Persisting Cost Overruns in Public Infrastructure Projects: Lessons From the Belgian Case
Author
Abstract
Suggested Citation
Note: SCOPUS: ar.j
Download full text from publisher
References listed on IDEAS
- Aftab Memon & Ismail Rahman, 2013. "Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM Method," Modern Applied Science, Canadian Center of Science and Education, vol. 7(8), pages 1-78, August.
- Jonas Spohr & Kim Wikström & Kent Eriksson, 2022. "Towards collaborative infrastructure procurement," Public Money & Management, Taylor & Francis Journals, vol. 42(4), pages 274-283, May.
- Chau Kwong Wing, 1997. "The ranking of construction management journals," Construction Management and Economics, Taylor & Francis Journals, vol. 15(4), pages 387-398.
- Cantarelli, C.C. & Molin, E.J.E. & van Wee, B. & Flyvbjerg, B., 2012.
"Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases,"
Transport Policy, Elsevier, vol. 22(C), pages 49-56.
- Chantal C. Cantarelli & Eric J. E. Molin & Bert van Wee & Bent Flyvbjerg, 2013. "Characteristics of Cost Overruns for Dutch Transport Infrastructure Projects and the Importance of the Decision to Build and Project Phases," Papers 1307.2178, arXiv.org, revised Jan 2015.
- James Odeck, 2019. "Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature," Transportation, Springer, vol. 46(4), pages 1345-1368, August.
- Marina Cavalieri & Rossana Cristaudo & Calogero Guccio, 2019. "Tales on the dark side of the transport infrastructure provision: a systematic literature review of the determinants of cost overruns," Transport Reviews, Taylor & Francis Journals, vol. 39(6), pages 774-794, November.
- Molinari, Laura & Haezendonck, Elvira & Mabillard, Vincent, 2023. "Cost overruns of Belgian transport infrastructure projects: Analyzing variations over three land transport modes and two project phases," Transport Policy, Elsevier, vol. 134(C), pages 167-179.
- Stefan Verweij & Ingmar van Meerkerk, 2021. "Do public–private partnerships achieve better time and cost performance than regular contracts?," Public Money & Management, Taylor & Francis Journals, vol. 41(4), pages 286-295, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Abeysekara, Baudhi & Perera, Piyaruwan & Chhipi Shrestha, Gyan Kumar & Gunaruwan, Lalithasiri & Kumarage, Amal & Sadiq, Rehan & Hewage, Kasun, 2021. "Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project," Research in Transportation Economics, Elsevier, vol. 88(C).
- Bartlomiej Rokicki, 2022. "Cost Underruns in Major Road Transport Infrastructure Projects—The Surprising Experience of Poland," Sustainability, MDPI, vol. 14(21), pages 1-18, November.
- Molinari, Laura & Haezendonck, Elvira & Mabillard, Vincent, 2023. "Cost overruns of Belgian transport infrastructure projects: Analyzing variations over three land transport modes and two project phases," Transport Policy, Elsevier, vol. 134(C), pages 167-179.
- Adriana Gómez-Cabrera & Amalia Sanz-Benlloch & Laura Montalban-Domingo & Jose Luis Ponz-Tienda & Eugenio Pellicer, 2020. "Identification of Factors Affecting the Performance of Rural Road Projects in Colombia," Sustainability, MDPI, vol. 12(18), pages 1-18, September.
- Finocchiaro Castro ,Massimo & Guccio, Calogero, 2023. "New wine in old bottle: Exploring the Corruption-inefficiency nexus using endogenous stochastic frontier approach," EconStor Preprints 275730, ZBW - Leibniz Information Centre for Economics.
- Zhao Zhai & Ming Shan & Amos Darko & Albert P. C. Chan, 2021. "Corruption in Construction Projects: Bibliometric Analysis of Global Research," Sustainability, MDPI, vol. 13(8), pages 1-21, April.
- Awojobi, Omotola & Jenkins, Glenn P., 2016.
"Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniques,"
Renewable and Sustainable Energy Reviews, Elsevier, vol. 63(C), pages 19-32.
- Omotola Awojobi & Glenn P. Jenkins, 2015. "Managing the Cost Overrun Risks of Hydroelectric Dams: An Application of Reference Class Forecasting Techniques," Development Discussion Papers 2015-06, JDI Executive Programs.
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
- Miller, Michael & Szimba, Eckhard, 2015. "How to avoid unrealistic appraisal results? A concept to reflect the occurrence of risk in the appraisal of transport infrastructure projects," Research in Transportation Economics, Elsevier, vol. 49(C), pages 65-75.
- Mark A. Moore & Aidan R. Vining, 2023. "PPP performance evaluation: the social welfare goal, principal–agent theory and political economy," Policy Sciences, Springer;Society of Policy Sciences, vol. 56(2), pages 267-299, June.
- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
- Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.
- Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
- Dejan Makovšek & Marian Moszoro, 2018.
"Risk pricing inefficiency in public–private partnerships,"
Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
- Makovsek, Dejan & Moszoro, Marian W., 2017. "Risk pricing inefficiency in public-private partnerships," MPRA Paper 101574, University Library of Munich, Germany.
- Xiaer Xiahou & Jingfeng Yuan & Yan Liu & Yuchun Tang & Qiming Li, 2018. "Exploring the Driving Factors of Construction Industrialization Development in China," IJERPH, MDPI, vol. 15(3), pages 1-16, March.
- Asplund, Disa & Eliasson, Jonas, 2016.
"Does uncertainty make cost-benefit analyses pointless?,"
Transportation Research Part A: Policy and Practice, Elsevier, vol. 92(C), pages 195-205.
- Thureson, Disa & Eliasson, Jonas, 2016. "Does uncertainty make cost-benefit analyses pointless?," Working papers in Transport Economics 2016:8, CTS - Centre for Transport Studies Stockholm (KTH and VTI).
- Love, Peter E.D. & Sing, Michael C.P. & Ika, Lavagnon A. & Newton, Sidney, 2019. "The cost performance of transportation projects: The fallacy of the Planning Fallacy account," Transportation Research Part A: Policy and Practice, Elsevier, vol. 122(C), pages 1-20.
- Liping Fu & Huajun Sun & Yuan Meng & Jiaxin Li, 2022. "The Role of Public–Private Partnerships in Local Government Debt Is a Potential Threat to Sustainable Cities: A Case from China," Sustainability, MDPI, vol. 14(21), pages 1-20, October.
- Raphael Konde Kazungu & Ayyoob Sharifi, 2023. "Investigating Risks to the Implementation of the Great Equatorial Landbridge (GELB) Highway Project across Africa," Sustainability, MDPI, vol. 15(14), pages 1-22, July.
- Steininger, Bertram & Groth, Martin & Weber, Birgitte, 2020. "Cost overruns and delays in infrastructure projects: the case of Stuttgart 21," Working Paper Series 20/11, Royal Institute of Technology, Department of Real Estate and Construction Management & Banking and Finance.
More about this item
Keywords
causes; cost deviations; cost overruns; explanations; project performance; public infrastructure;All these keywords.
NEP fields
This paper has been announced in the following NEP Reports:- NEP-PPM-2024-07-15 (Project, Program and Portfolio Management)
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ulb:ulbeco:2013/374781. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Benoit Pauwels (email available below). General contact details of provider: https://edirc.repec.org/data/ecsulbe.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.