IDEAS home Printed from https://ideas.repec.org/p/tiu/tiucen/95c56aed-8108-4122-a689-594f3f63d9e1.html
   My bibliography  Save this paper

On the (R,s,Q) Inventory Model when Demand is Modelled as a Compound Process

Author

Listed:
  • Janssen, F.B.S.L.P.
  • Heuts, R.M.J.

    (Tilburg University, Center For Economic Research)

  • de Kok, T.

Abstract

No abstract is available for this item.

Suggested Citation

  • Janssen, F.B.S.L.P. & Heuts, R.M.J. & de Kok, T., 1996. "On the (R,s,Q) Inventory Model when Demand is Modelled as a Compound Process," Discussion Paper 1996-11, Tilburg University, Center for Economic Research.
  • Handle: RePEc:tiu:tiucen:95c56aed-8108-4122-a689-594f3f63d9e1
    as

    Download full text from publisher

    File URL: https://pure.uvt.nl/ws/portalfiles/portal/523576/11.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Ruud Heuts & Jan de Klein, 1995. "An (s, q) inventory model with stochastic and interrelated lead times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 839-859, August.
    2. Helmut Schneider & Jeffrey L. Ringuest, 1990. "Power Approximation for Computing (s, S) Policies Using Service Level," Management Science, INFORMS, vol. 36(7), pages 822-834, July.
    3. Willemain, Thomas R. & Smart, Charles N. & Shockor, Joseph H. & DeSautels, Philip A., 1994. "Forecasting intermittent demand in manufacturing: a comparative evaluation of Croston's method," International Journal of Forecasting, Elsevier, vol. 10(4), pages 529-538, December.
    4. Johansen, Soren Glud & Thorstenson, Anders, 1993. "Optimal and approximate (Q, r) inventory policies with lost sales and gamma-distributed lead time," International Journal of Production Economics, Elsevier, vol. 30(1), pages 179-194, July.
    5. Tijms, H. C. & Groenevelt, H., 1984. "Simple approximations for the reorder point in periodic and continuous review (s, S) inventory systems with service level constraints," European Journal of Operational Research, Elsevier, vol. 17(2), pages 175-190, August.
    6. Dunsmuir, W. T. M. & Snyder, R. N., 1989. "Control of inventories with intermittent demand," European Journal of Operational Research, Elsevier, vol. 40(1), pages 16-21, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Janssen, F.B.S.L.P. & Heuts, R.M.J. & de Kok, T., 1996. "On the (R,s,Q) Inventory Model when Demand is Modelled as a Compound Process," Other publications TiSEM 95c56aed-8108-4122-a689-5, Tilburg University, School of Economics and Management.
    2. Janssen, Fred & Heuts, Ruud & de Kok, Ton, 1998. "On the (R, s, Q) inventory model when demand is modelled as a compound Bernoulli process," European Journal of Operational Research, Elsevier, vol. 104(3), pages 423-436, February.
    3. L W G Strijbosch & R M J Heuts & E H M van der Schoot, 2000. "A combined forecast—inventory control procedure for spare parts," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(10), pages 1184-1192, October.
    4. Janssen, F.B.S.L.P., 1998. "Inventory management systems : Control and information issues," Other publications TiSEM 710d54d2-5447-4e2f-bb60-0, Tilburg University, School of Economics and Management.
    5. Strijbosch, L.W.G. & Moors, J.J.A., 1999. "Simple Expressions for Safety Factors in Inventory Control," Discussion Paper 1999-112, Tilburg University, Center for Economic Research.
    6. Mario Guajardo & Mikael Rönnqvist & Ann Mari Halvorsen & Svein Inge Kallevik, 2015. "Inventory management of spare parts in an energy company," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(2), pages 331-341, February.
    7. Janssen, F.B.S.L.P. & Heuts, R.M.J. & de Kok, T., 1996. "The Value of Information in an (R,s,Q) Inventory Model," Other publications TiSEM 4b589d1f-2822-4c0f-9dea-6, Tilburg University, School of Economics and Management.
    8. Janssen, F.B.S.L.P. & Heuts, R.M.J. & de Kok, T., 1996. "The Value of Information in an (R,s,Q) Inventory Model," Discussion Paper 1996-21, Tilburg University, Center for Economic Research.
    9. Z S Hua & B Zhang & J Yang & D S Tan, 2007. "A new approach of forecasting intermittent demand for spare parts inventories in the process industries," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 52-61, January.
    10. Tamer Boyacı & Guillermo Gallego, 2002. "Managing waiting times of backordered demands in single‐stage (Q, r) inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(6), pages 557-573, September.
    11. Sridhar Bashyam & Michael C. Fu, 1998. "Optimization of (s, S) Inventory Systems with Random Lead Times and a Service Level Constraint," Management Science, INFORMS, vol. 44(12-Part-2), pages 243-256, December.
    12. Syntetos, Aris A. & Zied Babai, M. & Gardner, Everette S., 2015. "Forecasting intermittent inventory demands: simple parametric methods vs. bootstrapping," Journal of Business Research, Elsevier, vol. 68(8), pages 1746-1752.
    13. Zied Babai, M. & Syntetos, Aris A. & Teunter, Ruud, 2010. "On the empirical performance of (T, s, S) heuristics," European Journal of Operational Research, Elsevier, vol. 202(2), pages 466-472, April.
    14. Kleijnen, J.P.C. & Wan, J., 2007. "Optimization of simulated systems : OptQuest and alternatives [also see “Simulation for the optimization of (s, S) inventory system with random lead times and a service level constraint by using Arena," Other publications TiSEM ffaee312-9f6a-4452-9ccc-9, Tilburg University, School of Economics and Management.
    15. Bijvank, Marco & Vis, Iris F.A., 2011. "Lost-sales inventory theory: A review," European Journal of Operational Research, Elsevier, vol. 215(1), pages 1-13, November.
    16. Chen, Frank Y. & Krass, Dmitry, 2001. "Inventory models with minimal service level constraints," European Journal of Operational Research, Elsevier, vol. 134(1), pages 120-140, October.
    17. Nenes, George & Panagiotidou, Sofia & Tagaras, George, 2010. "Inventory management of multiple items with irregular demand: A case study," European Journal of Operational Research, Elsevier, vol. 205(2), pages 313-324, September.
    18. E A Silver & H Naseraldin & D P Bischak, 2009. "Determining the reorder point and order-up-to-level in a periodic review system so as to achieve a desired fill rate and a desired average time between replenishments," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1244-1253, September.
    19. van Donselaar, Karel H. & Broekmeulen, Rob A.C.M., 2013. "Determination of safety stocks in a lost sales inventory system with periodic review, positive lead-time, lot-sizing and a target fill rate," International Journal of Production Economics, Elsevier, vol. 143(2), pages 440-448.
    20. J J A Moors & L W G Strijbosch, 2002. "Exact fill rates for (R, s, S) inventory control with gamma distributed demand," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(11), pages 1268-1274, November.

    More about this item

    Keywords

    inventory models; demand;

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:tiu:tiucen:95c56aed-8108-4122-a689-594f3f63d9e1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Richard Broekman (email available below). General contact details of provider: http://center.uvt.nl .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.