Insertion of a random task in a schedule: a real-time approach
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Orman, A. J. & Potts, C. N. & Shahani, A. K. & Moore, A. R., 1996. "Scheduling for a multifunction phased array radar system," European Journal of Operational Research, Elsevier, vol. 90(1), pages 13-25, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chauhan, Satyaveer S. & Gordon, Valery & Proth, Jean-Marie, 2007. "Scheduling in supply chain environment," European Journal of Operational Research, Elsevier, vol. 183(3), pages 961-970, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- József Békési & Gábor Galambos & Michael Jung & Marcus Oswald & Gerhard Reinelt, 2014. "A branch-and-bound algorithm for the coupled task problem," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 80(1), pages 47-81, August.
- Zhang, Haowei & Xie, Junwei & Ge, Jiaang & Zhang, Zhaojian & Zong, Binfeng, 2019. "A hybrid adaptively genetic algorithm for task scheduling problem in the phased array radar," European Journal of Operational Research, Elsevier, vol. 272(3), pages 868-878.
- Haowei Zhang & Junwei Xie & Qiyong Hu & Zhaojian Zhang & Binfeng Zong, 2019. "Online pulse interleaving task scheduling for multifunction radar," Journal of Scheduling, Springer, vol. 22(2), pages 183-192, April.
- Bo Chen & Xiandong Zhang, 2021. "Scheduling coupled tasks with exact delays for minimum total job completion time," Journal of Scheduling, Springer, vol. 24(2), pages 209-221, April.
- Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2020. "Coupled task scheduling with exact delays: Literature review and models," European Journal of Operational Research, Elsevier, vol. 282(1), pages 19-39.
- Békési, József & Dósa, György & Galambos, Gábor, 2022. "A first Fit type algorithm for the coupled task scheduling problem with unit execution time and two exact delays," European Journal of Operational Research, Elsevier, vol. 297(3), pages 844-852.
- C N Potts & J D Whitehead, 2007. "Heuristics for a coupled-operation scheduling problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1375-1388, October.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:164:y:2005:i:1:p:52-63. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.