Lunar architecture and technology analysis driven by lunar science scenarios
Author
Abstract
Suggested Citation
DOI: 10.1002/sys.20144
Download full text from publisher
References listed on IDEAS
- David G. Luenberger & Yinyu Ye, 2008. "Linear and Nonlinear Programming," International Series in Operations Research and Management Science, Springer, edition 0, number 978-0-387-74503-9, April.
- Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
- A. Elfes & C. R. Weisbin & R. Manvi & V. Adumitroaie & W. P. Lincoln & K. Shelton, 2006. "Extending the START framework: Computation of optimal capability development portfolios using a decision theory approach," Systems Engineering, John Wiley & Sons, vol. 9(4), pages 331-357, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Asbach, Lasse & Dorndorf, Ulrich & Pesch, Erwin, 2009. "Analysis, modeling and solution of the concrete delivery problem," European Journal of Operational Research, Elsevier, vol. 193(3), pages 820-835, March.
- Wendi Tian & Erik Demeulemeester, 2014. "Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment," Annals of Operations Research, Springer, vol. 213(1), pages 271-291, February.
- Byung-Cheon Choi & Changmuk Kang, 2019. "A linear time–cost tradeoff problem with multiple milestones under a comb graph," Journal of Combinatorial Optimization, Springer, vol. 38(2), pages 341-361, August.
- Andrzej Kozik, 2017. "Handling precedence constraints in scheduling problems by the sequence pair representation," Journal of Combinatorial Optimization, Springer, vol. 33(2), pages 445-472, February.
- Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
- Shahmohammadi, Ali & Sioshansi, Ramteen & Conejo, Antonio J. & Afsharnia, Saeed, 2018. "Market equilibria and interactions between strategic generation, wind, and storage," Applied Energy, Elsevier, vol. 220(C), pages 876-892.
- Rolf H. Möhring & Andreas S. Schulz & Frederik Stork & Marc Uetz, 2003. "Solving Project Scheduling Problems by Minimum Cut Computations," Management Science, INFORMS, vol. 49(3), pages 330-350, March.
- Ilkyeong Moon & Sanghyup Lee & Moonsoo Shin & Kwangyeol Ryu, 2016. "Evolutionary resource assignment for workload-based production scheduling," Journal of Intelligent Manufacturing, Springer, vol. 27(2), pages 375-388, April.
- Alp Atakan & Mehmet Ekmekci & Ludovic Renou, 2021.
"Cross-verification and Persuasive Cheap Talk,"
Papers
2102.13562, arXiv.org, revised Apr 2021.
- Renou, Ludovic & Atakan, Alp & Ekmekci, Mehmet, 2021. "Cross-verification and Persuasive Cheap Talk," CEPR Discussion Papers 16801, C.E.P.R. Discussion Papers.
- Arthur Medeiros & Thales Ramos & José Tavares de Oliveira & Manoel F. Medeiros Júnior, 2020. "Direct Voltage Control of a Doubly Fed Induction Generator by Means of Optimal Strategy," Energies, MDPI, vol. 13(3), pages 1-28, February.
- Park, Jongyoon & Han, Jinil & Lee, Kyungsik, 2024. "Integer optimization models and algorithms for the multi-period non-shareable resource allocation problem," European Journal of Operational Research, Elsevier, vol. 317(1), pages 43-59.
- Mattfeld, D. C. & Kopfer, H., 2003. "Terminal operations management in vehicle transshipment," Transportation Research Part A: Policy and Practice, Elsevier, vol. 37(5), pages 435-452, June.
- Ivorra, Benjamin & Mohammadi, Bijan & Manuel Ramos, Angel, 2015. "A multi-layer line search method to improve the initialization of optimization algorithms," European Journal of Operational Research, Elsevier, vol. 247(3), pages 711-720.
- Tanaka, Ken'ichiro & Toda, Alexis Akira, 2015.
"Discretizing Distributions with Exact Moments: Error Estimate and Convergence Analysis,"
University of California at San Diego, Economics Working Paper Series
qt7g23r5kh, Department of Economics, UC San Diego.
- Tanaka, Ken'ichiro & Toda, Alexis Akira, 2015. "Discretizing Distributions with Exact Moments: Error Estimate and Convergence Analysis," University of California at San Diego, Economics Working Paper Series qt2tc0m67t, Department of Economics, UC San Diego.
- Ashrafi, M. & Khanjani, M.J. & Fadaei-Kermani, E. & Barani, G.A., 2015. "Farm drainage channel network optimization by improved modified minimal spanning tree," Agricultural Water Management, Elsevier, vol. 161(C), pages 1-8.
- M. Vanhoucke, 2006.
"A scatter search procedure for maximizing the net present value of a project under renewable resource constraints,"
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium
06/417, Ghent University, Faculty of Economics and Business Administration.
- Vanhoucke, M., 2006. "A scatter search procedure for maximizing the net present value of a project under renewable resource constraints," Vlerick Leuven Gent Management School Working Paper Series 2006-40, Vlerick Leuven Gent Management School.
- Ip, W. H. & Yung, K. L. & Wang, Dingwei, 2004. "A branch and bound algorithm for sub-contractor selection in agile manufacturing environment," International Journal of Production Economics, Elsevier, vol. 87(2), pages 195-205, January.
- Sergey Badikov & Antoine Jacquier & Daphne Qing Liu & Patrick Roome, 2016. "No-arbitrage bounds for the forward smile given marginals," Papers 1603.06389, arXiv.org, revised Oct 2016.
- Dieter Debels & Mario Vanhoucke, 2007. "A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem," Operations Research, INFORMS, vol. 55(3), pages 457-469, June.
- Szidarovszky, Ferenc & Luo, Yi, 2014. "Incorporating risk seeking attitude into defense strategy," Reliability Engineering and System Safety, Elsevier, vol. 123(C), pages 104-109.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:syseng:v:13:y:2010:i:3:p:217-231. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6858 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.