Power Approximation for Computing (s, S) Policies Using Service Level
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.36.7.822
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Noordhoek, Marije & Dullaert, Wout & Lai, David S.W. & de Leeuw, Sander, 2018. "A simulation–optimization approach for a service-constrained multi-echelon distribution network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 292-311.
- Strijbosch, L.W.G. & Moors, J.J.A., 1999.
"Simple Expressions for Safety Factors in Inventory Control,"
Discussion Paper
1999-112, Tilburg University, Center for Economic Research.
- Strijbosch, L.W.G. & Moors, J.J.A., 1999. "Simple Expressions for Safety Factors in Inventory Control," Other publications TiSEM 2f1bb350-ce71-4adf-beca-b, Tilburg University, School of Economics and Management.
- Sridhar Bashyam & Michael C. Fu, 1998. "Optimization of (s, S) Inventory Systems with Random Lead Times and a Service Level Constraint," Management Science, INFORMS, vol. 44(12-Part-2), pages 243-256, December.
- E A Silver & H Naseraldin & D P Bischak, 2009. "Determining the reorder point and order-up-to-level in a periodic review system so as to achieve a desired fill rate and a desired average time between replenishments," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1244-1253, September.
- Janssen, F.B.S.L.P. & Heuts, R.M.J. & de Kok, T., 1996. "The Value of Information in an (R,s,Q) Inventory Model," Discussion Paper 1996-21, Tilburg University, Center for Economic Research.
- J J A Moors & L W G Strijbosch, 2002.
"Exact fill rates for (R, s, S) inventory control with gamma distributed demand,"
Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(11), pages 1268-1274, November.
- Moors, J.J.A. & Strijbosch, L.W.G., 2001. "Exact Fill Rates for (R, s, S) Inventory Control With Gamma Distributed Demand," Discussion Paper 2001-32, Tilburg University, Center for Economic Research.
- Moors, J.J.A. & Strijbosch, L.W.G., 2001. "Exact Fill Rates for (R, s, S) Inventory Control With Gamma Distributed Demand," Other publications TiSEM c967aa9c-b4fa-4074-9fbf-c, Tilburg University, School of Economics and Management.
- Alain Bensoussan & Qi Feng & Suresh P. Sethi, 2011. "Achieving a Long-Term Service Target with Periodic Demand Signals: A Newsvendor Framework," Manufacturing & Service Operations Management, INFORMS, vol. 13(1), pages 73-88, February.
- Kleijnen, J.P.C. & Wan, J., 2007. "Optimization of simulated systems : OptQuest and alternatives [also see “Simulation for the optimization of (s, S) inventory system with random lead times and a service level constraint by using Arena," Other publications TiSEM ffaee312-9f6a-4452-9ccc-9, Tilburg University, School of Economics and Management.
- Mario Guajardo & Mikael Rönnqvist & Ann Mari Halvorsen & Svein Inge Kallevik, 2015.
"Inventory management of spare parts in an energy company,"
Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(2), pages 331-341, February.
- Guajardo, Mario & Rönnqvist, Mikael & Halvorsen, Ann Mari & Kallevik, Svein Inge, 2012. "Inventory management of spare parts in an energy company," Discussion Papers 2012/6, Norwegian School of Economics, Department of Business and Management Science.
- Janssen, F.B.S.L.P. & Heuts, R.M.J. & de Kok, T., 1996. "On the (R,s,Q) Inventory Model when Demand is Modelled as a Compound Process," Other publications TiSEM 95c56aed-8108-4122-a689-5, Tilburg University, School of Economics and Management.
- Janssen, F.B.S.L.P. & Heuts, R.M.J. & de Kok, T., 1996. "On the (R,s,Q) Inventory Model when Demand is Modelled as a Compound Process," Discussion Paper 1996-11, Tilburg University, Center for Economic Research.
- Hu, Jason & Watson, Edward & Schneider, Helmut, 2005. "Approximate solutions for multi-location inventory systems with transshipments," International Journal of Production Economics, Elsevier, vol. 97(1), pages 31-43, July.
- Anne E. Lordahl & James H. Bookbinder, 1994. "Order‐statistic calculation, costs, and service in an (s, Q) inventory system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 81-97, February.
- Janssen, F.B.S.L.P. & Heuts, R.M.J. & de Kok, T., 1996. "The Value of Information in an (R,s,Q) Inventory Model," Other publications TiSEM 4b589d1f-2822-4c0f-9dea-6, Tilburg University, School of Economics and Management.
- van Donselaar, Karel H. & Broekmeulen, Rob A.C.M., 2012. "Approximations for the relative outdating of perishable products by combining stochastic modeling, simulation and regression modeling," International Journal of Production Economics, Elsevier, vol. 140(2), pages 660-669.
- Janssen, F.B.S.L.P., 1998. "Inventory management systems : Control and information issues," Other publications TiSEM 710d54d2-5447-4e2f-bb60-0, Tilburg University, School of Economics and Management.
- Janssen, Fred & Heuts, Ruud & de Kok, Ton, 1998. "On the (R, s, Q) inventory model when demand is modelled as a compound Bernoulli process," European Journal of Operational Research, Elsevier, vol. 104(3), pages 423-436, February.
- Saif, Ahmed & Elhedhli, Samir, 2016. "Cold supply chain design with environmental considerations: A simulation-optimization approach," European Journal of Operational Research, Elsevier, vol. 251(1), pages 274-287.
- Sandun C. Perera & Suresh P. Sethi, 2023. "A survey of stochastic inventory models with fixed costs: Optimality of (s, S) and (s, S)‐type policies—Discrete‐time case," Production and Operations Management, Production and Operations Management Society, vol. 32(1), pages 131-153, January.
- Tamer Boyacı & Guillermo Gallego, 2002. "Managing waiting times of backordered demands in single‐stage (Q, r) inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(6), pages 557-573, September.
- Zied Babai, M. & Syntetos, Aris A. & Teunter, Ruud, 2010. "On the empirical performance of (T, s, S) heuristics," European Journal of Operational Research, Elsevier, vol. 202(2), pages 466-472, April.
- B S Maddah & M Y Jaber & N E Abboud, 2004. "Periodic review (s, S) inventory model with permissible delay in payments," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(2), pages 147-159, February.
- Chen, Frank Y. & Krass, Dmitry, 2001. "Inventory models with minimal service level constraints," European Journal of Operational Research, Elsevier, vol. 134(1), pages 120-140, October.
- van Donselaar, Karel H. & Broekmeulen, Rob A.C.M., 2013. "Determination of safety stocks in a lost sales inventory system with periodic review, positive lead-time, lot-sizing and a target fill rate," International Journal of Production Economics, Elsevier, vol. 143(2), pages 440-448.
- Dettenbach, Marcus & Thonemann, Ulrich W., 2015. "The value of real time yield information in multi-stage inventory systems – Exact and heuristic approaches," European Journal of Operational Research, Elsevier, vol. 240(1), pages 72-83.
More about this item
Keywords
inventory: approximation; periodic review models; service-level;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:36:y:1990:i:7:p:822-834. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.