Managing Increasing Product Variety at Integrated Steel Mills
Author
Abstract
Suggested Citation
DOI: 10.1287/inte.33.2.41.16373
Download full text from publisher
References listed on IDEAS
- Francis J. Vasko & Floyd E. Wolf & John A. Pflugrad, 1991. "An Efficient Heuristic for Planning Mother Plate Requirements at Bethlehem Steel," Interfaces, INFORMS, vol. 21(2), pages 1-7, April.
- Jayant R. Kalagnanam & Milind W. Dawande & Mark Trumbo & Ho Soo Lee, 2000. "The Surplus Inventory Matching Problem in the Process Industry," Operations Research, INFORMS, vol. 48(4), pages 505-516, August.
- Hafeez, K. & Griffiths, M. & Griffiths, J. & Naim, M. M., 1996. "Systems design of a two-echelon steel industry supply chain," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 121-130, August.
- Michael B. Teitz & Polly Bart, 1968. "Heuristic Methods for Estimating the Generalized Vertex Median of a Weighted Graph," Operations Research, INFORMS, vol. 16(5), pages 955-961, October.
- Sasidhar, B. & Achary, K. K., 1991. "A multiple arc network model of production planning in a steel mill," International Journal of Production Economics, Elsevier, vol. 22(3), pages 195-202, December.
- Friedrich Wilhelm Bielefeld & Klaus-Dieter Walter & Rolf Wartmann, 1986. "A Computer-Based Strategic Planning System for Steel Production," Interfaces, INFORMS, vol. 16(4), pages 41-46, August.
- Anantaram Balakrishnan & Stuart Brown, 1996. "Process Planning for Aluminum Tubes: An Engineering-Operations Perspective," Operations Research, INFORMS, vol. 44(1), pages 7-20, February.
- Hau L. Lee, 1996. "Effective Inventory and Service Management Through Product and Process Redesign," Operations Research, INFORMS, vol. 44(1), pages 151-159, February.
- Gopal P. Sinha & B. S. Chandrasekaran & Niloy Mitter & Goutam Dutta & Sudhir B. Singh & Aditya Roy Choudhury & P. N. Roy, 1995. "Strategic and Operational Management with Optimization at Tata Steel," Interfaces, INFORMS, vol. 25(1), pages 6-19, February.
- Mark A. Vonderembse & Robert W. Haessler, 1982. "A Mathematical Programming Approach to Schedule Master Slab Casters in the Steel Industry," Management Science, INFORMS, vol. 28(12), pages 1450-1461, December.
- Guillermo Gallego & Paul Zipkin, 1999. "Stock Positioning and Performance Estimation in Serial Production-Transportation Systems," Manufacturing & Service Operations Management, INFORMS, vol. 1(1), pages 77-88.
- Kisperska-Moron, Danuta, 1990. "Analysis of the logistic system of steel products in Poland," Engineering Costs and Production Economics, Elsevier, vol. 19(1-3), pages 47-55, May.
- Jayashankar M. Swaminathan & Sridhar R. Tayur, 1998. "Managing Broader Product Lines through Delayed Differentiation Using Vanilla Boxes," Management Science, INFORMS, vol. 44(12-Part-2), pages 161-172, December.
- Richard E. Box & Donald G. Herbe, 1988. "A Scheduling Model for LTV Steel's Cleveland Works' Twin Strand Continuous Slab Caster," Interfaces, INFORMS, vol. 18(1), pages 42-56, February.
- Francis J. Vasko & Floyd E. Wolf & Kenneth L. Stott & James W. Scheirer, 1989. "Selecting Optimal Ingot Sizes for Bethlehem Steel," Interfaces, INFORMS, vol. 19(1), pages 68-84, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Brabazon, Philip G. & MacCarthy, Bart, 2006. "Fundamental behaviour of virtual-build-to-order systems," International Journal of Production Economics, Elsevier, vol. 104(2), pages 514-524, December.
- Milind Dawande & Jayant Kalagnanam & Ho Soo Lee & Chandra Reddy & Stuart Siegel & Mark Trumbo, 2004. "The Slab-Design Problem in the Steel Industry," Interfaces, INFORMS, vol. 34(3), pages 215-225, June.
- MacCarthy, Bart L. & Ovutmen, Tamer, 2015. "Using a central Vehicle Holding Compound (VHC) in an open pipeline automotive order fulfilment system: A simulation study," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 590-601.
- Morikawa, Katsumi & Takahashi, Katsuhiko & Hirotani, Daisuke, 2014. "Make-to-stock policies for a multistage serial system under a make-to-order production environment," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 30-37.
- Fernandes, Nuno O. & Silva, Cristóvão & Carmo-Silva, S., 2015. "Order release in the hybrid MTO–FTO production," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 513-520.
- Kerkkanen, Annastiina, 2007. "Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 111-118, July.
- Wikner, Joakim & Naim, Mohamed M. & Spiegler, Virginia L.M. & Lin, Junyi, 2017. "IOBPCS based models and decoupling thinking," International Journal of Production Economics, Elsevier, vol. 194(C), pages 153-166.
- Singer, Marcos & Donoso, Patricio, 2006. "Strategic decision-making at a steel manufacturer assisted by linear programming," Journal of Business Research, Elsevier, vol. 59(3), pages 387-390, March.
- Diwakar Gupta & Lei Wang, 2007. "Capacity Management for Contract Manufacturing," Operations Research, INFORMS, vol. 55(2), pages 367-377, April.
