Performance analysis of assembly systems with unreliable machines and finite buffers
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Liu, Xiao-Gao & Buzacott, John A., 1990. "Approximate models of assembly systems with finite inventory banks," European Journal of Operational Research, Elsevier, vol. 45(2-3), pages 143-154, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yi‐Chun Tsai & Nilay Tanık Argon, 2008. "Dynamic server assignment policies for assembly‐type queues with flexible servers," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(3), pages 234-251, April.
- Zhang, Yongjin & Zhao, Ming & Zhang, Yanjun & Pan, Ruilin & Cai, Jing, 2020. "Dynamic and steady-state performance analysis for multi-state repairable reconfigurable manufacturing systems with buffers," European Journal of Operational Research, Elsevier, vol. 283(2), pages 491-510.
- Sabry Shaaban & Rodrigo Romero-Silva, 2021. "Performance of merging lines with uneven buffer capacity allocation: the effects of unreliability under different inventory-related costs," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1253-1288, December.
- Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
- Dhouib, K. & Gharbi, A. & Landolsi, N., 2009. "Throughput assessment of mixed-model flexible transfer lines with unreliable machines," International Journal of Production Economics, Elsevier, vol. 122(2), pages 619-627, December.
- Liu, Liming & Yuan, Xue-Ming, 2001. "Throughput, flow times, and service level in an unreliable assembly system," European Journal of Operational Research, Elsevier, vol. 135(3), pages 602-615, December.
- Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:161:y:2005:i:3:p:854-871. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.