IDEAS home Printed from https://ideas.repec.org/p/hal/journl/hal-03119408.html
   My bibliography  Save this paper

Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem

Author

Listed:
  • Minh Phuoc Doan

    (DISP - Décision et Information pour les Systèmes de Production - UL2 - Université Lumière - Lyon 2 - UCBL - Université Claude Bernard Lyon 1 - Université de Lyon - INSA Lyon - Institut National des Sciences Appliquées de Lyon - Université de Lyon - INSA - Institut National des Sciences Appliquées)

  • Julien Fondrevelle

    (DISP - Décision et Information pour les Systèmes de Production - UL2 - Université Lumière - Lyon 2 - UCBL - Université Claude Bernard Lyon 1 - Université de Lyon - INSA Lyon - Institut National des Sciences Appliquées de Lyon - Université de Lyon - INSA - Institut National des Sciences Appliquées)

  • Valérie Botta-Genoulaz

    (DISP - Décision et Information pour les Systèmes de Production - UL2 - Université Lumière - Lyon 2 - UCBL - Université Claude Bernard Lyon 1 - Université de Lyon - INSA Lyon - Institut National des Sciences Appliquées de Lyon - Université de Lyon - INSA - Institut National des Sciences Appliquées)

  • Jose Francisco Ferreira Ribeiro

    (USP - Universidade de São Paulo = University of São Paulo)

Abstract

This article studies the impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem. Each agent has a work contract with a weekly and daily work capacity. The company has to create a planning for its agents to fulfil the customers' demands. When assigning agents to specific demands, three different objectives have to be attained, including minimising the travel costs between agents' home and their workplace, and maximising agents' satisfaction related to the workload balance between them, and to their preferences for certain working periods. In the context of the evolution of the demands over time, the company has to introduce different levers to increase the level of workforce flexibility. Flexible work contracts and multiple skills are the two levers that are focused on here. The mixed integer linear programming method is used to model and solve the problem. Numerical experiments with real data provided by a Brazilian company show the positive impact of these two levers on the feasibility of problem solving and on the quality of the solutions obtained. Different managerial recommendations based on these results are proposed to companies to help improve their strategy for workforce development.

Suggested Citation

  • Minh Phuoc Doan & Julien Fondrevelle & Valérie Botta-Genoulaz & Jose Francisco Ferreira Ribeiro, 2022. "Impact of flexible work contracts and multi-skilled agents on a multi-objective workforce planning problem," Post-Print hal-03119408, HAL.
  • Handle: RePEc:hal:journl:hal-03119408
    DOI: 10.1080/00207543.2020.1867922
    Note: View the original document on HAL open archive server: https://hal.science/hal-03119408
    as

