An inventory model involving back-order price discount when the amount received is uncertain
Author
Abstract
Suggested Citation
DOI: 10.1080/00207721.2014.900136
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Kun-Shan Wu & I-Chuan Lin, 2004. "Extend (r, Q) Inventory Model Under Lead Time and Ordering Cost Reductions When the Receiving Quantity is Different from the Ordered Quantity," Quality & Quantity: International Journal of Methodology, Springer, vol. 38(6), pages 771-786, December.
- Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
- Vijayan, T. & Kumaran, M., 2008. "Inventory models with a mixture of backorders and lost sales under fuzzy cost," European Journal of Operational Research, Elsevier, vol. 189(1), pages 105-119, August.
- Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
- Abuo-El-Ata, M. O. & Fergany, Hala A. & El-Wakeel, Mona F., 2003. "Probabilistic multi-item inventory model with varying order cost under two restrictions: A geometric programming approach," International Journal of Production Economics, Elsevier, vol. 83(3), pages 223-231, March.
- Taleizadeh, Ata Allah & Mohammadi, Babak & Cárdenas-Barrón, Leopoldo Eduardo & Samimi, Hadi, 2013. "An EOQ model for perishable product with special sale and shortage," International Journal of Production Economics, Elsevier, vol. 145(1), pages 318-338.
- Evan L. Porteus, 1986. "Investing in new parameter values in the discounted EOQ model," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 33(1), pages 39-48, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- S. Hemapriya & R. Uthayakumar, 2017. "An inventory model with uncertain demand and lost sales reduction under service level constraint," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1399-1418, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
- Dey, Oshmita & Chakraborty, Debjani, 2011. "A fuzzy random continuous review inventory system," International Journal of Production Economics, Elsevier, vol. 132(1), pages 101-106, July.
- S. Hemapriya & R. Uthayakumar, 2017. "An inventory model with uncertain demand and lost sales reduction under service level constraint," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1399-1418, November.
- Kirk R. Karwan & Joseph B. Mazzola & Richard C. Morey, 1988. "Production lot sizing under setup and worker learning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(2), pages 159-175, April.
- Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
- S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
- Li, Xiang, 2020. "Reducing channel costs by investing in smart supply chain technologies," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 137(C).
- K. F. Mary Latha & R. Uthayakumar, 2017. "A two-echelon supply chain coordination with quantity discount incentive for fixed lifetime product in a fuzzy environment," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1194-1208, November.
- Gong, Qiguo & Chen, Guohui & Zhang, Wen & Wang, Hui, 2022. "The role of humans in flexible smart factories," International Journal of Production Economics, Elsevier, vol. 254(C).
- M. Ganesh Kumar & R. Uthayakumar, 2017. "An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1041-1054, November.
- M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
- K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
- Pilar I. Vidal-Carreras & Jose P. Garcia-Sabater & Julio J. Garcia-Sabater, 2017. "A practical model for managing inventories with unknown costs and a budget constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 118-129, January.
- Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
- Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
- Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
- Taleizadeh, Ata Allah & Shokr, Iman & Konstantaras, Ioannis & VafaeiNejad, Mahyar, 2020. "Stock replenishment policies for a vendor-managed inventory in a retailing system," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
- Arbabian, Mohammad E. & Wagner, Michael R., 2020. "The impact of 3D printing on manufacturer–retailer supply chains," European Journal of Operational Research, Elsevier, vol. 285(2), pages 538-552.
- Golmohammadi, Amirmohsen & Kraft, Tim & Monemian, Seyedamin, 2024. "Setting the deadline and the penalty policy for a new environmental standard," European Journal of Operational Research, Elsevier, vol. 315(1), pages 88-101.
- Denizel, Meltem & Erenguc, Selcuk & Benson, Harold P., 1997. "Dynamic lot-sizing with setup cost reduction," European Journal of Operational Research, Elsevier, vol. 100(3), pages 537-549, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tsysxx:v:47:y:2016:i:3:p:662-671. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TSYS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.