IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v80y1995i2p297-307.html
   My bibliography  Save this article

Single bottleneck systems with proportional expected yields and rigid demand

Author

Listed:
  • Grosfeld-Nir, Abraham

Abstract

No abstract is available for this item.

Suggested Citation

  • Grosfeld-Nir, Abraham, 1995. "Single bottleneck systems with proportional expected yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 80(2), pages 297-307, January.
  • Handle: RePEc:eee:ejores:v:80:y:1995:i:2:p:297-307
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(94)00172-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. D. J. White, 1965. "Dynamic Programming and Systems of Uncertain Duration," Management Science, INFORMS, vol. 12(1), pages 37-67, September.
    2. Hau L. Lee & Candace Arai Yano, 1988. "Production Control in Multistage Systems with Variable Yield Losses," Operations Research, INFORMS, vol. 36(2), pages 269-278, April.
    3. Morton Klein, 1966. "Markovian Decision Models for Reject Allowance Problems," Management Science, INFORMS, vol. 12(5), pages 349-358, January.
    4. Abraham Grosfeld-Nir & Boaz Ronen, 1993. "A Single Bottleneck System with Binomial Yields and Rigid Demand," Management Science, INFORMS, vol. 39(5), pages 650-653, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Inderfurth, Karl & Langella, Ian M. & Transchel, Sandra & Vogelgesang, Stephanie, 2017. "A heuristic solution method for disassemble-to-order problems with binomial disassembly yields," International Journal of Production Economics, Elsevier, vol. 185(C), pages 266-274.
    2. Abraham Grosfeld-Nir & Yigal Gerchak, 2002. "Multistage Production to Order with Rework Capability," Management Science, INFORMS, vol. 48(5), pages 652-664, May.
    3. M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
    4. Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
    5. Grosfeld-Nir, Abraham, 2005. "A two-bottleneck system with binomial yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 165(1), pages 231-250, August.
    6. Zare, Marjan & Esmaeili, Maryam & He, Yuanjie, 2019. "Implications of risk-sharing strategies on supply chains with multiple retailers and under random yield," International Journal of Production Economics, Elsevier, vol. 216(C), pages 413-424.
    7. Grosfeld-Nir, Abraham & Anily, Shoshana & Ben-Zvi, Tal, 2006. "Lot-sizing two-echelon assembly systems with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 173(2), pages 600-616, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Wang, Yunzeng & Gerchak, Yigal, 2000. "Input control in a batch production system with lead times, due dates and random yields," European Journal of Operational Research, Elsevier, vol. 126(2), pages 371-385, October.
    2. Grosfeld-Nir, Abraham & Robinson, Lawrence W., 1995. "Production to order on a two machine line with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 80(2), pages 264-276, January.
    3. Grosfeld-Nir, Abraham & Anily, Shoshana & Ben-Zvi, Tal, 2006. "Lot-sizing two-echelon assembly systems with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 173(2), pages 600-616, September.
    4. M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
    5. Abraham Grosfeld-Nir & Yigal Gerchak, 2002. "Multistage Production to Order with Rework Capability," Management Science, INFORMS, vol. 48(5), pages 652-664, May.
    6. Lonnie Turpin & Barron Brown, 2021. "On Reworks in a Serial Process with Flexible Windows of Time," SN Operations Research Forum, Springer, vol. 2(2), pages 1-13, June.
    7. Juhwen Hwang & Medini R. Singh, 1998. "Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities," Management Science, INFORMS, vol. 44(9), pages 1279-1294, September.
    8. Choi, Sungyong & Jeon, Sumin & Kim, Jinmin & Park, Kwangtae, 2019. "A newsvendor analysis of a binomial yield production process," European Journal of Operational Research, Elsevier, vol. 273(3), pages 983-991.
    9. Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
    10. Pham, An & Jin, Tongdan & Novoa, Clara & Qin, Jin, 2019. "A multi-site production and microgrid planning model for net-zero energy operations," International Journal of Production Economics, Elsevier, vol. 218(C), pages 260-274.
    11. Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
    12. Zare, Marjan & Esmaeili, Maryam & He, Yuanjie, 2019. "Implications of risk-sharing strategies on supply chains with multiple retailers and under random yield," International Journal of Production Economics, Elsevier, vol. 216(C), pages 413-424.
    13. Gerchak, Yigal & Grosfeld-Nir, Abraham, 1998. "Multiple lot-sizing, and value of probabilistic information, in production to order of an uncertain size," International Journal of Production Economics, Elsevier, vol. 56(1), pages 191-197, September.
    14. Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
    15. Nasr, Walid W. & Maddah, Bacel & Salameh, Moueen K., 2013. "EOQ with a correlated binomial supply," International Journal of Production Economics, Elsevier, vol. 144(1), pages 248-255.
    16. Panagiotis Kouvelis & Martin A. Lariviere, 2000. "Decentralizing Cross-Functional Decisions: Coordination Through Internal Markets," Management Science, INFORMS, vol. 46(8), pages 1049-1058, August.
    17. S. Andrew Starbird, 1997. "Acceptance sampling, imperfect production, and the optimality of zero defects," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 515-530, September.
    18. Sy-Ming Guu & Chun-Yi Lin, 2018. "The multiple lot sizing problem of a serial production system with interrupted geometric yields, rigid demand and Pentico’s heuristic," Annals of Operations Research, Springer, vol. 269(1), pages 167-183, October.
    19. Jinfa Chen & David D. Yao & Shaohui Zheng, 2001. "Optimal Replenishment and Rework with Multiple Unreliable Supply Sources," Operations Research, INFORMS, vol. 49(3), pages 430-443, June.
    20. Qing Li & Shaohui Zheng, 2006. "Joint Inventory Replenishment and Pricing Control for Systems with Uncertain Yield and Demand," Operations Research, INFORMS, vol. 54(4), pages 696-705, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:80:y:1995:i:2:p:297-307. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.