Yield information and supplier responsiveness in remanufacturing operations
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Parlar, Mahmut & Wang, Dan, 1993. "Diversification under yield randomness in inventory models," European Journal of Operational Research, Elsevier, vol. 66(1), pages 52-64, April.
- van der Laan, Erwin & Salomon, Marc, 1997. "Production planning and inventory control with remanufacturing and disposal," European Journal of Operational Research, Elsevier, vol. 102(2), pages 264-278, October.
- Mordechai I. Henig & Nissan Levin, 1992. "Joint Production Planning and Product Delivery Commitments with Random Yield," Operations Research, INFORMS, vol. 40(2), pages 404-409, April.
- Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
- Ferrer, Geraldo & Ayres, Robert U., 2000. "The impact of remanufacturing in the economy," Ecological Economics, Elsevier, vol. 32(3), pages 413-429, March.
- Ayres, Robert & Ferrer, Geraldo & Van Leynseele, Tania, 1997. "Eco-efficiency, asset recovery and remanufacturing," European Management Journal, Elsevier, vol. 15(5), pages 557-574, October.
- Christopher S. Tang, 1990. "The Impact of Uncertainty on a Production Line," Management Science, INFORMS, vol. 36(12), pages 1518-1531, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Tagaras, George & Zikopoulos, Christos, 2008. "Optimal location and value of timely sorting of used items in a remanufacturing supply chain with multiple collection sites," International Journal of Production Economics, Elsevier, vol. 115(2), pages 424-432, October.
- Hsieh, Chung-Chi & Lathifah, Artya, 2022. "Ordering and waste reuse decisions in a make-to-order system under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1290-1303.
- Muris Lage Junior & Moacir Godinho Filho, 2017. "Master disassembly scheduling in a remanufacturing system with stochastic routings," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 25(1), pages 123-138, March.
- Zikopoulos, Christos & Tagaras, George, 2015. "Reverse supply chains: Effects of collection network and returns classification on profitability," European Journal of Operational Research, Elsevier, vol. 246(2), pages 435-449.
- Kleber, Rainer & Reimann, Marc & Souza, Gilvan C. & Zhang, Weihua, 2020. "Two-sided competition with vertical differentiation in both acquisition and sales in remanufacturing," European Journal of Operational Research, Elsevier, vol. 284(2), pages 572-587.
- Kleber, Rainer & Quariguasi Frota Neto, João & Reimann, Marc, 2023. "The role of part failure rates asymmetry and spare part proprietariness on remanufacturing decision making," European Journal of Operational Research, Elsevier, vol. 310(1), pages 185-200.
- Qiang, Qiang & Ke, Ke & Anderson, Trisha & Dong, June, 2013. "The closed-loop supply chain network with competition, distribution channel investment, and uncertainties," Omega, Elsevier, vol. 41(2), pages 186-194.
- Ondemir, Onder & Gupta, Surendra M., 2014. "A multi-criteria decision making model for advanced repair-to-order and disassembly-to-order system," European Journal of Operational Research, Elsevier, vol. 233(2), pages 408-419.
- Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
- BayIndIr, Z. Pelin & Dekker, Rommert & Porras, Eric, 2006.
"Determination of recovery effort for a probabilistic recovery system under various inventory control policies,"
Omega, Elsevier, vol. 34(6), pages 571-584, December.
- Bayindir, Z.P. & Dekker, R. & Porras Musalem, E., 2004. "Determination of recovery effort for a probabilistic recovery system under various inventory control policies," Econometric Institute Research Papers EI 2004-08, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Sunder Kekre & Uday S. Rao & Jayashankar M. Swaminathan & Jun Zhang, 2003. "Reconfiguring a Remanufacturing Line at Visteon, Mexico," Interfaces, INFORMS, vol. 33(6), pages 30-43, December.
- Juan Pedro Sepúlveda-Rojas & Rodrigo Ternero, 2020. "Analysis of the Value of Information and Coordination in a Dyadic Closed Loop Supply Chain," Sustainability, MDPI, vol. 12(20), pages 1-18, October.
- Zikopoulos, Christos & Tagaras, George, 2007. "Impact of uncertainty in the quality of returns on the profitability of a single-period refurbishing operation," European Journal of Operational Research, Elsevier, vol. 182(1), pages 205-225, October.
- DINGA Emil, 2018. "On An Increasingly Yield Curve Of Knowledge," Studies in Business and Economics, Lucian Blaga University of Sibiu, Faculty of Economic Sciences, vol. 13(3), pages 13-25, December.
