IDEAS home Printed from https://ideas.repec.org/a/spr/joptap/v95y1997i1d10.1023_a1022639529617.html
   My bibliography  Save this article

Control Policy for a Manufacturing System with Random Yield and Rework

Author

Listed:
  • L. Gong

    (Louisiana State University)

  • H. Matsuo

    (University of Texas at Austin)

Abstract

We develop a production policy that controls work-in-process (WIP) levels and satisfies demand in a multistage manufacturing system with significant uncertainty in yield, rework, and demand. The problem addressed in this paper is more general than those in the literature in three aspects: (i) multiple products are processed at multiple workstations, and the capacity of each workstation is limited and shared by multiple operations; (ii) the behavior of a production policy is investigated over an infinite-time horizon, and thus the system stability can be evaluated; (iii) the representation of yield and rework uncertainty is generalized. Generalizing both the system structure and the nature of uncertainty requires a new mathematical development in the theory of infinite-horizon stochastic dynamic programming. The theoretical contributions of this paper are the existence proofs of the optimal stationary control for a stochastic dynamic programming problem and the finite covariances of WIP and production levels under the general expression of uncertainty. We develop a simple and explicit sufficient condition that guarantees the existence of both the optimal stationary control and the system stability. We describe how a production policy can be constructed for the manufacturing system based on the propositions derived.

Suggested Citation

  • L. Gong & H. Matsuo, 1997. "Control Policy for a Manufacturing System with Random Yield and Rework," Journal of Optimization Theory and Applications, Springer, vol. 95(1), pages 149-175, October.
  • Handle: RePEc:spr:joptap:v:95:y:1997:i:1:d:10.1023_a:1022639529617
    DOI: 10.1023/A:1022639529617
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1023/A:1022639529617
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1023/A:1022639529617?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Candace Arai Yano & Hau L. Lee, 1995. "Lot Sizing with Random Yields: A Review," Operations Research, INFORMS, vol. 43(2), pages 311-334, April.
    2. Eric V. Denardo & Christopher S. Tang, 1992. "Linear Control of a Markov Production System," Operations Research, INFORMS, vol. 40(2), pages 259-278, April.
    3. Ram Akella & S. Rajagopalan & Medini R. Singh, 1992. "Part Dispatch in Random Yield Multistage Flexible Test Systems for Printed Circuit Boards," Operations Research, INFORMS, vol. 40(4), pages 776-789, August.
    4. Susan L. Albin & David J. Friedman, 1989. "The Impact of Clustered Defect Distributions in IC Fabrication," Management Science, INFORMS, vol. 35(9), pages 1066-1078, September.
    5. Christopher S. Tang, 1990. "The Impact of Uncertainty on a Production Line," Management Science, INFORMS, vol. 36(12), pages 1518-1531, December.
    6. Hau L. Lee & Candace Arai Yano, 1988. "Production Control in Multistage Systems with Variable Yield Losses," Operations Research, INFORMS, vol. 36(2), pages 269-278, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bordoloi, Sanjeev & Guerrero, Hector H., 2008. "Design for control: A new perspective on process and product innovation," International Journal of Production Economics, Elsevier, vol. 113(1), pages 346-358, May.
    2. Bordoloi, Sanjeev K. & Matsuo, Hirofumi, 2001. "Human resource planning in knowledge-intensive operations: A model for learning with stochastic turnover," European Journal of Operational Research, Elsevier, vol. 130(1), pages 169-189, April.
    3. Tang, Christopher S., 2006. "Perspectives in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 103(2), pages 451-488, October.
    4. Sanjeev Bordoloi, 2006. "A control rule for recruitment planning in engineering consultancy," Journal of Productivity Analysis, Springer, vol. 26(2), pages 147-163, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. G C Hadjinicola, 2010. "Manufacturing costs in serial production systems with rework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 342-351, February.
    2. Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
    3. Juhwen Hwang & Medini R. Singh, 1998. "Optimal Production Policies for Multi-Stage Systems with Setup Costs and Uncertain Capacities," Management Science, INFORMS, vol. 44(9), pages 1279-1294, September.
    4. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
    5. Qing Li & Shaohui Zheng, 2006. "Joint Inventory Replenishment and Pricing Control for Systems with Uncertain Yield and Demand," Operations Research, INFORMS, vol. 54(4), pages 696-705, August.
    6. Pham, An & Jin, Tongdan & Novoa, Clara & Qin, Jin, 2019. "A multi-site production and microgrid planning model for net-zero energy operations," International Journal of Production Economics, Elsevier, vol. 218(C), pages 260-274.
    7. Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
    8. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
    9. Abraham Grosfeld-Nir & Yigal Gerchak, 2002. "Multistage Production to Order with Rework Capability," Management Science, INFORMS, vol. 48(5), pages 652-664, May.
    10. Pollock, Stephen M. & Golhar, Damodar, 1998. "The canning problem revisited: The case of capacitated production and fixed demand," European Journal of Operational Research, Elsevier, vol. 105(3), pages 475-482, March.
    11. Burak Kazaz, 2004. "Production Planning Under Yield and Demand Uncertainty with Yield-Dependent Cost and Price," Manufacturing & Service Operations Management, INFORMS, vol. 6(3), pages 209-224, October.
    12. Asli Sencer Erdem & Mehmet Murat Fadilog̃lu & Süleyman Özekici, 2006. "An EOQ model with multiple suppliers and random capacity," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(1), pages 101-114, February.
    13. Bardia Kamrad & Keith Ord, 2006. "Market risk and process uncertainty in production operations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(7), pages 627-640, October.
    14. Michael J. Fry & Michael J. Magazine & Uday S. Rao, 2006. "Firefighter Staffing Including Temporary Absences and Wastage," Operations Research, INFORMS, vol. 54(2), pages 353-365, April.
    15. Xu, He, 2010. "Managing production and procurement through option contracts in supply chains with random yield," International Journal of Production Economics, Elsevier, vol. 126(2), pages 306-313, August.
    16. Weng, Z. Kevin, 1998. "Managing production with flexible capacity deployment for serial multi-stage manufacturing systems," European Journal of Operational Research, Elsevier, vol. 109(3), pages 587-598, September.
    17. M-C Wu & L-C Huang & H-M Hsu & T-S Su, 2011. "Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 1075-1084, June.
    18. Ferrer, Geraldo, 2003. "Yield information and supplier responsiveness in remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 149(3), pages 540-556, September.
    19. Awi Federgruen & Nan Yang, 2014. "Infinite Horizon Strategies for Replenishment Systems with a General Pool of Suppliers," Operations Research, INFORMS, vol. 62(1), pages 141-159, February.
    20. Abdel-Malek, Layek & Montanari, Roberto & Meneghetti, Diego, 2008. "The capacitated newsboy problem with random yield: The Gardener Problem," International Journal of Production Economics, Elsevier, vol. 115(1), pages 113-127, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joptap:v:95:y:1997:i:1:d:10.1023_a:1022639529617. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.