    Download full text from publisher

    File URL: https://hal.science/hal-03119408/document
    Download Restriction: no

    File URL: https://libkey.io/10.1080/00207543.2020.1867922?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Parisio, Alessandra & Neil Jones, Colin, 2015. "A two-stage stochastic programming approach to employee scheduling in retail outlets with uncertain demand," Omega, Elsevier, vol. 53(C), pages 97-103.
    2. Hertz, Alain & Lahrichi, Nadia & Widmer, Marino, 2010. "A flexible MILP model for multiple-shift workforce planning under annualized hours," European Journal of Operational Research, Elsevier, vol. 200(3), pages 860-873, February.
    3. Rong Chen & Changyong Liang & Dongxiao Gu & Joseph Y-T. Leung, 2017. "A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution," International Journal of Production Research, Taylor & Francis Journals, vol. 55(21), pages 6207-6234, November.
    4. Ferdinand Kiermaier & Markus Frey & Jonathan F. Bard, 2020. "The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers," Journal of Scheduling, Springer, vol. 23(2), pages 177-209, April.
    5. Pastor, Rafael & Olivella, Jordi, 2008. "Selecting and adapting weekly work schedules with working time accounts: A case of a retail clothing chain," European Journal of Operational Research, Elsevier, vol. 184(1), pages 1-12, January.
    6. Braekers, Kris & Hartl, Richard F. & Parragh, Sophie N. & Tricoire, Fabien, 2016. "A bi-objective home care scheduling problem: Analyzing the trade-off between costs and client inconvenience," European Journal of Operational Research, Elsevier, vol. 248(2), pages 428-443.
    7. Biao Yuan & Ran Liu & Zhibin Jiang, 2015. "A branch-and-price algorithm for the home health care scheduling and routing problem with stochastic service times and skill requirements," International Journal of Production Research, Taylor & Francis Journals, vol. 53(24), pages 7450-7464, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Pahlevani, Delaram & Abbasi, Babak & Hearne, John W. & Eberhard, Andrew, 2022. "A cluster-based algorithm for home health care planning: A case study in Australia," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 166(C).
    2. Mou, Shandong & Robb, David J. & DeHoratius, Nicole, 2018. "Retail store operations: Literature review and research directions," European Journal of Operational Research, Elsevier, vol. 265(2), pages 399-422.
    3. Paraskevopoulos, Dimitris C. & Laporte, Gilbert & Repoussis, Panagiotis P. & Tarantilis, Christos D., 2017. "Resource constrained routing and scheduling: Review and research prospects," European Journal of Operational Research, Elsevier, vol. 263(3), pages 737-754.
    4. Zheng, Chenyang & Wang, Shuming & Li, Ningxin & Wu, Yuanhao, 2021. "Stochastic joint homecare service and capacity planning with nested decomposition approaches," European Journal of Operational Research, Elsevier, vol. 295(1), pages 203-222.
    5. Zhan, Yang & Wang, Zizhuo & Wan, Guohua, 2021. "Home service routing and appointment scheduling with stochastic service times," European Journal of Operational Research, Elsevier, vol. 288(1), pages 98-110.
    6. Neda Tanoumand & Tonguç Ünlüyurt, 2021. "An exact algorithm for the resource constrained home health care vehicle routing problem," Annals of Operations Research, Springer, vol. 304(1), pages 397-425, September.
    7. Egbert Veen & Erwin Hans & Bart Veltman & Leo Berrevoets & Hubert Berden, 2015. "A case study of cost-efficient staffing under annualized hours," Health Care Management Science, Springer, vol. 18(3), pages 279-288, September.
    8. Tsang, Man Yiu & Shehadeh, Karmel S., 2023. "Stochastic optimization models for a home service routing and appointment scheduling problem with random travel and service times," European Journal of Operational Research, Elsevier, vol. 307(1), pages 48-63.
    9. Gang Du & Luyao Zheng & Xiaoling Ouyang, 2019. "Real-time scheduling optimization considering the unexpected events in home health care," Journal of Combinatorial Optimization, Springer, vol. 37(1), pages 196-220, January.
    10. Jiao Zhao & Tao Wang & Thibaud Monteiro, 2024. "A Bi-Objective Home Health Care Routing and Scheduling Problem under Uncertainty," IJERPH, MDPI, vol. 21(3), pages 1-27, March.
    11. Pouria Khodabandeh & Vahid Kayvanfar & Majid Rafiee & Frank Werner, 2021. "A Bi-Objective Home Health Care Routing and Scheduling Model with Considering Nurse Downgrading Costs," IJERPH, MDPI, vol. 18(3), pages 1-24, January.
    12. Li, Yanfeng & Xiang, Ting & Szeto, Wai Yuen, 2021. "Home health care routing and scheduling problem with the consideration of outpatient services," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 152(C).
    13. Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
    14. Mahyar Mirabnejad & Hadi Mohammadi & Mehrdad Mirzabaghi & Amir Aghsami & Fariborz Jolai & Maziar Yazdani, 2022. "Home Health Care Problem with Synchronization Visits and Considering Samples Transferring Time: A Case Study in Tehran, Iran," IJERPH, MDPI, vol. 19(22), pages 1-25, November.
    15. Gomes, Maria Isabel & Ramos, Tânia Rodrigues Pereira, 2019. "Modelling and (re-)planning periodic home social care services with loyalty and non-loyalty features," European Journal of Operational Research, Elsevier, vol. 277(1), pages 284-299.
    16. Zhiping Zuo & Yanhui Li & Jing Fu & Jianlin Wu, 2019. "Human Resource Scheduling Model and Algorithm with Time Windows and Multi-Skill Constraints," Mathematics, MDPI, vol. 7(7), pages 1-18, July.
    17. Arda, Yasemin & Cattaruzza, Diego & François, Véronique & Ogier, Maxime, 2024. "Home chemotherapy delivery: An integrated production scheduling and multi-trip vehicle routing problem," European Journal of Operational Research, Elsevier, vol. 317(2), pages 468-486.
    18. Şeyma Güven-Koçak & Aliza Heching & Pınar Keskinocak & Alejandro Toriello, 2024. "Continuity of care in home health care scheduling: a rolling horizon approach," Journal of Scheduling, Springer, vol. 27(4), pages 375-392, August.
    19. Wang, Xiong & Ferreira, Fernando A.F. & Chang, Ching-Ter, 2022. "Multi-objective competency-based approach to project scheduling and staff assignment: Case study of an internal audit project," Socio-Economic Planning Sciences, Elsevier, vol. 81(C).
    20. Shima Azizi & Özge Aygül & Brenton Faber & Sharon Johnson & Renata Konrad & Andrew C. Trapp, 2023. "Select, route and schedule: optimizing community paramedicine service delivery with mandatory visits and patient prioritization," Health Care Management Science, Springer, vol. 26(4), pages 719-746, December.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-03119408. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.