Heuristics for the Early/Tardy Scheduling Problem with Release Dates
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Akturk, M. Selim & Ozdemir, Deniz, 2001. "A new dominance rule to minimize total weighted tardiness with unequal release dates," European Journal of Operational Research, Elsevier, vol. 135(2), pages 394-412, December.
- George Li, 1997. "Single machine earliness and tardiness scheduling," European Journal of Operational Research, Elsevier, vol. 96(3), pages 546-558, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ana Paula Delgado & Isabel Maria Godinho, 2004. "The evolution of city size distribution in Portugal: 1864-2001," FEP Working Papers 151, Universidade do Porto, Faculdade de Economia do Porto.
- Sandra Silva, 2009.
"On evolutionary technological change and economic growth: Lakatos as a starting point for appraisal,"
Journal of Evolutionary Economics, Springer, vol. 19(1), pages 111-135, February.
- Sandra Silva, 2004. "On evolutionary technological change and economic growth: Lakatos as a starting point for appraisal," FEP Working Papers 139, Universidade do Porto, Faculdade de Economia do Porto.
- Maria do Rosario Correia & Scott C. Linn & Andrew Marshall, 2004. "An Empirical Investigation of Debt Contract Design: The Determinants of the Choice of Debt Terms in Eurobond Issues," FEP Working Papers 148, Universidade do Porto, Faculdade de Economia do Porto.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jorge M. S. Valente & Rui A. F. S. Alves, 2003. "An Exact Approach to Early/Tardy Scheduling with Release Dates," FEP Working Papers 129, Universidade do Porto, Faculdade de Economia do Porto.
- Pei-Chann Chang & Shih-Hsin Chen & Chin-Yuan Fan & V. Mani, 2010. "Generating artificial chromosomes with probability control in genetic algorithm for machine scheduling problems," Annals of Operations Research, Springer, vol. 180(1), pages 197-211, November.
- Valente, Jorge M.S. & Alves, Rui A.F.S., 2007. "Heuristics for the early/tardy scheduling problem with release dates," International Journal of Production Economics, Elsevier, vol. 106(1), pages 261-274, March.
- Jouglet, Antoine & Savourey, David & Carlier, Jacques & Baptiste, Philippe, 2008. "Dominance-based heuristics for one-machine total cost scheduling problems," European Journal of Operational Research, Elsevier, vol. 184(3), pages 879-899, February.
- J M S Valente & R A F S Alves, 2005. "Improved lower bounds for the early/tardy scheduling problem with no idle time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 604-612, May.
- Chen, Shih-Hsin & Chen, Min-Chih, 2013. "Addressing the advantages of using ensemble probabilistic models in Estimation of Distribution Algorithms for scheduling problems," International Journal of Production Economics, Elsevier, vol. 141(1), pages 24-33.
- Ronconi, Débora P. & Henriques, Luís R.S., 2009. "Some heuristic algorithms for total tardiness minimization in a flowshop with blocking," Omega, Elsevier, vol. 37(2), pages 272-281, April.
- Boysen, Nils & Bock, Stefan, 2011.
"Scheduling just-in-time part supply for mixed-model assembly lines,"
European Journal of Operational Research, Elsevier, vol. 211(1), pages 15-25, May.
- Nils Boysen & Stefan Bock, 2010. "Scheduling Just-in-Time Part Supply for Mixed-Model Assembly Lines," Jena Research Papers in Business and Economics - Working and Discussion Papers (Expired!) 01/2010, Friedrich-Schiller-University Jena, School of Economics and Business Administration.
- R-H Huang & C-L Yang, 2009. "An algorithm for minimizing flow time and maximum earliness on a single machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(6), pages 873-877, June.
- Jorge M. S. Valente, 2008. "Beam search heuristics for quadratic earliness and tardiness scheduling," FEP Working Papers 279, Universidade do Porto, Faculdade de Economia do Porto.
- Vincent T’kindt & Karima Bouibede-Hocine & Carl Esswein, 2007. "Counting and enumeration complexity with application to multicriteria scheduling," Annals of Operations Research, Springer, vol. 153(1), pages 215-234, September.
- Jorge M. S. Valente & Rui A. F. S. Alves, 2003. "Improved Lower Bounds for the Early/Tardy Scheduling Problem with No Idle Time," FEP Working Papers 125, Universidade do Porto, Faculdade de Economia do Porto.
- Sen, Tapan & Sulek, Joanne M. & Dileepan, Parthasarati, 2003. "Static scheduling research to minimize weighted and unweighted tardiness: A state-of-the-art survey," International Journal of Production Economics, Elsevier, vol. 83(1), pages 1-12, January.
- Jorge M. S. Valente & Maria R. A. Moreira & Alok Singh & Rui A. F. S. Alves, 2009. "Genetic algorithms for single machine scheduling with quadratic earliness and tardiness costs," FEP Working Papers 312, Universidade do Porto, Faculdade de Economia do Porto.
- Jorge M. S. Valente & Rui A. F. S. Alves, 2004. "Beam search algorithms for the early/tardy scheduling problem with release dates," FEP Working Papers 143, Universidade do Porto, Faculdade de Economia do Porto.
- Philippe Baptiste & Ruslan Sadykov, 2009. "On scheduling a single machine to minimize a piecewise linear objective function: A compact MIP formulation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(6), pages 487-502, September.
- Alidaee, Bahram & Li, Haitao & Wang, Haibo & Womer, Keith, 2021. "Integer programming formulations in sequencing with total earliness and tardiness penalties, arbitrary due dates, and no idle time: A concise review and extension," Omega, Elsevier, vol. 103(C).
- Wan, Guohua & Yen, Benjamin P. -C., 2002. "Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties," European Journal of Operational Research, Elsevier, vol. 142(2), pages 271-281, October.
- Jorge M. S. Valente & Rui A. F. S. Alves, 2003. "Improved Heuristics for the Early/Tardy Scheduling Problem with No Idle Time," FEP Working Papers 126, Universidade do Porto, Faculdade de Economia do Porto.
- Jorge M. S. Valente & Maria R. A. Moreira, 2008. "Greedy randomized dispatching heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties," FEP Working Papers 286, Universidade do Porto, Faculdade de Economia do Porto.
More about this item
Keywords
scheduling; early/tardy; release dates; heuristics;All these keywords.
NEP fields
This paper has been announced in the following NEP Reports:- NEP-CMP-2004-07-26 (Computational Economics)
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:por:fepwps:130. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: the person in charge (email available below). General contact details of provider: https://edirc.repec.org/data/fepuppt.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.