'Time-to-build' completion patterns for nonresidential structures, 1961-1991
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Victor Zarnowitz, 1973. "Orders, Production, and Investment: A Cyclical and Structural Analysis," NBER Books, National Bureau of Economic Research, Inc, number zarn73-1, June.
- Ben S. Bernanke, 1983.
"Irreversibility, Uncertainty, and Cyclical Investment,"
The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 98(1), pages 85-106.
- Ben S. Bernanke, 1980. "Irreversibility, Uncertainty, and Cyclical Investment," NBER Working Papers 0502, National Bureau of Economic Research, Inc.
- Robert E. Hall, 1977. "Investment, Interest Rates, and the Effects of Stabilization Policies," Brookings Papers on Economic Activity, Economic Studies Program, The Brookings Institution, vol. 8(1), pages 61-122.
- Kydland, Finn E & Prescott, Edward C, 1982.
"Time to Build and Aggregate Fluctuations,"
Econometrica, Econometric Society, vol. 50(6), pages 1345-1370, November.
- Finn E. Kydland & Edward C. Prescott, 1982. "Executable program for "Time to Build and Aggregate Fluctuations"," QM&RBC Codes 4, Quantitative Macroeconomics & Real Business Cycles.
- Finn E. Kydland & Edward C. Prescott, 1982. "Web interface for "Time to Build and Aggregate Fluctuations"," QM&RBC Codes 4a, Quantitative Macroeconomics & Real Business Cycles.
- Gordon, Stephen, 1992. "Costs of Adjustment, the Aggregation Problem and Investment," The Review of Economics and Statistics, MIT Press, vol. 74(3), pages 422-429, August.
- Pindyck, Robert S, 1991.
"Irreversibility, Uncertainty, and Investment,"
Journal of Economic Literature, American Economic Association, vol. 29(3), pages 1110-1148, September.
- Pindyck, Robert, 1989. "Irreversibility, uncertainty, and investment," Policy Research Working Paper Series 294, The World Bank.
- Pindyck, Robert S., 1990. "Irreversibility, uncertainty, and investment," Working papers 3137-90., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Robert S. Pindyck, 1990. "Irreversibility, Uncertainty, and Investment," NBER Working Papers 3307, National Bureau of Economic Research, Inc.
- Roger W. Garrison, 1992. "The Limits of Macroeconomics," Cato Journal, Cato Journal, Cato Institute, vol. 12(1), pages 165-178, Spring/Su.
- Jorgenson, Dale W, 1971. "Econometric Studies of Investment Behavior: A Survey," Journal of Economic Literature, American Economic Association, vol. 9(4), pages 1111-1147, December.
- Montgomery, Michael R., 1995. "Capital complementarity, time-to-build, and the persistence of investment starts," Journal of Macroeconomics, Elsevier, vol. 17(2), pages 187-205.
- Altug, Sumru, 1993. "Time-to-Build, Delivery Lags, and the Equilibrium Pricing of Capital Goods," Journal of Money, Credit and Banking, Blackwell Publishing, vol. 25(3), pages 301-319, August.
- Lawrence, Colin & Siow, Aloysius, 1985. "Interest Rates and Investment Spending: Some Empirical Evidence for Postwar U.S. Producer Equipment, 1947-1980," The Journal of Business, University of Chicago Press, vol. 58(4), pages 359-375, October.
- Altug, Sumru, 1989.
"Time-to-Build and Aggregate Fluctuations: Some New Evidence,"
International Economic Review, Department of Economics, University of Pennsylvania and Osaka University Institute of Social and Economic Research Association, vol. 30(4), pages 889-920, November.
- Sumru Altug, 1986. "Time to build and aggregate fluctuations: some new evidence," Working Papers 277, Federal Reserve Bank of Minneapolis.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hafedh Bouakez & Michel Guillard & Jordan Roulleau-Pasdeloup, 2017.
"Public Investment, Time to Build, and the Zero Lower Bound,"
Review of Economic Dynamics, Elsevier for the Society for Economic Dynamics, vol. 23, pages 60-79, January.
- Hafedh Bouakez & Michel Guillard & Jordan Roulleau-Pasdeloup, 2014. "Public Investment, Time to Build, and the Zero Lower Bound," Cahiers de recherche 1402, CIRPEE.
- Hafedh Bouakez & Michel Guillard & Jordan Roulleau-Pasdeloup, 2014. "Public Investment, Time to Buid, and the Zero Lower Bound," Working Papers 2014-03, Center for Research in Economics and Statistics.
- Hafedh Bouakez & Michel Guillard & Jordan Roulleau-Pasdeloup, 2016. "Public Investment, Time to Build, and the Zero Lower Bound," Documents de recherche 16-09, Centre d'Études des Politiques Économiques (EPEE), Université d'Evry Val d'Essonne.
