Project planning with alternative technologies in uncertain environments
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2014.11.014
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Ming Ding & Jehoshua Eliashberg, 2002. "Structuring the New Product Development Pipeline," Management Science, INFORMS, vol. 48(3), pages 343-363, March.
- Weitzman, Martin L, 1979.
"Optimal Search for the Best Alternative,"
Econometrica, Econometric Society, vol. 47(3), pages 641-654, May.
- M. L. Weitzman, 1978. "Optimal Search for the Best Alternative," Working papers 214, Massachusetts Institute of Technology (MIT), Department of Economics.
- Arfst Ludwig & Rolf Möhring & Frederik Stork, 2001. "A Computational Study on Bounding the Makespan Distribution in Stochastic Project Networks," Annals of Operations Research, Springer, vol. 102(1), pages 49-64, February.
- V. G. Kulkarni & V. G. Adlakha, 1986. "Markov and Markov-Regenerative pert Networks," Operations Research, INFORMS, vol. 34(5), pages 769-781, October.
- Yu, Jiun-Yu & Gittins, John, 2008. "Models and software for improving the profitability of pharmaceutical research," European Journal of Operational Research, Elsevier, vol. 189(2), pages 459-475, September.
- A. R. Klingel, Jr., 1966. "Bias in Pert Project Completion Time Calculations for a Real Network," Management Science, INFORMS, vol. 13(4), pages 194-201, December.
- Svenja C. Sommer & Christoph H. Loch, 2004. "Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty," Management Science, INFORMS, vol. 50(10), pages 1334-1347, October.
- Sobel, Matthew J. & Szmerekovsky, Joseph G. & Tilson, Vera, 2009. "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, Elsevier, vol. 198(3), pages 697-705, November.
- Sylvain Lenfle, 2011. "The strategy of parallel approaches in projects with unforeseeable uncertainty: the Manhattan case in retrospect," Post-Print hal-00658346, HAL.
- Stefano Benati, 2006. "An Optimization Model for Stochastic Project Networks with Cash Flows," Computational Management Science, Springer, vol. 3(4), pages 271-284, September.
- William J. Abernathy & Richard S. Rosenbloom, 1969. "Parallel Strategies in Development Projects," Management Science, INFORMS, vol. 15(10), pages 486-505, June.
- Daniel Granot & Dror Zuckerman, 1991. "Optimal Sequencing and Resource Allocation in Research and Development Projects," Management Science, INFORMS, vol. 37(2), pages 140-156, February.
- Arnold H. Buss & Meir J. Rosenblatt, 1997. "Activity Delay in Stochastic Project Networks," Operations Research, INFORMS, vol. 45(1), pages 126-139, February.
- I Ben-David & T Raz, 2001. "An integrated approach for risk response development in project planning," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(1), pages 14-25, January.
- S. Creemers & R. Leus & M. Lambrecht, 2010. "Scheduling Markovian PERT networks to maximize the net present value," Post-Print hal-00800198, HAL.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Creemers, Stefan, 2018. "Moments and distribution of the net present value of a serial project," European Journal of Operational Research, Elsevier, vol. 267(3), pages 835-848.
- Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
- Kaut, Michal & Vaagen, Hajnalka & Wallace, Stein W., 2021. "The combined impact of stochastic and correlated activity durations and design uncertainty on project plans," International Journal of Production Economics, Elsevier, vol. 233(C).
- Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
- Bordley, Robert F. & Keisler, Jeffrey M. & Logan, Tom M., 2019. "Managing projects with uncertain deadlines," European Journal of Operational Research, Elsevier, vol. 274(1), pages 291-302.
- Servranckx, Tom & Vanhoucke, Mario, 2019. "A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs," European Journal of Operational Research, Elsevier, vol. 273(3), pages 841-860.
- Wenhui Zhao & Nicholas G. Hall & Zhixin Liu, 2020. "Project Evaluation and Selection with Task Failures," Production and Operations Management, Production and Operations Management Society, vol. 29(2), pages 428-446, February.
- Szmerekovsky, Joseph G. & Venkateshan, Prahalad & Simonson, Peter D., 2023. "Project scheduling under the threat of catastrophic disruption," European Journal of Operational Research, Elsevier, vol. 309(2), pages 784-794.
- Creemers, Stefan, 2019. "The preemptive stochastic resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 277(1), pages 238-247.
- Aditya Vedantam & Ananth Iyer, 2021. "Capacity Investment under Bayesian Information Updates at Reporting Periods: Model and Application," Production and Operations Management, Production and Operations Management Society, vol. 30(8), pages 2707-2725, August.
- Stefan Creemers, 2019. "The preemptive stochastic resource-constrained project scheduling problem," Post-Print hal-02992618, HAL.
