Input control in a batch production system with lead times, due dates and random yields
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Yunzeng Wang & Yigal Gerchak, 1996. "Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand," Management Science, INFORMS, vol. 42(1), pages 130-137, January.
- D. J. White, 1965. "Dynamic Programming and Systems of Uncertain Duration," Management Science, INFORMS, vol. 12(1), pages 37-67, September.
- Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
- Morton Klein, 1966. "Markovian Decision Models for Reject Allowance Problems," Management Science, INFORMS, vol. 12(5), pages 349-358, January.
- Abraham Grosfeld-Nir & Boaz Ronen, 1993. "A Single Bottleneck System with Binomial Yields and Rigid Demand," Management Science, INFORMS, vol. 39(5), pages 650-653, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Garima Sharma & Pravin Kumar, 2021. "An Analysis of Causal Relationships Among the Factors Affecting the Performance of a Service Organization," SAGE Open, , vol. 11(1), pages 21582440219, March.
- Talay, Işılay & Özdemir-Akyıldırım, Öznur, 2019. "Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty," European Journal of Operational Research, Elsevier, vol. 275(2), pages 536-551.
- Zare, Marjan & Esmaeili, Maryam & He, Yuanjie, 2019. "Implications of risk-sharing strategies on supply chains with multiple retailers and under random yield," International Journal of Production Economics, Elsevier, vol. 216(C), pages 413-424.
- Choi, Sungyong & Jeon, Sumin & Kim, Jinmin & Park, Kwangtae, 2019. "A newsvendor analysis of a binomial yield production process," European Journal of Operational Research, Elsevier, vol. 273(3), pages 983-991.
- He, Yuanjie & Zhang, Jiang, 2008. "Random yield risk sharing in a two-level supply chain," International Journal of Production Economics, Elsevier, vol. 112(2), pages 769-781, April.
- Wu, Cheng-Hung & Chuang, Ya-Tang, 2010. "An innovative approach for strategic capacity portfolio planning under uncertainties," European Journal of Operational Research, Elsevier, vol. 207(2), pages 1002-1013, December.
- Schemeleva, Kseniya & Delorme, Xavier & Dolgui, Alexandre, 2018. "Evaluation of solution approaches for a stochastic lot-sizing and sequencing problem," International Journal of Production Economics, Elsevier, vol. 199(C), pages 179-192.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Grosfeld-Nir, Abraham & Anily, Shoshana & Ben-Zvi, Tal, 2006. "Lot-sizing two-echelon assembly systems with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 173(2), pages 600-616, September.
- Grosfeld-Nir, Abraham, 1995. "Single bottleneck systems with proportional expected yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 80(2), pages 297-307, January.
- Juhwen Hwang & Medini R. Singh, 1998. "Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities," Management Science, INFORMS, vol. 44(9), pages 1279-1294, September.
- Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
- Qing Li & Shaohui Zheng, 2006. "Joint Inventory Replenishment and Pricing Control for Systems with Uncertain Yield and Demand," Operations Research, INFORMS, vol. 54(4), pages 696-705, August.
- Shoshana Anily & Avraham Beja & Amit Mendel, 2002. "Optimal Lot Sizes with Geometric Production Yield and Rigid Demand," Operations Research, INFORMS, vol. 50(3), pages 424-432, June.
- Asli Sencer Erdem & Mehmet Murat Fadilog̃lu & Süleyman Özekici, 2006. "An EOQ model with multiple suppliers and random capacity," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(1), pages 101-114, February.
- Mart, Turgut & Duran, Serhan & Bakal, İsmail Serdar, 2013. "Tactical inventory and backorder decisions for systems with predictable production yield," International Journal of Production Economics, Elsevier, vol. 143(2), pages 294-303.
- Baruah, Pundarikaksha, 2006. "Supply Chains Facing Atypical Demand: Optimal Operational Policies And Benefits Under Information Sharing," MPRA Paper 16101, University Library of Munich, Germany.
- Yi Yang & Youhua (Frank) Chen & Yun Zhou, 2014. "Coordinating Inventory Control and Pricing Strategies Under Batch Ordering," Operations Research, INFORMS, vol. 62(1), pages 25-37, February.
- Jain, Tarun & Hazra, Jishnu, 2017. "Sourcing strategies under agglomeration economies, capacity risks and retail competition," International Journal of Production Economics, Elsevier, vol. 191(C), pages 311-322.
- Fei Ye & Qiang Lin & Yina Li, 2020. "Coordination for contract farming supply chain with stochastic yield and demand under CVaR criterion," Operational Research, Springer, vol. 20(1), pages 369-397, March.
- Seung Hwan Jung, 2020. "Offshore versus Onshore Sourcing: Quick Response, Random Yield, and Competition," Production and Operations Management, Production and Operations Management Society, vol. 29(3), pages 750-766, March.
- Arifoglu, Kenan & Özekici, Süleyman, 2011. "Inventory management with random supply and imperfect information: A hidden Markov model," International Journal of Production Economics, Elsevier, vol. 134(1), pages 123-137, November.
- Xu, He, 2010. "Managing production and procurement through option contracts in supply chains with random yield," International Journal of Production Economics, Elsevier, vol. 126(2), pages 306-313, August.
- Maqbool Dada & Nicholas C. Petruzzi & Leroy B. Schwarz, 2007. "A Newsvendor's Procurement Problem when Suppliers Are Unreliable," Manufacturing & Service Operations Management, INFORMS, vol. 9(1), pages 9-32, August.
- Grosfeld-Nir, Abraham & Robinson, Lawrence W., 1995. "Production to order on a two machine line with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 80(2), pages 264-276, January.
- Arifoglu, Kenan & Özekici, Süleyman, 2010. "Optimal policies for inventory systems with finite capacity and partially observed Markov-modulated demand and supply processes," European Journal of Operational Research, Elsevier, vol. 204(3), pages 421-438, August.
- Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
- Zare, Marjan & Esmaeili, Maryam & He, Yuanjie, 2019. "Implications of risk-sharing strategies on supply chains with multiple retailers and under random yield," International Journal of Production Economics, Elsevier, vol. 216(C), pages 413-424.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:126:y:2000:i:2:p:371-385. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.