IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v80y1995i2p264-276.html
   My bibliography  Save this article

Production to order on a two machine line with random yields and rigid demand

Author

Listed:
  • Grosfeld-Nir, Abraham
  • Robinson, Lawrence W.

Abstract

No abstract is available for this item.

Suggested Citation

  • Grosfeld-Nir, Abraham & Robinson, Lawrence W., 1995. "Production to order on a two machine line with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 80(2), pages 264-276, January.
  • Handle: RePEc:eee:ejores:v:80:y:1995:i:2:p:264-276
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(94)00170-H
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. D. J. White, 1965. "Dynamic Programming and Systems of Uncertain Duration," Management Science, INFORMS, vol. 12(1), pages 37-67, September.
    2. Anne Spence Wein, 1992. "Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment," Operations Research, INFORMS, vol. 40(3), pages 551-563, June.
    3. Abraham Grosfeld-Nir & Boaz Ronen, 1993. "A Single Bottleneck System with Binomial Yields and Rigid Demand," Management Science, INFORMS, vol. 39(5), pages 650-653, May.
    4. Hau L. Lee & Candace Arai Yano, 1988. "Production Control in Multistage Systems with Variable Yield Losses," Operations Research, INFORMS, vol. 36(2), pages 269-278, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Grosfeld-Nir, Abraham, 2005. "A two-bottleneck system with binomial yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 165(1), pages 231-250, August.
    2. Zare, Marjan & Esmaeili, Maryam & He, Yuanjie, 2019. "Implications of risk-sharing strategies on supply chains with multiple retailers and under random yield," International Journal of Production Economics, Elsevier, vol. 216(C), pages 413-424.
    3. Grosfeld-Nir, Abraham & Anily, Shoshana & Ben-Zvi, Tal, 2006. "Lot-sizing two-echelon assembly systems with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 173(2), pages 600-616, September.
    4. M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
    5. Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
    6. Choi, Sungyong & Jeon, Sumin & Kim, Jinmin & Park, Kwangtae, 2019. "A newsvendor analysis of a binomial yield production process," European Journal of Operational Research, Elsevier, vol. 273(3), pages 983-991.
    7. Abraham Grosfeld-Nir & Yigal Gerchak, 2002. "Multistage Production to Order with Rework Capability," Management Science, INFORMS, vol. 48(5), pages 652-664, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
    2. Grosfeld-Nir, Abraham, 1995. "Single bottleneck systems with proportional expected yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 80(2), pages 297-307, January.
    3. G C Hadjinicola, 2010. "Manufacturing costs in serial production systems with rework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 342-351, February.
    4. Gerchak, Yigal & Grosfeld-Nir, Abraham, 1998. "Multiple lot-sizing, and value of probabilistic information, in production to order of an uncertain size," International Journal of Production Economics, Elsevier, vol. 56(1), pages 191-197, September.
    5. Jim (Junmin) Shi & Xiaohang Yue & Yao Zhao, 2014. "Operations sequencing for a multi‐stage production inventory system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(2), pages 144-154, March.
    6. Grosfeld-Nir, Abraham & Anily, Shoshana & Ben-Zvi, Tal, 2006. "Lot-sizing two-echelon assembly systems with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 173(2), pages 600-616, September.
    7. Abraham Grosfeld-Nir & Yigal Gerchak, 2002. "Multistage Production to Order with Rework Capability," Management Science, INFORMS, vol. 48(5), pages 652-664, May.
    8. Tinglong Dai & Kinshuk Jerath, 2019. "Salesforce Contracting Under Uncertain Demand and Supply: Double Moral Hazard and Optimality of Smooth Contracts," Marketing Science, INFORMS, vol. 38(5), pages 852-870, September.
    9. Wang, Yunzeng & Gerchak, Yigal, 2000. "Input control in a batch production system with lead times, due dates and random yields," European Journal of Operational Research, Elsevier, vol. 126(2), pages 371-385, October.
    10. Choi, Sungyong & Jeon, Sumin & Kim, Jinmin & Park, Kwangtae, 2019. "A newsvendor analysis of a binomial yield production process," European Journal of Operational Research, Elsevier, vol. 273(3), pages 983-991.
    11. Pham, An & Jin, Tongdan & Novoa, Clara & Qin, Jin, 2019. "A multi-site production and microgrid planning model for net-zero energy operations," International Journal of Production Economics, Elsevier, vol. 218(C), pages 260-274.
    12. Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
    13. Jinfa Chen & David D. Yao & Shaohui Zheng, 2001. "Optimal Replenishment and Rework with Multiple Unreliable Supply Sources," Operations Research, INFORMS, vol. 49(3), pages 430-443, June.
    14. Qing Li & Shaohui Zheng, 2006. "Joint Inventory Replenishment and Pricing Control for Systems with Uncertain Yield and Demand," Operations Research, INFORMS, vol. 54(4), pages 696-705, August.
    15. Pollock, Stephen M. & Golhar, Damodar, 1998. "The canning problem revisited: The case of capacitated production and fixed demand," European Journal of Operational Research, Elsevier, vol. 105(3), pages 475-482, March.
    16. Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
    17. Burak Kazaz, 2004. "Production Planning Under Yield and Demand Uncertainty with Yield-Dependent Cost and Price," Manufacturing & Service Operations Management, INFORMS, vol. 6(3), pages 209-224, October.
    18. Asli Sencer Erdem & Mehmet Murat Fadilog̃lu & Süleyman Özekici, 2006. "An EOQ model with multiple suppliers and random capacity," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(1), pages 101-114, February.
    19. Xu, He, 2010. "Managing production and procurement through option contracts in supply chains with random yield," International Journal of Production Economics, Elsevier, vol. 126(2), pages 306-313, August.
    20. Qi Feng & Zhongjie Ma & Zhaofang Mao & J. George Shanthikumar, 2021. "Multi‐Stage Supply Chain with Production Uncertainty," Production and Operations Management, Production and Operations Management Society, vol. 30(4), pages 921-940, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:80:y:1995:i:2:p:264-276. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.