- Hermans, Ben & Leus, Roel & Looy, Bart Van, 2023. "Deciding on scheduling, secrecy, and patenting during the new product development process: The relevance of project planning models," Omega, Elsevier, vol. 116(C).
- Rostami, Salim & Creemers, Stefan & Wei, Wenchao & Leus, Roel, 2019. "Sequential testing of n-out-of-n systems: Precedence theorems and exact methods," European Journal of Operational Research, Elsevier, vol. 274(3), pages 876-885.
- He-Yau Kang & Amy H. I. Lee & Tzu-Ting Huang, 2016. "Project Management for a Wind Turbine Construction by Applying Fuzzy Multiple Objective Linear Programming Models," Energies, MDPI, vol. 9(12), pages 1-15, December.
- Creemers, Stefan, 2018. "Maximizing the expected net present value of a project with phase-type distributed activity durations: An efficient globally optimal solution procedure," European Journal of Operational Research, Elsevier, vol. 267(1), pages 16-22.
- Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Creemers, Stefan, 2018. "Maximizing the expected net present value of a project with phase-type distributed activity durations: An efficient globally optimal solution procedure," European Journal of Operational Research, Elsevier, vol. 267(1), pages 16-22.
- Stefan Creemers, 2019. "The preemptive stochastic resource-constrained project scheduling problem," Post-Print hal-02992618, HAL.
- Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
- B. De Reyck & Y. Grushka-Cockayne & R. Leus, 2007. "A New Challenge in Project Scheduling. The Incorporation of Activity Failures," Review of Business and Economic Literature, KU Leuven, Faculty of Economics and Business (FEB), Review of Business and Economic Literature, vol. 0(3), pages 410-435.
- Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
- Hermans, Ben & Leus, Roel & Looy, Bart Van, 2023. "Deciding on scheduling, secrecy, and patenting during the new product development process: The relevance of project planning models," Omega, Elsevier, vol. 116(C).
- Eli Gutin & Daniel Kuhn & Wolfram Wiesemann, 2015. "Interdiction Games on Markovian PERT Networks," Management Science, INFORMS, vol. 61(5), pages 999-1017, May.
- Creemers, Stefan, 2019. "The preemptive stochastic resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 277(1), pages 238-247.
- Alessio Angius & András Horváth & Marcello Urgo, 2021. "A Kronecker Algebra Formulation for Markov Activity Networks with Phase-Type Distributions," Mathematics, MDPI, vol. 9(12), pages 1-22, June.
- Wiesemann, Wolfram & Kuhn, Daniel & Rustem, Berç, 2010. "Maximizing the net present value of a project under uncertainty," European Journal of Operational Research, Elsevier, vol. 202(2), pages 356-367, April.
- Peymankar, Mahboobeh & Davari, Morteza & Ranjbar, Mohammad, 2021. "Maximizing the expected net present value in a project with uncertain cash flows," European Journal of Operational Research, Elsevier, vol. 294(2), pages 442-452.
- Salim Rostami & Stefan Creemers & Roel Leus, 2018. "New strategies for stochastic resource-constrained project scheduling," Journal of Scheduling, Springer, vol. 21(3), pages 349-365, June.
- Creemers, Stefan, 2018. "Moments and distribution of the net present value of a serial project," European Journal of Operational Research, Elsevier, vol. 267(3), pages 835-848.
- Szmerekovsky, Joseph G. & Venkateshan, Prahalad & Simonson, Peter D., 2023. "Project scheduling under the threat of catastrophic disruption," European Journal of Operational Research, Elsevier, vol. 309(2), pages 784-794.
- Sobel, Matthew J. & Szmerekovsky, Joseph G. & Tilson, Vera, 2009. "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, Elsevier, vol. 198(3), pages 697-705, November.
- Scott A. Shane & Karl T. Ulrich, 2004. "50th Anniversary Article: Technological Innovation, Product Development, and Entrepreneurship in Management Science," Management Science, INFORMS, vol. 50(2), pages 133-144, February.
- Yangyang Liang & Nanfang Cui & Tian Wang & Erik Demeulemeester, 2019. "Robust resource-constrained max-NPV project scheduling with stochastic activity duration," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 219-254, March.
- Elmaghraby, S. E. & Ferreira, A. A. & Tavares, L. V., 2000. "Optimal start times under stochastic activity durations," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 153-164, March.
- Morvarid Rahmani & Karthik Ramachandran, 2021. "Delegating Innovation Projects with Deadline: Committed vs. Flexible Stopping," Management Science, INFORMS, vol. 67(10), pages 6317-6332, October.
- Illana Bendavid & Boaz Golany, 2011. "Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology," Annals of Operations Research, Springer, vol. 189(1), pages 25-42, September.
More about this item
Keywords
Project scheduling; Uncertainty; Net present value; Alternative technologies; Stochastic activity durations;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:242:y:2015:i:2:p:465-476. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.