- Hafedh Bouakez & Michel Guillard & Jordan Roulleau-Pasdeloup, 2017. "Public investment, time to build, and the zero lower bound," Post-Print hal-02877959, HAL.
- Hafedh Bouakez & Michel Guillard & Jordan Roulleau-Pasdeloup, 2014. "Public Investment, Time to Build, and the Zero Lower Bound," Cahiers de Recherches Economiques du Département d'économie 14.06, Université de Lausanne, Faculté des HEC, Département d’économie, revised Oct 2014.
- Gregory R. Duffee & Stephen D. Prowse, "undated".
"What's Good for GM...? Using Auto Industry Stock Returns to Forecast Business Cycles and Test the Q-Theory of Investment,"
Finance and Economics Discussion Series
1996-38, Board of Governors of the Federal Reserve System (U.S.), revised 04 Dec 2019.
- Gregory R. Duffee & Stephen D. Prowse, 1996. "What's good for GM...? Using auto industry stock returns to forecast business cycles and test the Q-theory of investment," Working Papers 9610, Federal Reserve Bank of Dallas.
- Gregory R. Duffee & Stephen D. Prowse, 1996. "What's good for GM...? Using auto industry stock returns to forecast business cycles and test the Q-theory of investment," Finance and Economics Discussion Series 96-38, Board of Governors of the Federal Reserve System (U.S.).
- Bergman, Mats A. & Johansson, Per & Bergman, M.A., 2002. "Large investments in the pulp and paper industry: a count data regression analysis," Journal of Forest Economics, Elsevier, vol. 8(1), pages 29-52.
- Krawiec, Adam & Szydłowski, Marek, 2017. "Economic growth cycles driven by investment delay," Economic Modelling, Elsevier, vol. 67(C), pages 175-183.
- Wen, Yi, 1998. "Investment cycles," Journal of Economic Dynamics and Control, Elsevier, vol. 22(7), pages 1139-1165, May.
- Lee, Gabriel S., 1999. "Housing Investment Dynamics, Period of Production, and Adjustment Costs," Journal of Housing Economics, Elsevier, vol. 8(1), pages 1-25, March.
- Rena Sivitanidou, 1999. "Does the Theory of Irreversible Investments Help Explain Movements in Office-Commerical Construction?," Working Paper 8659, USC Lusk Center for Real Estate.
- Millar, Jonathan N. & Oliner, Stephen D. & Sichel, Daniel E., 2016.
"Time-to-plan lags for commercial construction projects,"
Regional Science and Urban Economics, Elsevier, vol. 59(C), pages 75-89.
- Jonathan N. Millar & Stephen D. Oliner & Daniel E. Sichel, 2012. "Time-to plan lags for commercial construction projects," Finance and Economics Discussion Series 2012-34, Board of Governors of the Federal Reserve System (U.S.).
- Jonathan N. Millar & Stephen D. Oliner & Daniel E. Sichel, 2013. "Time-To-Plan Lags for Commercial Construction Projects," NBER Working Papers 19408, National Bureau of Economic Research, Inc.
- Stephen D. Oliner & Daniel E. Sichel & Jonathan N. Millar, 2012. "Time-to-plan lags for commercial construction projects," AEI Economics Working Papers 10343, American Enterprise Institute.
- David Prentice, 2000.
"Estimating a Differentiated Products Model with a Discrete/Continuous Choice and Limited Data,"
Working Papers
2000.16, School of Economics, La Trobe University.
- Prentice, David, 2000. "Estimating a Differentiated Products Model with a Discrete/Continuous Choice and Limited Data," MPRA Paper 28681, University Library of Munich, Germany.
- David Prentice, 2000. "Estimating a Differentiated Products Model with a Discrete/Continuous Choice and Limited Data," Working Papers 2000.16, School of Economics, La Trobe University.
- Bambi, Mauro & Gori, Franco, 2014.
"Unifying Time-To-Build Theory,"
Macroeconomic Dynamics, Cambridge University Press, vol. 18(8), pages 1713-1725, December.
- Mauro Bambi, 2008. "Unifying time-to-build theory," CER-ETH Economics working paper series 08/98, CER-ETH - Center of Economic Research (CER-ETH) at ETH Zurich.
- Jung, Yong-Gook, 2013. "An inference about the length of the time-to-build period," Economic Modelling, Elsevier, vol. 33(C), pages 42-54.
- John Harvey, 2010. "Keynes’ Business Cycle: Animal Spirits and Crisis," Working Papers 201003, Texas Christian University, Department of Economics.
- Blackley, Paul R., 2000. "Sources of sectoral fluctuations in business fixed investment," Journal of Economics and Business, Elsevier, vol. 52(6), pages 473-484.
- Lars-Alexander Kuehn, 2007. "Time-to-Build and Asset Prices," 2007 Meeting Papers 1015, Society for Economic Dynamics.
