Analytical approximations to predict performance measures of manufacturing systems with general distributions, job failures and parallel processing
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2012.03.013
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Hulett, Maria & Damodaran, Purushothaman, 2011. "Analytical approximations to predict performance measures of markovian type manufacturing systems with job failures and parallel processing," European Journal of Operational Research, Elsevier, vol. 212(1), pages 89-99, July.
- S. Saboo & L. Wang & W. E. Wilhelm, 1989. "Recursion Models for Describing and Managing the Transient Flow of Materials in Generalized Flowlines," Management Science, INFORMS, vol. 35(6), pages 722-742, June.
- Pradhan, Salil & Damodaran, Purushothaman, 2009. "Performance characterization of complex manufacturing systems with general distributions and job failures," European Journal of Operational Research, Elsevier, vol. 197(2), pages 588-598, September.
- Bitran, G. R. & Sarkar, D., 1994. "Throughput analysis in manufacturing networks," European Journal of Operational Research, Elsevier, vol. 74(3), pages 448-465, May.
- Pradhan, Salil & Damodaran, Purushothaman & Srihari, Krishnaswami, 2008. "Predicting performance measures for Markovian type of manufacturing systems with product failures," European Journal of Operational Research, Elsevier, vol. 184(2), pages 725-744, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hulett, Maria & Damodaran, Purushothaman, 2011. "Analytical approximations to predict performance measures of markovian type manufacturing systems with job failures and parallel processing," European Journal of Operational Research, Elsevier, vol. 212(1), pages 89-99, July.
- Shraga Shoval & Mahmoud Efatmaneshnik & Michael J. Ryan, 2017. "Assembly sequence planning for processes with heterogeneous reliabilities," International Journal of Production Research, Taylor & Francis Journals, vol. 55(10), pages 2806-2828, May.
- Pradhan, Salil & Damodaran, Purushothaman & Srihari, Krishnaswami, 2008. "Predicting performance measures for Markovian type of manufacturing systems with product failures," European Journal of Operational Research, Elsevier, vol. 184(2), pages 725-744, January.
- Wu, Kan & McGinnis, Leon, 2012. "Performance evaluation for general queueing networks in manufacturing systems: Characterizing the trade-off between queue time and utilization," European Journal of Operational Research, Elsevier, vol. 221(2), pages 328-339.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Karimi-Mamaghan, Maryam & Mohammadi, Mehrdad & Jula, Payman & Pirayesh, Amir & Ahmadi, Hadi, 2020. "A learning-based metaheuristic for a multi-objective agile inspection planning model under uncertainty," European Journal of Operational Research, Elsevier, vol. 285(2), pages 513-537.
- Bretthauer, Kurt M. & Cote, Murray J., 1997. "Nonlinear programming for multiperiod capacity planning in a manufacturing system," European Journal of Operational Research, Elsevier, vol. 96(1), pages 167-179, January.
- Tito Homem-de-Mello & Alexander Shapiro & Mark L. Spearman, 1999. "Finding Optimal Material Release Times Using Simulation-Based Optimization," Management Science, INFORMS, vol. 45(1), pages 86-102, January.
- Bitran, Gabriel R. & Morabito, Reinaldo., 1994. "Open queueing networks : optimization and performance evaluation models for discrete manufacturing systems," Working papers 3743-94., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
- Sarker, Bhaba R. & Wilhelm, Wilbert E. & Hogg, Gary L. & Han, Min-Hong, 1995. "Backtracking of jobs in one-dimensional machine location problems," European Journal of Operational Research, Elsevier, vol. 85(3), pages 593-609, September.
- Liu, Jialu & Yang, Sheng & Wu, Aiguo & Hu, S. Jack, 2012. "Multi-state throughput analysis of a two-stage manufacturing system with parallel unreliable machines and a finite buffer," European Journal of Operational Research, Elsevier, vol. 219(2), pages 296-304.
- Thomas, Douglas J. & Griffin, Paul M., 1996. "Coordinated supply chain management," European Journal of Operational Research, Elsevier, vol. 94(1), pages 1-15, October.
- Pradhan, Salil & Damodaran, Purushothaman, 2009. "Performance characterization of complex manufacturing systems with general distributions and job failures," European Journal of Operational Research, Elsevier, vol. 197(2), pages 588-598, September.
- Gong, Dijin & Yamazaki, Genji & Gen, Mitsuo & Xu, Weixuan, 1999. "A genetic algorithm method for one-dimensional machine location problems," International Journal of Production Economics, Elsevier, vol. 60(1), pages 337-342, April.
More about this item
Keywords
Parametric decomposition; Queuing network; Web server assembly; Fork and join queues; General distributions;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:221:y:2012:i:1:p:74-86. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.