- Ruiz-Benítez, Rocío & Ketzenberg, Michael & van der Laan, Erwin A., 2014. "Managing consumer returns in high clockspeed industries," Omega, Elsevier, vol. 43(C), pages 54-63.
- Bayindir, Z.P. & Teunter, R.H. & Dekker, R., 2005. "A comparison of inventory control policies for a joint manufacturing/Remanufacturing environment with remanufacturing yield loss," Econometric Institute Research Papers EI 2005-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Mukhopadhyay, Samar K. & Ma, Huafan, 2009. "Joint procurement and production decisions in remanufacturing under quality and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 120(1), pages 5-17, July.
- Panagiotidou, Sofia & Nenes, George & Zikopoulos, Christos & Tagaras, George, 2017. "Joint optimization of manufacturing/remanufacturing lot sizes under imperfect information on returns quality," European Journal of Operational Research, Elsevier, vol. 258(2), pages 537-551.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Zikopoulos, Christos & Tagaras, George, 2007. "Impact of uncertainty in the quality of returns on the profitability of a single-period refurbishing operation," European Journal of Operational Research, Elsevier, vol. 182(1), pages 205-225, October.
- Saurabh Bansal & Mahesh Nagarajan, 2017. "Product Portfolio Management with Production Flexibility in Agribusiness," Operations Research, INFORMS, vol. 65(4), pages 914-930, August.
- Woonghee Tim Huh & Mahesh Nagarajan, 2010. "Technical note ---Linear Inflation Rules for the Random Yield Problem: Analysis and Computations," Operations Research, INFORMS, vol. 58(1), pages 244-251, February.
- Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
- Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
- Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
- Yixuan Xiao, 2020. "Horizontal Mergers under Yield Uncertainty," Production and Operations Management, Production and Operations Management Society, vol. 29(1), pages 24-34, January.
- Burak Kazaz, 2004. "Production Planning Under Yield and Demand Uncertainty with Yield-Dependent Cost and Price," Manufacturing & Service Operations Management, INFORMS, vol. 6(3), pages 209-224, October.
- Asli Sencer Erdem & Mehmet Murat Fadilog̃lu & Süleyman Özekici, 2006. "An EOQ model with multiple suppliers and random capacity," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(1), pages 101-114, February.
- Seung Hwan Jung, 2020. "Offshore versus Onshore Sourcing: Quick Response, Random Yield, and Competition," Production and Operations Management, Production and Operations Management Society, vol. 29(3), pages 750-766, March.
- Awi Federgruen & Nan Yang, 2008. "Selecting a Portfolio of Suppliers Under Demand and Supply Risks," Operations Research, INFORMS, vol. 56(4), pages 916-936, August.
- Xue, Weili & Choi, Tsan-Ming & Ma, Lijun, 2016. "Diversification strategy with random yield suppliers for a mean–variance risk-sensitive manufacturer," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 90(C), pages 90-107.
- L. Gong & H. Matsuo, 1997. "Control Policy for a Manufacturing System with Random Yield and Rework," Journal of Optimization Theory and Applications, Springer, vol. 95(1), pages 149-175, October.
- V. Daniel R. Guide & Vaidyanathan Jayaraman & Rajesh Srivastava & W. C. Benton, 2000. "Supply-Chain Management for Recoverable Manufacturing Systems," Interfaces, INFORMS, vol. 30(3), pages 125-142, June.
- Shanshan Hu & Gilvan C. Souza & Mark E. Ferguson & Wenbin Wang, 2015. "Capacity Investment in Renewable Energy Technology with Supply Intermittency: Data Granularity Matters!," Manufacturing & Service Operations Management, INFORMS, vol. 17(4), pages 480-494, October.
- Allwood, Julian M. & Ashby, Michael F. & Gutowski, Timothy G. & Worrell, Ernst, 2011. "Material efficiency: A white paper," Resources, Conservation & Recycling, Elsevier, vol. 55(3), pages 362-381.
- Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
- Bayindir, Z.P. & Erkip, N. & Gullu, R., 2003. "Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint," Econometric Institute Research Papers EI 2003-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Z P Bayındır & N Erkip & R Güllü, 2005. "Assessing the benefits of remanufacturing option under one-way substitution," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 286-296, March.
- Laslo, Zohar & Gurevich, Gregory & Keren, Baruch, 2009. "Economic distribution of budget among producers for fulfilling orders under delivery chance constraints," International Journal of Production Economics, Elsevier, vol. 122(2), pages 656-662, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:149:y:2003:i:3:p:540-556. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.