- Kim, Kirak, 2020. "Inventory, fixed capital, and the cross-section of corporate investment," Journal of Corporate Finance, Elsevier, vol. 60(C).
- Kruiniger, Hugo, 2000. "On the solution of the linear rational expectations model with multiple lags," Journal of Economic Dynamics and Control, Elsevier, vol. 24(4), pages 535-559, April.
- Eric Leeper & Todd B. Walker & Susan Shu-Chun Yang, 2009.
"Government Investment And Fiscal Stimulus In The Short And Long Runs,"
CAEPR Working Papers
2009-011, Center for Applied Economics and Policy Research, Department of Economics, Indiana University Bloomington.
- Eric M. Leeper & Todd B. Walker & Shu-Chun Susan Yang, 2009. "Government Investment and Fiscal Stimulus in the Short and Long Runs," NBER Working Papers 15153, National Bureau of Economic Research, Inc.
- Yong-gook Jung, 2013. "A new strategy to estimate time-to-build completion rates," Economics Bulletin, AccessEcon, vol. 33(2), pages 1073-1081.
- Guo, Bin & Huang, Fuzhe & Li, Kai, 2022.
"Time to build and bond risk premia,"
Journal of Economic Dynamics and Control, Elsevier, vol. 136(C).
- Guo, Bin & Huang, Fuzhe & Li, Kai, 2020. "Time to build and bond risk premia," Journal of Economic Dynamics and Control, Elsevier, vol. 121(C).
- Montgomery, Michael R., 1995. "Capital complementarity, time-to-build, and the persistence of investment starts," Journal of Macroeconomics, Elsevier, vol. 17(2), pages 187-205.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Charles Himmelberg & Alessandra del Boca & Marzio Galeotti & Paola Rota, 2005. "Investment and Time to Plan: A Comparison of Structures vs. Equipment in a Panel of Italian Firms," Working Papers 2005.54, Fondazione Eni Enrico Mattei.
- Ramey, Garey & Ramey, Valerie A, 1995.
"Cross-Country Evidence on the Link between Volatility and Growth,"
American Economic Review, American Economic Association, vol. 85(5), pages 1138-1151, December.
- Garey Ramey & Valerie A. Ramey, 1994. "Cross-Country Evidence on the Link Between Volatility and Growth," NBER Working Papers 4959, National Bureau of Economic Research, Inc.
- Panagiotidis, Theodore & Printzis, Panagiotis, 2020.
"What is the investment loss due to uncertainty?,"
Global Finance Journal, Elsevier, vol. 45(C).
- Theodore Panagiotidis & Panagiotis Printzis, 2019. "What is the Investment Loss due to Uncertainty?," Working Paper series 19-06, Rimini Centre for Economic Analysis.
- Theodore Panagiotidis & Panagiotis Printzis, 2019. "What is the Investment Loss due to Uncertainty?," GreeSE – Hellenic Observatory Papers on Greece and Southeast Europe 138, Hellenic Observatory, LSE.
- Panagiotidis, Theodore & Printzis, Panagiotis, 2019. "What is the investment loss due to uncertainty?," LSE Research Online Documents on Economics 102648, London School of Economics and Political Science, LSE Library.
- Theodore Panagiotidis & Panagiotis Printzis, 2019. "What is the Investment Loss due to Uncertainty?," Working Papers 383, Leibniz Institut für Ost- und Südosteuropaforschung (Institute for East and Southeast European Studies).
- Balaji Bathmanaban & Raja Sethu Durai S & Ramachandran M, 2017. "The relationship between Output Uncertainty and Economic Growth-Evidence from India," Economics Bulletin, AccessEcon, vol. 37(4), pages 2680-2691.
- Klaus S. Friesenbichler & Sandra Bilek-Steindl & Christian Glocker, 2021. "Österreichs Investitionsperformance im internationalen und sektoralen Vergleich. Erste Analysen zur COVID-19-Krise," WIFO Studies, WIFO, number 67163, January.
- Inekwe John Nkwoma, 2014. "Business Cycle Variability and Growth Linkage," Monash Economics Working Papers 38-14, Monash University, Department of Economics.
- Blackley, Paul R., 2000. "Sources of sectoral fluctuations in business fixed investment," Journal of Economics and Business, Elsevier, vol. 52(6), pages 473-484.
- Dimitrios Bakas & Georgios Chortareas & Georgios Magkonis, 2019.
"Volatility and growth: a not so straightforward relationship,"
Oxford Economic Papers, Oxford University Press, vol. 71(4), pages 874-907.
- Dimitrios Bakas & Georgios Chortareas & Georgios Magkonis, 2017. "Volatility and Growth: A not so straightforward relationship," Working Paper series 17-12, Rimini Centre for Economic Analysis.
