A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility--a case study
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Vanteddu, Gangaraju & Chinnam, Ratna Babu & Gushikin, Oleg, 2011. "Supply chain focus dependent supplier selection problem," International Journal of Production Economics, Elsevier, vol. 129(1), pages 204-216, January.
- Thiesse, Frédéric & Fleisch, Elgar, 2008. "On the value of location information to lot scheduling in complex manufacturing processes," International Journal of Production Economics, Elsevier, vol. 112(2), pages 532-547, April.
- Julka, Nirupam & Baines, Tim & Tjahjono, Benny & Lendermann, Peter & Vitanov, Val, 2007. "A review of multi-factor capacity expansion models for manufacturing plants: Searching for a holistic decision aid," International Journal of Production Economics, Elsevier, vol. 106(2), pages 607-621, April.
- Geng, Na & Jiang, Zhibin & Chen, Feng, 2009. "Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity," European Journal of Operational Research, Elsevier, vol. 198(3), pages 899-908, November.
- Chou, Yon-Chun & Cheng, C.-T. & Yang, Feng-Cheng & Liang, Yi-Yu, 2007. "Evaluating alternative capacity strategies in semiconductor manufacturing under uncertain demand and price scenarios," International Journal of Production Economics, Elsevier, vol. 105(2), pages 591-606, February.
- Pradhan, Salil & Damodaran, Purushothaman, 2009. "Performance characterization of complex manufacturing systems with general distributions and job failures," European Journal of Operational Research, Elsevier, vol. 197(2), pages 588-598, September.
- Toly Chen, 2013. "A Systematic Cycle Time Reduction Procedure for Enhancing the Competitiveness and Sustainability of a Semiconductor Manufacturer," Sustainability, MDPI, vol. 5(11), pages 1-16, November.
- Chen-Fu Chien & Chung-Jen Kuo & Chih-Min Yu, 2020. "Tool allocation to smooth work-in-process for cycle time reduction and an empirical study," Annals of Operations Research, Springer, vol. 290(1), pages 1009-1033, July.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:100:y:2006:i:2:p:300-313. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.