Random Yield, Rework and Scrap in a Multistage Batch Manufacturing Environment
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.40.3.551
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Victor F. Araman & Ioana Popescu, 2010. "Media Revenue Management with Audience Uncertainty: Balancing Upfront and Spot Market Sales," Manufacturing & Service Operations Management, INFORMS, vol. 12(2), pages 190-212, December.
- Jim (Junmin) Shi & Xiaohang Yue & Yao Zhao, 2014. "Operations sequencing for a multi‐stage production inventory system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(2), pages 144-154, March.
- Grosfeld-Nir, Abraham & Robinson, Lawrence W., 1995. "Production to order on a two machine line with random yields and rigid demand," European Journal of Operational Research, Elsevier, vol. 80(2), pages 264-276, January.
- Tinglong Dai & Kinshuk Jerath, 2019. "Salesforce Contracting Under Uncertain Demand and Supply: Double Moral Hazard and Optimality of Smooth Contracts," Marketing Science, INFORMS, vol. 38(5), pages 852-870, September.
- Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
- Jaber, Mohamad Y. & Khan, Mehmood, 2010. "Managing yield by lot splitting in a serial production line with learning, rework and scrap," International Journal of Production Economics, Elsevier, vol. 124(1), pages 32-39, March.
- G C Hadjinicola, 2010. "Manufacturing costs in serial production systems with rework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 342-351, February.
- Charles M. Weber & Rainer P. Hasenauer & Nitin V. Mayande, 2018. "Toward a Pragmatic Theory for Managing Nescience," International Journal of Innovation and Technology Management (IJITM), World Scientific Publishing Co. Pte. Ltd., vol. 15(05), pages 1-26, October.
- M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
- Gerchak, Yigal & Grosfeld-Nir, Abraham, 1998. "Multiple lot-sizing, and value of probabilistic information, in production to order of an uncertain size," International Journal of Production Economics, Elsevier, vol. 56(1), pages 191-197, September.
- Sonntag, Danja & Kiesmüller, Gudrun P., 2018. "Disposal versus rework – Inventory control in a production system with random yield," European Journal of Operational Research, Elsevier, vol. 267(1), pages 138-149.
More about this item
Keywords
dynamic programming/optimal control; applications: multistage manufacturing; inventory/production: rework and scrap policies in multistage stochastic systems;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:40:y:1992:i:3:p:551-563. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.