- Dimitrios Bakas & Georgios Chortareas & Georgios Magkonis, 2018. "Volatility and Growth: A not so Straightforward Relationship," Working Papers in Economics & Finance 2018-04, University of Portsmouth, Portsmouth Business School, Economics and Finance Subject Group.
- Dimitrios Bakas & Georgios Chortareas & Georgios Magkonis, 2017. "Volatility and Growth: A not so straightforward relationship," NBS Discussion Papers in Economics 2017/06, Economics, Nottingham Business School, Nottingham Trent University.
- Stilianos Fountas & Menelaos Karanasos, 2008.
"Are economic growth and the variability of the business cycle related? Evidence from five European countries,"
International Economic Journal, Taylor & Francis Journals, vol. 22(4), pages 445-459.
- Stilianos Fountas & Menelaos Karanasos, 2002. "Are Economic Growth and the Variability of the Business Cycle Related? Evidence from Five European Countries," Working Papers 0063, National University of Ireland Galway, Department of Economics, revised 2002.
- Stilianos Fountas & Menelaos Karanasos, 2008. "Are economic growth and the variability of the business cycle related ? Evidence from five European countries," Discussion Paper Series 2008_17, Department of Economics, University of Macedonia, revised Dec 2008.
- Solimano, Andres, 1989. "How private investment reacts to changing macroeconomic conditions : the case of Chile in the 1980s," Policy Research Working Paper Series 212, The World Bank.
- Wen, Yi, 1998. "Investment cycles," Journal of Economic Dynamics and Control, Elsevier, vol. 22(7), pages 1139-1165, May.
- Kul B. Luintel & George Mavrotas, 2005. "Examining Private Investment Heterogeneity: Evidence from a Dynamic Panel," WIDER Working Paper Series DP2005-11, World Institute for Development Economic Research (UNU-WIDER).
- Roberto Ezcurra & Vicente Rios, 2015.
"Volatility and Regional Growth in Europe: Does Space Matter?,"
Spatial Economic Analysis, Taylor & Francis Journals, vol. 10(3), pages 344-368, September.
- Vicente Rios Ibáñez & Roberto Ezcurra, 2013. "Volatility and regional growth in Europe: Does space matter?," ERSA conference papers ersa13p133, European Regional Science Association.
- Alves, Pana & Dejuan, Daniel & Maurin, Laurent, 2019. "Can survey-based information help to assess investment gaps in the EU?," EIB Working Papers 2019/04, European Investment Bank (EIB).
- Pana Alves & Daniel Dejuán & Laurent Maurin, 2019. "Can survey-based information help assess investment gaps in the eu?," Occasional Papers 1908, Banco de España.
- Lee, Gabriel S., 1999. "Housing Investment Dynamics, Period of Production, and Adjustment Costs," Journal of Housing Economics, Elsevier, vol. 8(1), pages 1-25, March.
- Millar, Jonathan N. & Oliner, Stephen D. & Sichel, Daniel E., 2016.
"Time-to-plan lags for commercial construction projects,"
Regional Science and Urban Economics, Elsevier, vol. 59(C), pages 75-89.
- Stephen D. Oliner & Daniel E. Sichel & Jonathan N. Millar, 2012. "Time-to-plan lags for commercial construction projects," AEI Economics Working Papers 10343, American Enterprise Institute.
- Jonathan N. Millar & Stephen D. Oliner & Daniel E. Sichel, 2013. "Time-To-Plan Lags for Commercial Construction Projects," NBER Working Papers 19408, National Bureau of Economic Research, Inc.
- Jonathan N. Millar & Stephen D. Oliner & Daniel E. Sichel, 2012. "Time-to plan lags for commercial construction projects," Finance and Economics Discussion Series 2012-34, Board of Governors of the Federal Reserve System (U.S.).
- Terence D. Agbeyegbe, 2023. "The Link Between Output Growth and Output Growth Volatility: Barbados," Annals of Data Science, Springer, vol. 10(3), pages 787-804, June.
- Pinar Deniz & Thanasis Stengos & M. Ege Yazgan, 2021. "Revisiting the link between output growth and volatility: panel GARCH analysis," Empirical Economics, Springer, vol. 61(2), pages 743-771, August.
- Mehmet Balcilar & Zeynel Abidin Ozdemir, 2020.
"A re-examination of growth and growth uncertainty relationship in a stochastic volatility in the mean model with time-varying parameters,"
Empirica, Springer;Austrian Institute for Economic Research;Austrian Economic Association, vol. 47(3), pages 611-641, August.
- Mehmet Balcilar & Zeynel Abidin Ozdemir, 2017. "A re-examination of growth and growth uncertainty relationship in a stochastic volatility in mean model with time-varying parameters," Working Papers 15-32, Eastern Mediterranean University, Department of Economics.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ecolet:v:48:y:1995:i:2:p:155-163. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ecolet .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.