IDEAS home Printed from https://ideas.repec.org/a/ags/ndjtrf/206761.html
   My bibliography  Save this article

Positive Train Control (PTC): Calculating Benefits and Costs of a New Railroad Control Technology

Author

Listed:
  • Resor, Randolph R.
  • Smith, Michael E.
  • Patel, Pradeep K.

Abstract

The purpose of this analysis was to quantify the business benefits of Positive Train Control (PTC) for the Class I freight railroad industry. This report does not address the safety benefits of PTC. These were previously quantified by the Rail Safety Advisory Committee (RSAC), which identified nearly a thousand “PPAs” (PTC-preventable accidents) on U.S. railroads over a 12-year period, and determined the savings to be realized from each avoided accident. The RSAC finding was that avoidance of these PPAs was not, by itself, sufficient (from a strictly economic point of view) to justify an investment in PTC. Examples of potential business benefits include: • Line capacity enhancement • Improved service reliability • Faster over-the-road running times • More efficient use of cars and locomotives (made possible by real-time location information) • Reduction in locomotive failures (due to availability of real-time diagnostics) • Larger “windows” (periods during which no trains operate and maintenance workers can safely occupy the track) for track maintenance (made possible by real-time location information) • Fuel savings This paper presents the results of the analysis. It is important to recognize, however, that the state of the art in making these estimates is not sufficiently mature to make exact answers feasible. Presented here are the best estimates now possible, with observations as to how better information may be developed. Benefits were estimated in the above areas and the cost of deploying PTC on the Class I network (99,000 route miles and 20,000 locomotives) were calculated. The conclusions of the analysis were as follows: • Deployment of PTC on the Class I railroad network (99,000 route miles, 20,000 locomotives) would cost between $2.3 billion and $4.4 billion over five years • Annual benefits, once the system was fully implemented, were estimated at $2.2 billion to $3.8 billion • Internal rate of return was estimated (depending on timing and cost) to be between 44% and 160%

Suggested Citation

  • Resor, Randolph R. & Smith, Michael E. & Patel, Pradeep K., 2005. "Positive Train Control (PTC): Calculating Benefits and Costs of a New Railroad Control Technology," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 44(2).
  • Handle: RePEc:ags:ndjtrf:206761
    DOI: 10.22004/ag.econ.206761
    as

    Download full text from publisher

    File URL: https://ageconsearch.umn.edu/record/206761/files/841-951-1-PB.pdf
    Download Restriction: no

    File URL: https://libkey.io/10.22004/ag.econ.206761?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Smith, Michael & Patel, Pradeep K. & Resor, Randolph R. & Kondapalli, Sunil, 1990. "Benefits of the Meet/Pass Planning and Energy Management Subsystems of the Advanced Railroad Electronics System (ARES)," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 30(2).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hallowell, Susan F. & Harker, Patrick T., 1998. "Predicting on-time performance in scheduled railroad operations: methodology and application to train scheduling," Transportation Research Part A: Policy and Practice, Elsevier, vol. 32(4), pages 279-295, May.
    2. Smith, Michael E. & Resor, Randolph R. & Patel, Pradeep K., 1991. "Dispatching Effectiveness with Advanced Train Control Systems: Quantification of the Relationship," Transportation Research Forum Proceedings 1990s 319068, Transportation Research Forum.

    More about this item

    Keywords

    Industrial Organization;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ags:ndjtrf:206761. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: AgEcon Search (email available below). General contact details of provider: http://www.trforum.org/journal/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.