ümit Sakallı & Ömer Baykoç & Burak Birgören, 2011. "Stochastic optimization for blending problem in brass casting industry," Annals of Operations Research, Springer, vol. 186(1), pages 141-157, June.
    4. Lixin Tang & Gongshu Wang & Zhi-Long Chen, 2014. "Integrated Charge Batching and Casting Width Selection at Baosteel," Operations Research, INFORMS, vol. 62(4), pages 772-787, August.
    5. M. Muntazir Mehdi & Le Wang & Sean P. Willems, 2022. "Developing a Maximum Inscribed Rectangle Heuristic to Satisfy Rush Orders for Heavy Plate Steel," Interfaces, INFORMS, vol. 52(3), pages 283-294, May.
    6. Federico Cosenz & Guido Noto, 2016. "Applying System Dynamics Modelling to Strategic Management: A Literature Review," Systems Research and Behavioral Science, Wiley Blackwell, vol. 33(6), pages 703-741, November.
    7. Azadeh, A. & Ghaderi, S.F. & Maghsoudi, A., 2008. "Location optimization of solar plants by an integrated hierarchical DEA PCA approach," Energy Policy, Elsevier, vol. 36(10), pages 3993-4004, October.
    8. Lixin Tang & Ying Meng & Zhi-Long Chen & Jiyin Liu, 2016. "Coil Batching to Improve Productivity and Energy Utilization in Steel Production," Manufacturing & Service Operations Management, INFORMS, vol. 18(2), pages 262-279, May.
    9. Herr, Oliver & Goel, Asvin, 2016. "Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints," European Journal of Operational Research, Elsevier, vol. 248(1), pages 123-135.
    10. Tang, Lixin & Liu, Jiyin & Rong, Aiying & Yang, Zihou, 2000. "A mathematical programming model for scheduling steelmaking-continuous casting production," European Journal of Operational Research, Elsevier, vol. 120(2), pages 423-435, January.
    11. Fröhling, Magnus & Schwaderer, Frank & Bartusch, Hauke & Rentz, Otto, 2010. "Integrated planning of transportation and recycling for multiple plants based on process simulation," European Journal of Operational Research, Elsevier, vol. 207(2), pages 958-970, December.
    12. Tang, Lixin & Liu, Jiyin & Rong, Aiying & Yang, Zihou, 2001. "A review of planning and scheduling systems and methods for integrated steel production," European Journal of Operational Research, Elsevier, vol. 133(1), pages 1-20, August.
    13. Milind Dawande & Jayant Kalagnanam & Ho Soo Lee & Chandra Reddy & Stuart Siegel & Mark Trumbo, 2004. "The Slab-Design Problem in the Steel Industry," Interfaces, INFORMS, vol. 34(3), pages 215-225, June.
    14. Mujawar, Sachin & Huang, Simin & Nagi, Rakesh, 2012. "Scheduling to minimize stringer utilization for continuous annealing operations," Omega, Elsevier, vol. 40(4), pages 437-444.
    15. P A Huegler & J C Hartman, 2007. "Fulfilling orders for steel plates from existing inventory," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(9), pages 1156-1166, September.
    16. ReVelle, C. S. & Eiselt, H. A., 2005. "Location analysis: A synthesis and survey," European Journal of Operational Research, Elsevier, vol. 165(1), pages 1-19, August.
    17. P A Huegler & F J Vasko, 2007. "Metaheuristics for meltshop scheduling in the steel industry," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(6), pages 791-796, June.
    18. Lixin Tang & Gongshu Wang & Jiyin Liu & Jingyi Liu, 2011. "A combination of Lagrangian relaxation and column generation for order batching in steelmaking and continuous‐casting production," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(4), pages 370-388, June.
    19. M. Almiñana & J. Pastor, 1994. "Two new heuristics for the location set covering problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 2(2), pages 315-328, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:81:y:1995:i:1:p:105-114. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.