- Singer, Marcos & Donoso, Patricio, 2008. "Empirical validation of an activity-based optimization system," International Journal of Production Economics, Elsevier, vol. 113(1), pages 335-345, May.
- Zhiming Shi & Yisong Li & Gábor Bohács & Qiang Zhou, 2022. "A Study on Optimal Location Selection and Semi-Finished Product Inventory Allocation in the Steel Industry," Sustainability, MDPI, vol. 14(22), pages 1-21, November.
- Ayd{i}n Alptekinou{g}lu & Charles J. Corbett, 2010. "Leadtime-Variety Tradeoff in Product Differentiation," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 569-582, January.
- As'ad, Rami & Demirli, Kudret, 2010. "Production scheduling in steel rolling mills with demand substitution: Rolling horizon implementation and approximations," International Journal of Production Economics, Elsevier, vol. 126(2), pages 361-369, August.
- Chou, Yon-Chun & Lin, Yue-Lan & Chun, King-Fai, 2014. "A construction of knowledge rules for reactive planning of job-mix assignment to homogeneous serial batch machines," International Journal of Production Economics, Elsevier, vol. 151(C), pages 56-66.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Goutam Dutta & Robert Fourer, 2001. "A Survey of Mathematical Programming Applications in Integrated Steel Plants," Manufacturing & Service Operations Management, INFORMS, vol. 3(4), pages 387-400.
- Bowers, M.R. & Kaplan, L.A. & Hooker, T.L., 1995. "A two-phase model for planning the production of aluminum ingot," European Journal of Operational Research, Elsevier, vol. 81(1), pages 105-114, February.
- Lixin Tang & Gongshu Wang & Zhi-Long Chen, 2014. "Integrated Charge Batching and Casting Width Selection at Baosteel," Operations Research, INFORMS, vol. 62(4), pages 772-787, August.
- Kerkkanen, Annastiina, 2007. "Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 111-118, July.
- Alfaro, José A. & Corbett, Charles J., 2000. "The value of SKU rationalization: the pooling effect under suboptimal inventory policies," DEE - Working Papers. Business Economics. WB 9917, Universidad Carlos III de Madrid. Departamento de EconomÃa de la Empresa.
- P A Huegler & J C Hartman, 2007. "Fulfilling orders for steel plates from existing inventory," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(9), pages 1156-1166, September.
- Kuthambalayan, Thyagaraj S. & Mehta, Peeyush & Shanker, Kripa, 2014. "Integrating operations and marketing decisions using delayed differentiation of products and guaranteed delivery time under stochastic demand," European Journal of Operational Research, Elsevier, vol. 237(2), pages 617-627.
- V. Krishnan & Karl T. Ulrich, 2001. "Product Development Decisions: A Review of the Literature," Management Science, INFORMS, vol. 47(1), pages 1-21, January.
- Reimann, Marc, 2012. "Accurate response by postponement," European Journal of Operational Research, Elsevier, vol. 220(3), pages 619-628.
- Lixin Tang & Ying Meng & Zhi-Long Chen & Jiyin Liu, 2016. "Coil Batching to Improve Productivity and Energy Utilization in Steel Production," Manufacturing & Service Operations Management, INFORMS, vol. 18(2), pages 262-279, May.
- Anantaram Balakrishnan & Joseph Geunes, 2003. "Production Planning with Flexible Product Specifications: An Application to Specialty Steel Manufacturing," Operations Research, INFORMS, vol. 51(1), pages 94-112, February.
- Tang, Dong, 2011. "Managing finished-goods inventory under capacitated delayed differentiation," Omega, Elsevier, vol. 39(5), pages 481-492, October.
- Hans Sebastian Heese & Jayashankar M. Swaminathan, 2006. "Product Line Design with Component Commonality and Cost-Reduction Effort," Manufacturing & Service Operations Management, INFORMS, vol. 8(2), pages 206-219, May.
- Tang, Christopher S., 2006. "Perspectives in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 103(2), pages 451-488, October.
- Jayashankar M. Swaminathan & Sridhar R. Tayur, 2003. "Models for Supply Chains in E-Business," Management Science, INFORMS, vol. 49(10), pages 1387-1406, October.
- Jiri Chod & David Pyke & Nils Rudi, 2010. "The Value of Flexibility in Make-to-Order Systems: The Effect of Demand Correlation," Operations Research, INFORMS, vol. 58(4-part-1), pages 834-848, August.
- Marianov, Vladimir & Serra, Daniel & ReVelle, Charles, 1999.
"Location of hubs in a competitive environment,"
European Journal of Operational Research, Elsevier, vol. 114(2), pages 363-371, April.
- Vladimir Marianov & Daniel Serra & Charles Revelle, 1997. "Location of hubs in a competitive environment," Economics Working Papers 227, Department of Economics and Business, Universitat Pompeu Fabra.
- Tan Wang & L. Jeff Hong, 2023. "Large-Scale Inventory Optimization: A Recurrent Neural Networks–Inspired Simulation Approach," INFORMS Journal on Computing, INFORMS, vol. 35(1), pages 196-215, January.
- J. F. F. Almeida & S. V. Conceição & L. R. Pinto & B. R. P. Oliveira & L. F. Rodrigues, 2022. "Optimal sales and operations planning for integrated steel industries," Annals of Operations Research, Springer, vol. 315(2), pages 773-790, August.
- Krishnan S. Anand & Haim Mendelson, 1998. "Postponement and Information in a Supply Chain," Discussion Papers 1222, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
More about this item
Keywords
Industries: mining; metals. Inventory production: applications.;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orinte:v:33:y:2003:i:2:p:41-53. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.