IDEAS home Printed from https://ideas.repec.org/r/eee/proeco/v92y2004i3p255-266.html
   My bibliography  Save this item

Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Chen, Liang-Hsuan & Kang, Fu-Sen, 2007. "Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 183(2), pages 658-673, December.
  2. Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
  3. Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
  4. M. Ganesh Kumar & R. Uthayakumar, 2017. "An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1041-1054, November.
  5. Lin, Yu-Jen, 2008. "Minimax distribution free procedure with backorder price discount," International Journal of Production Economics, Elsevier, vol. 111(1), pages 118-128, January.
  6. Taleizadeh, Ata Allah & Shokr, Iman & Konstantaras, Ioannis & VafaeiNejad, Mahyar, 2020. "Stock replenishment policies for a vendor-managed inventory in a retailing system," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
  7. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
  8. Rad, Reza Hosseini & Razmi, Jafar & Sangari, Mohamad Sadegh & Ebrahimi, Zahra Fallah, 2014. "Optimizing an integrated vendor-managed inventory system for a single-vendor two-buyer supply chain with determining weighting factor for vendor׳s ordering cost," International Journal of Production Economics, Elsevier, vol. 153(C), pages 295-308.
  9. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
  10. Li, Yina & Xu, Xuejun & Zhao, Xiande & Yeung, Jeff Hoi Yan & Ye, Fei, 2012. "Supply chain coordination with controllable lead time and asymmetric information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 108-119.
  11. Hsu, Chaug-Ing & Li, Hui-Chieh, 2011. "Reliability evaluation and adjustment of supply chain network design with demand fluctuations," International Journal of Production Economics, Elsevier, vol. 132(1), pages 131-145, July.
  12. M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
  13. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
  14. Sumon Sarkar & Sunil Tiwari & B. C. Giri, 2022. "Impact of uncertain demand and lead-time reduction on two-echelon supply chain," Annals of Operations Research, Springer, vol. 315(2), pages 2027-2055, August.
  15. Ravi Shankar Kumar & M. K. Tiwari & A. Goswami, 2016. "Two-echelon fuzzy stochastic supply chain for the manufacturer–buyer integrated production–inventory system," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 875-888, August.
  16. Sumon Sarkar & Bibhas C. Giri, 2022. "Safety stock management in a supply chain model with waiting time and price discount dependent backlogging rate in stochastic environment," Operational Research, Springer, vol. 22(2), pages 917-946, April.
  17. Chen, Liang-Hsuan & Kang, Fu-Sen, 2010. "Coordination between vendor and buyer considering trade credit and items of imperfect quality," International Journal of Production Economics, Elsevier, vol. 123(1), pages 52-61, January.
  18. Darwish, M.A., 2009. "Economic selection of process mean for single-vendor single-buyer supply chain," European Journal of Operational Research, Elsevier, vol. 199(1), pages 162-169, November.
  19. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
  20. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
  21. Chen, Liang-Hsuan & Kang, Fu-Sen, 2010. "Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme," European Journal of Operational Research, Elsevier, vol. 205(1), pages 47-58, August.
  22. Zhai, Yue & Cheng, T.C.E., 2022. "Lead-time quotation and hedging coordination in make-to-order supply chain," European Journal of Operational Research, Elsevier, vol. 300(2), pages 449-460.
  23. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
  24. Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.
  25. Dipak Barman & Gour Chandra Mahata, 2022. "Two-echelon production inventory model with imperfect quality items with ordering cost reduction depending on controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(5), pages 2656-2671, October.
  26. Nughthoh Arfawi Kurdhi & Joko Prasetyo & Sri Sulistijowati Handajani, 2016. "An inventory model involving back-order price discount when the amount received is uncertain," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(3), pages 662-671, February.
  27. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
  28. Herbon, Avi & David, Israel, 2023. "Optimal manufacturer's cost sharing ratio, shipping policy and production rate – A two-echelon supply chain," Operations Research Perspectives, Elsevier, vol. 10(C).
  29. Majumder, P. & Bera, U.K. & Maiti, M., 2016. "An EPQ model for two-warehouse in unremitting release pattern with two-level trade credit period concerning both supplier and retailer," Applied Mathematics and Computation, Elsevier, vol. 274(C), pages 430-458.
  30. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
  31. Bikash Koli Dey & Biswajit Sarkar & Sarla Pareek, 2019. "A Two-Echelon Supply Chain Management With Setup Time and Cost Reduction, Quality Improvement and Variable Production Rate," Mathematics, MDPI, vol. 7(4), pages 1-25, April.
  32. Sajadieh, Mohsen S. & Fallahnezhad, Mohammad Saber & Khosravi, Maryam, 2013. "A joint optimal policy for a multiple-suppliers multiple-manufacturers multiple-retailers system," International Journal of Production Economics, Elsevier, vol. 146(2), pages 738-744.
  33. Heibatolah Sadeghi & Hêriş Golpîra & Faicel Hnaien & Cosimo Magazzino, 2023. "Pricing-inventory model with discrete demand and delivery orders," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 33(3), pages 119-139.
  34. Suman Kalyan Sardar & Biswajit Sarkar, 2020. "How Does Advanced Technology Solve Unreliability Under Supply Chain Management Using Game Policy?," Mathematics, MDPI, vol. 8(7), pages 1-16, July.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.