My bibliography
Save this item
Integrated single vendor single buyer model with stochastic demand and variable lead time
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mehmood Khan & Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4816-4832, August.
- Wee, Hui Ming & Widyadana, Gede Agus, 2013. "Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales," International Journal of Production Economics, Elsevier, vol. 143(2), pages 574-579.
- Wen-Tsung Ho & Shu-Fang Lai & Yun-Kuei Huang, 2014. "An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System," Journal of Optimization Theory and Applications, Springer, vol. 160(2), pages 636-658, February.
- M. Ganesh Kumar & R. Uthayakumar, 2017. "An integrated single vendor–buyer inventory model for imperfect production process with stochastic demand in controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1041-1054, November.
- Hossain, Md Shahriar J. & Ohaiba, Mohamed M. & Sarker, Bhaba R., 2017. "An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness," International Journal of Production Economics, Elsevier, vol. 188(C), pages 50-62.
- Hsiao, Yu-Cheng, 2008. "A note on integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 114(1), pages 294-297, July.
- Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
- Shine-Der Lee & Chin-Ming Yang & Shu-Chuan Lan, 2016. "Economic lot sizing in a production system with random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(5), pages 1142-1154, April.
- K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
- S. M. Shahidul Islam & Mohammad Abdul Hoque, 2017. "A joint economic lot size model for a supplier-manufacturer-retailers supply chain of an agricultural product," OPSEARCH, Springer;Operational Research Society of India, vol. 54(4), pages 868-885, December.
- Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
- Xianpei Hong & Wang Chunyuan & Lei Xu & Ali Diabat, 2016. "Multiple-vendor, multiple-retailer based vendor-managed inventory," Annals of Operations Research, Springer, vol. 238(1), pages 277-297, March.
- Li, Yina & Xu, Xuejun & Zhao, Xiande & Yeung, Jeff Hoi Yan & Ye, Fei, 2012. "Supply chain coordination with controllable lead time and asymmetric information," European Journal of Operational Research, Elsevier, vol. 217(1), pages 108-119.
- S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
- Sumon Sarkar & Sunil Tiwari & B. C. Giri, 2022. "Impact of uncertain demand and lead-time reduction on two-echelon supply chain," Annals of Operations Research, Springer, vol. 315(2), pages 2027-2055, August.
- Sumon Sarkar & Bibhas C. Giri, 2022. "Safety stock management in a supply chain model with waiting time and price discount dependent backlogging rate in stochastic environment," Operational Research, Springer, vol. 22(2), pages 917-946, April.
- M. A. Hoque, 2021. "An optimal solution policy to an integrated manufacturer-retailers problem with normal distribution of lead times of delivering equal and unequal-sized batches," OPSEARCH, Springer;Operational Research Society of India, vol. 58(2), pages 483-512, June.
- AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
- Heydari, Jafar & Mahmoodi, Mansour & Taleizadeh, Ata Allah, 2016. "Lead time aggregation: A three-echelon supply chain model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 89(C), pages 215-233.
- Irfanullah Khan & Jihed Jemai & Han Lim & Biswajit Sarkar, 2019. "Effect of Electrical Energy on the Manufacturing Setup Cost Reduction, Transportation Discounts, and Process Quality Improvement in a Two-Echelon Supply Chain Management under a Service-Level Constrai," Energies, MDPI, vol. 12(19), pages 1-32, September.
- Tiwari, Sunil & Jaggi, Chandra K. & Gupta, Mamta & Cárdenas-Barrón, Leopoldo Eduardo, 2018. "Optimal pricing and lot-sizing policy for supply chain system with deteriorating items under limited storage capacity," International Journal of Production Economics, Elsevier, vol. 200(C), pages 278-290.
- Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
- Glock, Christoph H. & Rekik, Yacine & Ries, Jörg M., 2020. "A coordination mechanism for supply chains with capacity expansions and order-dependent lead times," European Journal of Operational Research, Elsevier, vol. 285(1), pages 247-262.
- Dega Nagaraju & A. Ramakrishna Rao & S. Narayanan & P. Pandian, 2016. "Optimal cycle time and inventory decisions in coordinated and non-coordinated two-echelon inventory system under inflation and time value of money," International Journal of Production Research, Taylor & Francis Journals, vol. 54(9), pages 2709-2730, May.
- Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.
- Mou, Qiong & Cheng, Yunlong & Liao, Huchang, 2017. "A note on “lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand”," International Journal of Production Economics, Elsevier, vol. 193(C), pages 827-831.
- Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
- K. F. Mary Latha & R. Uthayakumar, 2017. "A two-echelon supply chain coordination with quantity discount incentive for fixed lifetime product in a fuzzy environment," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1194-1208, November.
- Mosca, Alyssa & Vidyarthi, Navneet & Satir, Ahmet, 2019. "Integrated transportation – inventory models: A review," Operations Research Perspectives, Elsevier, vol. 6(C).
- Jian, Ming & Fang, Xin & Jin, Liu-qian & Rajapov, Azamat, 2015. "The impact of lead time compression on demand forecasting risk and production cost: A newsvendor model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 84(C), pages 61-72.
- Jean Respen & Nicolas Zufferey & Philippe Wieser, 2017. "Three-level inventory deployment for a luxury watch company facing various perturbations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(10), pages 1195-1210, October.
- Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
- Wen-Tsung Ho & Yu-Cheng Hsiao, 2014. "Optimal Mixed Batch Shipment Policy with Variable Safety Factor for the Single-Vendor Single-Buyer Production-Inventory System," Journal of Optimization Theory and Applications, Springer, vol. 161(2), pages 648-663, May.
- Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
- Abdelsalam, Hisham M. & Elassal, Magy M., 2014. "Joint economic lot sizing problem for a three—Layer supply chain with stochastic demand," International Journal of Production Economics, Elsevier, vol. 155(C), pages 272-283.
- Chan, Chi Kin & Fang, Fei & Langevin, André, 2018. "Single-vendor multi-buyer supply chain coordination with stochastic demand," International Journal of Production Economics, Elsevier, vol. 206(C), pages 110-133.
- M. A. Hoque & Z. A. M. S. Juman, 2024. "Decreased minimum total transportation–inventory cost bounds assuming variability in supplies and demands," OPSEARCH, Springer;Operational Research Society of India, vol. 61(4), pages 1888-1905, December.
- Hsiao, Yu-Cheng, 2008. "Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information," International Journal of Production Economics, Elsevier, vol. 115(1), pages 229-235, September.
- Xianpei Hong & Wang Chunyuan & Lei Xu & Ali Diabat, 2016. "Multiple-vendor, multiple-retailer based vendor-managed inventory," Annals of Operations Research, Springer, vol. 238(1), pages 277-297, March.
- Juman, Z.A.M.S. & Hoque, M.A., 2014. "A heuristic solution technique to attain the minimal total cost bounds of transporting a homogeneous product with varying demands and supplies," European Journal of Operational Research, Elsevier, vol. 239(1), pages 146-156.
- Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
- Dey, O. & Giri, B.C., 2014. "Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process," International Journal of Production Economics, Elsevier, vol. 155(C), pages 222-228.