Transient throughput analysis for a series type system of machines in terms of alternating renewal processes
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Tan, Baris, 1997. "Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures," European Journal of Operational Research, Elsevier, vol. 101(3), pages 560-576, September.
- Hong, Yushin & Seong, Deokhyun, 1993. "The analysis of an unreliable two-machine production line with random processing times," European Journal of Operational Research, Elsevier, vol. 68(2), pages 228-235, July.
- Heavey, C. & Papadopoulos, H. T. & Browne, J., 1993. "The throughput rate of multistation unreliable production lines," European Journal of Operational Research, Elsevier, vol. 68(1), pages 69-89, July.
- Kevin B. Hendricks & John O. McClain, 1993. "The Output Process of Serial Production Lines of General Machines with Finite Buffers," Management Science, INFORMS, vol. 39(10), pages 1194-1201, October.
- Tan, Bar[iota]s, 1999. "Variance of the output as a function of time: Production line dynamics," European Journal of Operational Research, Elsevier, vol. 117(3), pages 470-484, September.
- Berman, Oded, 1982. "Efficiency and production rate of a transfer line with two machines and a finite storage buffer," European Journal of Operational Research, Elsevier, vol. 9(3), pages 295-308, March.
- Kevin B. Hendricks, 1992. "The Output Processes of Serial Production Lines of Exponential Machines with Finite Buffers," Operations Research, INFORMS, vol. 40(6), pages 1139-1147, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Farhood Rismanchian & Young Hoon Lee, 2018. "Moment-based approximations for first- and second-order transient performance measures of an unreliable workstation," Operational Research, Springer, vol. 18(1), pages 75-95, April.
- Dhouib, K. & Gharbi, A. & Landolsi, N., 2009. "Throughput assessment of mixed-model flexible transfer lines with unreliable machines," International Journal of Production Economics, Elsevier, vol. 122(2), pages 619-627, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hautphenne, Sophie & Kerner, Yoav & Nazarathy, Yoni & Taylor, Peter, 2015. "The intercept term of the asymptotic variance curve for some queueing output processes," European Journal of Operational Research, Elsevier, vol. 242(2), pages 455-464.
- Elisa Gebennini & Andrea Grassi & Cesare Fantuzzi & Stanley Gershwin & Irvin Schick, 2013. "Discrete time model for two-machine one-buffer transfer lines with restart policy," Annals of Operations Research, Springer, vol. 209(1), pages 41-65, October.
- Tan, Baris, 1997. "Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures," European Journal of Operational Research, Elsevier, vol. 101(3), pages 560-576, September.
- Lutz, Christian M. & Roscoe Davis, K. & Sun, Minghe, 1998. "Determining buffer location and size in production lines using tabu search," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 301-316, April.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- G C Hadjinicola, 2010. "Manufacturing costs in serial production systems with rework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 342-351, February.
- Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
- Tan, Baris, 1998. "Effects of variability on the due-time performance of a continuous materials flow production system in series," International Journal of Production Economics, Elsevier, vol. 54(1), pages 87-100, January.
- Papadopoulos, H. T., 1998. "An approximate method for calculating the mean sojourn time of K-station production lines with no intermediate buffers," International Journal of Production Economics, Elsevier, vol. 54(3), pages 297-305, May.
- Farhood Rismanchian & Young Hoon Lee, 2018. "Moment-based approximations for first- and second-order transient performance measures of an unreliable workstation," Operational Research, Springer, vol. 18(1), pages 75-95, April.
- Lee, S. D. & Rung, J. M., 2000. "Production lot sizing in failure prone two-stage serial systems," European Journal of Operational Research, Elsevier, vol. 123(1), pages 42-60, May.
- He, Xin-Feng & Wu, Su & Li, Quan-Lin, 2007. "Production variability of production lines," International Journal of Production Economics, Elsevier, vol. 107(1), pages 78-87, May.
- Eva K. Lee & Siddhartha Maheshwary & Jacquelyn Mason & William Glisson, 2006. "Large-Scale Dispensing for Emergency Response to Bioterrorism and Infectious-Disease Outbreak," Interfaces, INFORMS, vol. 36(6), pages 591-607, December.
- Konstantinos S. Boulas & Georgios D. Dounias & Chrissoleon T. Papadopoulos, 2023. "A hybrid evolutionary algorithm approach for estimating the throughput of short reliable approximately balanced production lines," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 823-852, February.
- Kleijnen, J.P.C. & Gaury, E.G.A., 2000.
"Short-Term Robustness of Production Management Systems : New Methodology,"
Other publications TiSEM
984854b7-9f75-4b46-a279-2, Tilburg University, School of Economics and Management.
- Kleijnen, J.P.C. & Gaury, E.G.A., 2000. "Short-Term Robustness of Production Management Systems : New Methodology," Discussion Paper 2000-29, Tilburg University, Center for Economic Research.
- Dauzère-Pérès, Stéphane & Hassoun, Michael, 2020. "On the importance of variability when managing metrology capacity," European Journal of Operational Research, Elsevier, vol. 282(1), pages 267-276.
- Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
- Mehmet Savsar, 2016. "Reliability and availability analysis of a manufacturing line system," Journal of Applied and Physical Sciences, Prof. Vakhrushev Alexander, vol. 2(3), pages 96-106.
- Sabry Shaaban & Tom Mcnamara & Sarah Hudson, 2015. "The impact of failure, repair and joint imbalance of processing time means & buffer sizes on the performance of unpaced production lines," Post-Print hal-01205567, HAL.
- Manafzadeh Dizbin, Nima & Tan, Barış, 2020. "Optimal control of production-inventory systems with correlated demand inter-arrival and processing times," International Journal of Production Economics, Elsevier, vol. 228(C).
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:155:y:2004:i:1:p:178-197. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.