IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v105y1998i1p130-142.html
   My bibliography  Save this article

Neural network as a simulation metamodel in economic analysis of risky projects

Author

Listed:
  • Badiru, Adedeji B.
  • Sieger, David B.

Abstract

No abstract is available for this item.

Suggested Citation

  • Badiru, Adedeji B. & Sieger, David B., 1998. "Neural network as a simulation metamodel in economic analysis of risky projects," European Journal of Operational Research, Elsevier, vol. 105(1), pages 130-142, February.
  • Handle: RePEc:eee:ejores:v:105:y:1998:i:1:p:130-142
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(97)00029-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Mehrez, A & Enrick, NL, 1989. "The meta-model of OR/MS," Omega, Elsevier, vol. 17(5), pages 419-435.
    2. Elmaghraby, Salah E., 1990. "Project bidding under deterministic and probabilistic activity durations," European Journal of Operational Research, Elsevier, vol. 49(1), pages 14-34, November.
    3. Acácio M. De O. Porta Nova & James R. Wilson, 1989. "Estimation of Multiresponse Simulation Metamodels Using Control Variates," Management Science, INFORMS, vol. 35(11), pages 1316-1333, November.
    4. Rotmans, J. & Vrieze, O. J., 1990. "Metamodelling and experimental design: Case study of the greenhouse effect," European Journal of Operational Research, Elsevier, vol. 47(3), pages 317-329, August.
    5. A. Ravindran & B. L. Foote & A. B. Badiru & L. M. Leemis & Larry Williams, 1989. "An Application of Simulation and Network Analysis to Capacity Planning and Material Handling Systems at Tinker Air Force Base," Interfaces, INFORMS, vol. 19(1), pages 102-115, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yang Changwei & Li Zonghao & Guo Xueyan & Yu Wenying & Jin Jing & Zhu Liang, 2019. "Application of BP Neural Network Model in Risk Evaluation of Railway Construction," Complexity, Hindawi, vol. 2019, pages 1-12, June.
    2. Chambers, M. & Mount-Campbell, C. A., 2002. "Process optimization via neural network metamodeling," International Journal of Production Economics, Elsevier, vol. 79(2), pages 93-100, September.
    3. Angelini, Eliana & di Tollo, Giacomo & Roli, Andrea, 2008. "A neural network approach for credit risk evaluation," The Quarterly Review of Economics and Finance, Elsevier, vol. 48(4), pages 733-755, November.
    4. Reis dos Santos, Pedro M. & Isabel Reis dos Santos, M., 2009. "Using subsystem linear regression metamodels in stochastic simulation," European Journal of Operational Research, Elsevier, vol. 196(3), pages 1031-1040, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shi Chen & Hau Lee, 2017. "Incentive Alignment and Coordination of Project Supply Chains," Management Science, INFORMS, vol. 63(4), pages 1011-1025, April.
    2. Meloni, Carlo & Pranzo, Marco & Samà, Marcella, 2021. "Risk of delay evaluation in real-time train scheduling with uncertain dwell times," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 152(C).
    3. Tew, Jeffrey D., 1995. "Simulation metamodel estimation using a combined correlation-based variance reduction technique for first and higher-order metamodels," European Journal of Operational Research, Elsevier, vol. 87(2), pages 349-367, December.
    4. Athanassios N. Avramidis & Kenneth W. Bauer & James R. Wilson, 1991. "Simulation of stochastic activity networks using path control variates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 183-201, April.
    5. Kenneth W. Bauer & James R. Wilson, 1992. "Control‐variate selection criteria," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(3), pages 307-321, April.
    6. Genaro Gutierrez & Anand Paul, 2000. "Analysis of the Effects of Uncertainty, Risk-Pooling, and Subcontracting Mechanisms on Project Performance," Operations Research, INFORMS, vol. 48(6), pages 927-938, December.
    7. Bettonvil, Bert & del Castillo, Enrique & Kleijnen, Jack P.C., 2009. "Statistical testing of optimality conditions in multiresponse simulation-based optimization," European Journal of Operational Research, Elsevier, vol. 199(2), pages 448-458, December.
    8. Bettonvil, B.W.M. & Del Castillo, E. & Kleijnen, J.P.C., 2007. "Statistical Testing of Optimality Conditions in Multiresponse Simulation-based Optimization (Revision of 2005-81)," Discussion Paper 2007-45, Tilburg University, Center for Economic Research.
    9. Yang, Kum Khiong & Tay, Lee Choo & Sum, Chee Chuong, 1995. "A comparison of stochastic scheduling rules for maximizing project net present value," European Journal of Operational Research, Elsevier, vol. 85(2), pages 327-339, September.
    10. Kimms, Alf, 1999. "Lagrangean relaxation for scheduling projects under resource constraints to maximize the net present value," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 504, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    11. Kolisch, R. & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Omega, Elsevier, vol. 29(3), pages 249-272, June.
    12. Elmaghraby, Salah E., 1995. "Activity nets: A guided tour through some recent developments," European Journal of Operational Research, Elsevier, vol. 82(3), pages 383-408, May.
    13. Williams, Terry, 1995. "A classified bibliography of recent research relating to project risk management," European Journal of Operational Research, Elsevier, vol. 85(1), pages 18-38, August.
    14. Jiao Wang & Kai Yang & Ruiqing Zhao, 2017. "The impact of decision criteria on deadline-based incentive contracts in project management," Journal of Intelligent Manufacturing, Springer, vol. 28(3), pages 643-655, March.
    15. Mehrez, Abraham, 1997. "The interface between OR/MS and decision theory," European Journal of Operational Research, Elsevier, vol. 99(1), pages 38-47, May.
    16. Reis dos Santos, M. Isabel & Porta Nova, Acacio M.O., 2006. "Statistical fitting and validation of non-linear simulation metamodels: A case study," European Journal of Operational Research, Elsevier, vol. 171(1), pages 53-63, May.
    17. Carlo Meloni & Marco Pranzo, 2020. "Expected shortfall for the makespan in activity networks under imperfect information," Flexible Services and Manufacturing Journal, Springer, vol. 32(3), pages 668-692, September.
    18. Paul, Anand & Gutierrez, Genaro, 2005. "Simple probability models for project contracting," European Journal of Operational Research, Elsevier, vol. 165(2), pages 329-338, September.
    19. Baustert, Paul & Othoniel, Benoit & Rugani, Benedetto & Leopold, Ulrich, 2018. "Uncertainty analysis in integrated environmental models for ecosystem service assessments: Frameworks, challenges and gaps," Ecosystem Services, Elsevier, vol. 33(PB), pages 110-123.
    20. Huan Neng Chiu & Deng Maw Tsai, 2002. "An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows," Construction Management and Economics, Taylor & Francis Journals, vol. 20(1), pages 55-66.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:105:y:1998:i:1:p:130-142. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.